1、Designation: F3038 14Standard Test Method forTimed Evaluation of Forced-Entry-Resistant Systems1This standard is issued under the fixed designation F3038; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method sets forth the requirements and testingprocedures to test forced-entry-resistant building components,construction com
3、ponents, and specialty security equipment.This test method is intended primarily for manufacturers to testand rate their windows, doors, modular panels, glazings,louvers, walls, seismic joints, roofs, roof hatches, grilles, andsimilar products to ensure that all manufactured products meetthe necessa
4、ry requirements for forced-entry protection.1.2 This test method is currently designed to simulate aspontaneous mob using readily available hand tools as theprimary threat for forced entry.1.3 In order to receive a rating, all portions of the testedspecimen must meet or exceed the test level.1.4 Sys
5、tems are required to be tested as complete units in atest frame or fielded conditions. Mulled systems must be testedin the mulled condition. Test results only apply to the compo-nent or system as tested. Once a system is tested and deemedto satisfy the requirements of this test method, no designchan
6、ge can be made without a retest.1.5 UnitsThe values stated in this standard are SI unitswith the exception of the nominal descriptors for tools.1.6 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standa
7、rd to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E631 Terminology of Building ConstructionsE2771 Terminology for Homeland Security ApplicationsF1915 Test Methods for Glazing for
8、 Detention Facilities2.2 Other Standards:SD-STD-01.01 Forced-Entry and Ballistic-Resistance ofStructural Systems, Rev. G (Amended)3ISO/IEC 17025:2005 General Requirements for the Compe-tence of Testing and Calibration Laboratories43. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.
9、1 componentintegral part of a forced entry test speci-men such as: panels, frame, glazing, glazing bite, flanges,hinges, locks, jamb/wall, jamb/strike mullions, and mountingdevices of different shape, size, and material.3.1.2 door, doubletwo-door assembly with an openingtwice as wide as a single doo
10、r with a common latch and lockedge.3.1.3 independent test facilitytesting laboratory accreditedto perform the referenced testing procedures by a nationallyrecognized accrediting agency in accordance with ISO/IEC17025.3.1.4 individual systemsindividual doors, windows,louvers, hatches, grilles, or wal
11、l panels. The doors, windows,and panels may have one transparency or two or moretransparencies separated with a mullion.3.1.5 louversangled and gapped slats which permit thepassage of air through an otherwise impassable barrier. Whilelouvers usually are rigidly constructed, the slats may bemoveable
12、to seal off air passage.3.1.5.1 manufacturer-delivered systemsincludes both in-dividual and mulled systems.3.1.6 mulliona component used to divide two parts of thesame system and it can be vertical or horizontal, movable orfixed. For purposes of this test method, a mullion does notinclude steel or c
13、oncrete structural members (including seismicjoints) which are present in the building.3.1.7 mulledthe physical connection together of two partsof the same system. The two systems may be anchored directlyto each other or have a mullion between them.1This test method is under the jurisdiction of ASTM
14、 Committee F12 on SecuritySystems and Equipment and is the direct responsibility of Subcommittee F12.10 onSystems Products and Services.Current edition approved April 15, 2014. Published May 2014. DOI: 10.1520/F3038-14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact A
15、STM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from U.S. Government Printing Office Superintendent of Documents,732 N. Capitol St., NW, Mail Stop: SDE, Washington, DC 20401, http
16、:/www.access.gpo.gov.4Available from International Organization for Standardization (ISO), 1, ch. dela Voie-Creuse, CP 56, CH-1211 Geneva 20, Switzerland, http:/www.iso.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.1.8 ready-t
17、o-installfabricated, with an appropriate finalfinish such as galvanizing, paint, or anodizing. The testspecimen shall consist of the entire fenestration assembly andcontain all devices used to resist forced entry. All parts of thetest specimen shall be full size, as specified for actual use,using th
18、e identical materials, details, and methods of construc-tion.3.1.9 systemthe assembly of structural elements and de-vices which comprise the forced-entry-resistant barrier.3.1.10 shop assembly drawinga drawing which showshow a system is assembled including the locations, dimensions,and arrangements
19、of all assembly elements such as bolts,glazing stops, and glazing spacers.3.1.11 Test:3.1.11.1 concentrated assaulttest of forced entry attackusing test tools on one dissimilar component in an attempt tocreate an opening and permit passage of the test shape.3.1.11.2 failure criteriaany failure of th
20、e manufacturersrecommended mounting hardware or penetration of any por-tion of the system sufficient to permit passage of the test shapewithin the times of the FE concentrated assault test.3.1.11.3 test directorthe individual identified by the inde-pendent testing laboratory as being responsible to
21、complete thespecified tests as required and to document the results, inaccordance with this test method.3.1.11.4 test facilitylaboratory or other area where forced-entry testing is conducted.3.1.11.5 test fixturethe structural assembly which holdsthe test specimen.3.1.11.6 test levelsthe increments
22、to which systems aretested through manual attack with a specific set of tools andweapons.3.1.11.7 test personnel/test teamthose personnel activelyengaged in the Concentrated Assault Test but not including theTest Director, data recorders, or other supervisory personnel.3.1.11.8 test planea plane par
23、allel and contiguous to theface of the attack side of the test sample.3.1.11.9 testing reporta report provided by the test facilitythat includes configuration documentation, any applicableabnormality, forced-entry testing data and photographs, acertification of testing, a narrative summary of testin
24、g, time-stamped drawings that have been validated to match the testspecimen, and all video recording(s) of testing.3.1.11.10 test shapea non-compressible, rigid, ellipticalcylinder made of solidly bonded particle board or medium-density fiberboard (MDF) layers measuring 400 mm major axisby 225 mm mi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF30382014STANDARDTESTMETHODFORTIMEDEVALUATIONOFFORCEDENTRYRESISTANTSYSTEMS 阻止 强制 进入 系统 计时 评估 标准 试验

链接地址:http://www.mydoc123.com/p-539933.html