FORD FLTM BU 154-02-2016 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01).pdf
《FORD FLTM BU 154-02-2016 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01).pdf》由会员分享,可在线阅读,更多相关《FORD FLTM BU 154-02-2016 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01).pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、 FORD LABORATORY TEST METHOD BU 154-02 Date Action Revisions Rev 01 2016 07 08 Revised See Summary of Revisions J. Richardson, P. Konopka, NA 2006 12 11 Activated H. Kon, M. Mehandru Copyright 2016, Ford Global Technologies, LLC Page 1 of 2 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST
2、 (FLTM BU 154-01) Application This procedure is used to prepare painted test unit and validate the integrity of the direct glazing system through production process conditions. Test units will be subject to evaluation via Quick Knife Adhesion Test, FLTM BU 154-01. Abstract Process body-in-white unit
3、 through production Paint process. Install windshield, backlite, and quarter glass, if applicable, to painted unit using production/design intent direct glazing materials and process. Evaluate integrity of bond to validate direct glazing material compatibility to production paint system. Apparatus a
4、nd Materials Required BIW body(s) with closure panels Production Paint Shop Production Paint Materials Oven Temperature Profiles Paint film build measuring device Production Glass (Windshield, Backlite, Qtr Glass) Production Glass installation aids o Masking Tape o “Piano Keys“ Production Direct Gla
5、zing Materials o Glass Primers o Urethane Adhesive Supporting documents: o FLTM BU 154-01 o AVP-T118-001 FORD LABORATORY TEST METHOD BU 154-02 Copyright 2016, Ford Global Technologies, LLC Page 2 of 2 Procedure Painted Unit Preparation Procedure: Oven Profile for test unit (or from same production s
6、hift) shall be made available to confirm production representative processing conditions. 1. Process test unit through complete Paint Shop process a. Measure film builds on glass bonding flanges/surfaces per Program specific requirements for each paint layer b. Basecoat color will be determined by P
7、aint Engineering and Material Engineering prior to build c. Number of units required will be determined by Paint Engineering, Material Engineering prior to build (typically two units in two colors required) 2. Allow test unit to reach temperature equilibrium 3. Determine the longest length of time f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMBU154022016WINDSHIELDCUTOUTEVALUATIONVIAQUICKKNIFEADHESIONTESTFLTMBU15401PDF

链接地址:http://www.mydoc123.com/p-747558.html