ABS 176-2015 GUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS.pdf
《ABS 176-2015 GUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS.pdf》由会员分享,可在线阅读,更多相关《ABS 176-2015 GUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS.pdf(141页珍藏版)》请在麦多课文档分享上搜索。
1、 Guide for Building and Classing Bottom-Founded Offshore Wind Turbine Installations GUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS OCTOBER 2015 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2015 American Bur
2、eau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword This Guide provides criteria for the design, construction, installation and survey of Bottom-Founded Offshore Wind Turbine Installations, which comprise permanently sited support structures and foundations of of
3、fshore wind turbines attached on and supported by the sea floor. The criteria applicable to floating offshore wind turbine installations are provided in the ABS Guide for Building and Classing Floating Offshore Wind Turbine Installations (FOWTI Guide). Requirements for ancillary offshore wind farm i
4、nstallations such as meteorological measuring towers, accommodation units, and transformer platforms are not addressed in this Guide. For the requirements for such bottom-founded installations, refer to the ABS Rules for Building and Classing Offshore Installations This revision incorporates the fol
5、lowing changes: 1-1/3 A new optional class notion for the Rotor-Nacelle Assembly (RNA) is offered. 1-2/9 More specific requirements were added regarding the number of turbines subject to commissioning surveys as well as the scope of commissioning survey. These requirements are adapted from the curre
6、nt FOWTI Guide and are in line with IEC 61400-3. 3-6/15 Guidance is provided on how the site assessment should be done with regard to electric network conditions. 4-2/3 Further clarification for the return period of the design storms in tropical cyclone prone areas is added. 4-2/Table 1 Additional r
7、equirements are provided for considering the directionality of wind and wave that may cause misaligned wave and wind conditions. A new design load case (new DLC 8.2) is added to account for possible fatigue damage during the temporary phase. Appendix 2 A new Appendix is added detailing the tropical
8、cyclone wind model developed based on the measurements of tropcial cyclone wind in the past 20 years. Appendix 3 A new Appendix is added that provides guidance on fatigue analysis of support structures. This Guide becomes effective on the first day of the month of publication. Users are advised to c
9、heck periodically on the ABS website www.eagle.org to verify that this version of this Guide is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. ii ABSGUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLA
10、TIONS .2015 Table of Contents GUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS CONTENTS CHAPTER 1 Classification and Surveys 1 Section 1 Scope and Conditions of Classification . 4 Section 2 Surveys During Construction, Installation, and Commissioning 10 Section 3 Su
11、rveys After Construction 17 Section 4 Definitions 22 CHAPTER 2 Materials and Welding . 26 Section 1 Materials 28 Section 2 Welding and Fabrication 37 CHAPTER 3 Environmental Conditions . 44 Section 1 Overview 46 Section 2 Wind . 47 Section 3 Waves 55 Section 4 Currents . 60 Section 5 Tides, Storm Su
12、rges, and Water Levels 62 Section 6 Other Conditions 64 CHAPTER 4 Loads . 66 Section 1 Overview 67 Section 2 Design Load Conditions . 69 Section 3 Determination of Environmental Loads 79 CHAPTER 5 Structure and Foundation Design 85 Section 1 General Design Requirements 88 Section 2 Steel Structures
