ASTM A979 A979M-2003(2014)e1 Standard Specification for Concrete Pavements and Linings Installed in Corrugated Steel Structures in the Field《现场安装于波纹钢结构件中的混凝土铺面和衬里的标准规格》.pdf
《ASTM A979 A979M-2003(2014)e1 Standard Specification for Concrete Pavements and Linings Installed in Corrugated Steel Structures in the Field《现场安装于波纹钢结构件中的混凝土铺面和衬里的标准规格》.pdf》由会员分享,可在线阅读,更多相关《ASTM A979 A979M-2003(2014)e1 Standard Specification for Concrete Pavements and Linings Installed in Corrugated Steel Structures in the Field《现场安装于波纹钢结构件中的混凝土铺面和衬里的标准规格》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: A979/A979M 03 (Reapproved 2014)1Standard Specification forConcrete Pavements and Linings Installed in CorrugatedSteel Structures in the Field1This standard is issued under the fixed designation A979/A979M; the number immediately following the designation indicates the yearof original ad
2、option or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEReferenced Documents section updated editorially in October 2014.1. Scope1.1
3、This specification covers the minimum material require-ments and describes the procedures for installing concretepavements and linings in corrugated steel pipes and structuralplate structures in the field. Specific designs with additional orgreater requirements shall be detailed in the contract docu
4、-ments. This specification is applicable to paving or lining newpipes and for rehabilitating existing structures. The pipe to bepaved or lined is described in Specifications A760/A760M,A761/A761M, and A762/A762M.1.2 This specification covers pipes 48 in. 1 200 mm andlarger for pavements and 24 in. 6
5、00 mm and larger for fulllinings.1.3 New pipes are to be designed in accordance withPractice A796/A796M and installed in accordance with Prac-tice A798/A798M for factory-made pipes and Practice A807/A807M for structural plate structures. Structures to be reha-bilitated shall be structurally stable.1
6、.4 Pipes with plant installed concrete pavements and lin-ings are covered under Specification A849.1.5 This specification is applicable to product in eitherinch/pound units as A979 or in SI units as A979M. Inch/poundunits and SI units are not necessarily equivalent. SI units areshown in brackets in
7、the text for clarity, but they are theapplicable values when materials are ordered to A979M.1.6 This standard may involve hazardous materials, opera-tions and equipment. The standard does not purport to addressall of the safety concerns, if any, associated with its use. It isthe responsibility of th
8、e user of this standard to establishappropriate safety and health practices and determine theapplicability of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2A1064/A1064M Specification for Carbon-Steel Wire andWelded Wire Reinforcement, Plain and Deformed, forConcreteA
9、615/A615M Specification for Deformed and Plain Carbon-Steel Bars for Concrete ReinforcementA760/A760M Specification for Corrugated Steel Pipe,Metallic-Coated for Sewers and DrainsA761/A761M Specification for Corrugated Steel StructuralPlate, Zinc-Coated, for Field-Bolted Pipe, Pipe-Arches,and Arches
10、A762/A762M Specification for Corrugated Steel Pipe, Poly-mer Precoated for Sewers and DrainsA796/A796M Practice for Structural Design of CorrugatedSteel Pipe, Pipe-Arches, and Arches for Storm and Sani-tary Sewers and Other Buried ApplicationsA798/A798M Practice for Installing Factory-Made Corru-gat
11、ed Steel Pipe for Sewers and Other ApplicationsA807/A807M Practice for Installing Corrugated Steel Struc-tural Plate Pipe for Sewers and Other ApplicationsA849 Specification for Post-Applied Coatings, Pavings, andLinings for Corrugated Steel Sewer and Drainage PipeA902 Terminology Relating to Metall
12、ic Coated Steel Prod-uctsC31/C31M Practice for Making and Curing Concrete TestSpecimens in the FieldC33 Specification for Concrete AggregatesC39/C39M Test Method for Compressive Strength of Cylin-drical Concrete SpecimensC150 Specification for Portland CementC309 Specification for Liquid Membrane-Fo
13、rming Com-pounds for Curing ConcreteC595 Specification for Blended Hydraulic CementsC618 Specification for Coal Fly Ash and Raw or CalcinedNatural Pozzolan for Use in Concrete1This specification is under the jurisdiction of ASTM Committee A05 onMetallic-Coated Iron and Steel Productsand is the direc
14、t responsibility of Subcom-mittee A05.17 on Corrugated Steel Pipe Specifications.Current edition approved Oct. 1, 2014. Published October 2014. Originallyapproved in 1997. Last previous edition approved in 2009 as A979/A979M - 09.DOI: 10.1520/A0979_A0979M-03R14E01.2For referenced ASTM standards, vis
15、it the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 1
16、00 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1D6690 Specification for Joint and Crack Sealants, HotApplied, for Concrete and Asphalt Pavements2.2 American Water Works Association Standards:AWWA C602 Standards for Cement-Mortar Lining of WaterPipelines-4 in. (100
17、mm) and larger-in place33. Terminology3.1 DefinitionsFor definitions of general terms used in thisspecification, see Terminology A902.3.2 Definitions of Terms Specific to This Standard:3.2.1 contractor, nthe installer or applicator of the con-crete pavement of lining.3.2.2 engineer, nthe designer of
18、 the work and its details.3.2.3 fabricator, nthe producer of the pipe.3.2.4 lining, nfor corrugated metal pipe, a layer of non-metallic material applied uniformly to the interior of a fabri-cated pipe, of sufficient thickness to fill and cover the corru-gations.3.2.5 pavement, nfor corrugated metal
19、pipe, a liningapplied only to a portion of the interior circumference, usuallylocated in the lower portion (as the pipe is installed).3.2.6 purchaser, nthe person or agency purchasing thefinished product.4. Requirements4.1 Concrete PavementsConcrete pavements shall beplaced after the pipe has been i
20、nstalled. For new pipes,pavements shall be placed after the pipe is backfilled to finalgrade. If the depth of fill exceeds four feet, the pavement maybe placed after four feet of backfill over the pipe has beenplaced. If the paving is placed prior to completion of the entirefill, any gaps between th
21、e pipe and pavement shall be filledwith heated joint sealer conforming to Specification D6690.Special pavement designs, which exceed the minimum require-ments of this specification, shall be detailed in the job plansand specifications. In lieu of special designs, pavements shallextend over the area
22、to be protected or rehabilitated. Invertpavements shall cover a minimum of the bottom 25 % of around pipes circumference and 40 % of the circumference ofa pipe-arch (the invert of the pipe-arch), unless a special designis detailed in the plans and specifications.4.1.1 The concrete for pavements shal
23、l have a minimum28-day compressive strength of 3250 psi 22.4 MPa whentested in accordance with Specification C31/C31M and TestMethod C39/C39M. The pavement shall have a minimum 3 in.75-mm thickness above the crests of the corrugations orstructural plate bolts or nuts as applicable.4.1.2 A minimum pa
24、vement thickness of 1-12 in. 38 mmabove the crests of the corrugations or structural plate bolts ornuts as applicable is required if concrete with a 28-dayminimum compressive strength of 5 000 psi 34.5 MPa whentested in accordance with Specification C31/C31M and TestMethod C39/C39M, is used.NOTE 1Fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMA979A979M20032014E1STANDARDSPECIFICATIONFORCONCRETEPAVEMENTSANDLININGSINSTALLEDINCORRUGATEDSTEELSTRUCTURESINTHEFIELD

链接地址:http://www.mydoc123.com/p-460216.html