13、. 92 Section 3 Concrete Structures . 99 Section 4 Foundations . 111 ABSGUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS .2015 iii CHAPTER 6 Marine Operations 120 Section 1 Marine Operations . 121 APPENDIX 1 Wind Spectra and Coherence Functions 123 APPENDIX 2 Tropica
14、l Cyclone Wind Speed Profile, Standard Deviation, Turbulence Intensity and Gust Factor 127 APPENDIX 3 Fatigue Analysis for the Support Structures . 132 APPENDIX 4 Abbreviations and References 135 iv ABSGUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS .2015 Chapter 1
15、: Classification and Surveys CHAPTER 1 Classification and Surveys CONTENTS SECTION 1 Scope and Conditions of Classification . 4 1 Classification . 4 3 Classification Symbols and Notations . 4 3.1 Installations Built under ABS Survey . 4 3.3 Installations Not Built under ABS Survey 4 3.5 Additional C
16、lass Notation 4 5 Rules for Classification . 5 5.1 Application . 5 5.3 References 5 5.5 Alternatives 5 7 Design Documentation to be Submitted . 5 7.1 Reports 6 7.3 Design Data and Calculations . 7 7.5 Plans and Specifications . 8 7.7 Information Memorandum . 8 9 Operating Manual . 9 SECTION 2 Survey
17、s During Construction, Installation, and Commissioning 10 1 Overview . 10 1.1 Scope 10 1.3 Quality Control Program 10 1.5 Access and Notification . 10 1.7 Identification of Materials . 10 3 Steel Structures 11 3.1 Quality Control Program 11 3.3 Material Quality and Traceability . 11 3.5 Steel Formin
18、g 11 3.7 Welder Qualification and Records . 11 3.9 Welding Procedure Specifications and Qualifications . 12 3.11 Weld Inspection . 12 3.13 Tolerances and Alignments . 12 3.15 Corrosion Control Systems 12 3.17 Tightness and Hydrostatic Testing Procedures . 12 3.19 Nondestructive Testing 12 3.21 Insta
19、llation of the Support Structure (Foundation, Substructure, and Tower) 12 3.23 Testing and Trials of a Self-Elevating Unit to be Used as the Support Structure 13 3.25 Records . 13 ABSGUIDE FOR BUILDING AND CLASSING BOTTOM-FOUNDED OFFSHORE WIND TURBINE INSTALLATIONS .2015 1 5 Concrete Structures 13 5
20、.1 Quality Control Program 13 5.3 Inspections Prior to Concreting 14 5.5 Inspection of Batching, Mixing, and Placing Concrete . 14 5.7 Inspections of Form Removal and Concrete Curing 14 5.9 Inspection of Prestressing and Grouting 15 5.11 Inspection of Joints 15 5.13 Inspection of Finished Concrete 1
21、5 5.15 Installation of the Support Structure (Foundation, Substructure and Tower) 15 5.17 Records . 16 7 Rotor-Nacelle Assemblies (RNAs) 16 9 Commissioning Surveys . 16 SECTION 3 Surveys After Construction . 17 1 Condition for Surveys after Construction 17 1.1 Damage, Failure, and Repair . 17 1.3 No
22、tification and Availability for Survey . 17 1.5 Annual Surveys . 17 1.7 Special Periodical Surveys 18 1.9 Continuous Surveys . 18 1.11 Reactivation Surveys . 18 1.13 Incomplete Surveys . 18 1.15 Alterations 18 1.17 Survey of a Self-Elevating Unit to be Used as the Support Structure 18 1.19 Survey fo
23、r Extension of Use 18 1.21 Relocation of Existing Installations 19 3 Annual Surveys . 19 5 Special Periodical Surveys . 20 7 Continuous Surveys 20 9 Gauging . 20 11 Structural Deterioration . 20 13 Marine Growth 21 15 Maintenance of Rotor-Nacelle Assembly 21 17 Statutory Certification 21 19 Risk-bas
24、ed Surveys for Maintenance of Class . 21 SECTION 4 Definitions . 22 1 Types of Support Structures . 22 1.1 Pile-Supported Structure . 22 1.3 Gravity Structure 22 1.5 Self-Elevating Unit to be Used as the Support Structure . 22 1.7 Compliant Tower 22 3 Terminology 22 3.1 Material Application Categori
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS1762015GUIDEFORBUILDINGANDCLASSINGBOTTOMFOUNDEDOFFSHOREWINDTURBINEINSTALLATIONSPDF

链接地址:http://www.mydoc123.com/p-400688.html