《SAE J 381-2009 Windshield Defrosting Systems Test Procedure and Performance Requirements Trucks Buses and Multipurpose Vehicles《卡车、公共汽车和多用途汽车的挡风玻璃防霜系统试验规程和性能要求》.pdf》由会员分享,可在线阅读,更多相关《SAE J 381-2009 Windshield Defrosting Systems Test Procedure and Performance Requirements Trucks Buses and Multipurpose Vehicles《卡车、公共汽车和多用途汽车的挡风玻璃防霜系统试验规程和性能要求》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、_SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising theref
2、rom, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be reaffirmed, revised, or cancelled. SAE invites your written comments and suggestions. Copyright 2009 SAE International All rights reserved. No part of this publication ma
3、y be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: 724-776-4970 (outside USA)
4、Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.orgSURFACEVEHICLERECOMMENDEDPRACTICEJ381 JAN2009 Issued 1968-02Revised 2009-01 Superseding J381 SEP2000 (R) Windshield Defrosting Systems Test Procedure and Performance RequirementsTrucks, Buses, and Multipurpose Vehicles
5、 RATIONALEThe current SAE J381 test procedure provides two separate means of heating the coolant during testing, but these two approaches can provide very different results. If the engine is used to heat the coolant, the engine rpm and engine load criteria are neither clear nor consistent. There are
6、 two distinct reasons to test a defrost system: a. To compare two or more alternative defroster systems during the design process. b. To compare the defroster performance of a specific vehicle and engine configuration to an established standard. This revision recognizes these differences in the reas
7、ons for testing, and provides specific test conditions depending on the test intent. Variations of the test between gasoline and diesel engines are eliminated with the rationale that how well the window clears should not be a function of the engine fuel source. Diesel and gasoline engines in the pas
8、t ran at very different rpms, but today most truck gasoline engines run high idle rpms at similar speeds when compared to their diesel counterparts. The chamber wind condition was increased to up to 5 mph because this is easier for all chambers to meet and this should not significantly affect the re
9、sults Updated the test report template to match the procedure References to the type of cameras that could be used were removed because such specific recommendations do not keep pace with advancements in technology. 1. SCOPE This SAE Recommended Practice establishes uniform test procedures and perfo
10、rmance requirements for the defrosting system of enclosed cab trucks, buses, and multipurpose vehicles. It is limited to a test that can be conducted on uniform test equipment in commercially available laboratory facilities. Current engineering practice prescribes that for laboratory evaluation of d
11、efroster systems, an ice coating of known thickness be applied to the windshield and left- and right-hand side windows to provide more uniform and repeatable test results, even though under actual conditions such a coating would necessarily be scraped off before driving. The test condition, therefor
12、e, represents a more severe condition than the actual condition, where the defroster system must merely be capable of maintaining a cleared viewing area. Copyright SAE International Provided by IHS under license with SAENot for ResaleNo reproduction or networking permitted without license from IHS-,
13、-,-SAE J381 Revised JAN2009 Page 2 of 10Because of the special nature of the operation of most of these vehicles (where vehicles are generally kept in a garage or warmed up before driving) and since defrosting under steady-state over-the-road operations is the main concern, test conditions have been
14、 adopted which assume that the engine is warm before the vehicle is driven. There are two options for producing hot coolant in this recommended practice. Testing using these two approaches on the same vehicle will not necessarily provide identical results. Many vehicle models are offered with option
15、al engines, and each engine has varying coolant temperatures and flow rates. If the test is being conducted to compare the performance of one defroster design to another defroster design, then the external coolant source approach (Test A) will yield the most comparable results. If the test is being
16、conducted to validate the defroster installation on a specific vehiclemodel with a specific engine, then using the engine to heat the coolant (Test B) will be more appropriate.This document will be reviewed and revised as technological progress in vehicle defroster test procedure requires. 2. REFERE
17、NCES 2.1 Applicable Publications The following publications form a part of the specification to the extent specified herein. Unless otherwise indicated, the latest revision of SAE publications shall apply. 2.1.1 SAE Publications Available from SAE International, 400 Commonwealth Drive, Warrendale, P
18、A 15096-0001, Tel: 877-606-7323 (inside USA and Canada) or 724-776-4970 (outside USA), www.sae.org.SAE J941 Motor Vehicle Drivers Eye Locations 3. DEFINITIONS 3.1 Defrost To remove ice or frost from the surface of automotive glass surfaces. 3.2 Windshield Defroster System A heating device designed t
19、o defrost the windshield and specified portions of the front right and front left side windows. 3.3 Defrosted Area That area of the glass surface that is free of frozen ice or frost. 3.4 Coolant Liquid used for heat transfer composed of 50% ethylene glycol/50% water or other liquids specified by veh
20、icle manufacturer for use in the heat transfer system. 3.5 Daylight Opening (DLO) The maximum opening of any glass aperture which is unobstructed by moldings, masking, or framing. 3.6 High Idle A feature provided by the vehicle OEM to run the engine above the normal idling speed, typically used to p
21、rovide additional power during operation of power take-off equipment or for warming up the engine. Copyright SAE International Provided by IHS under license with SAENot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SAE J381 Revised JAN2009 Page 3 of 104. DEFROSTING T
22、EST 4.1 General Purpose Requirements The windshield area to be defrosted was developed to be compatible with vision requirements necessary to operate trucks, buses, and multipurpose vehicles. The area is based on SAE J941 with certain modifications to accommodate the wide variety of conditions encou
23、ntered in these vehicles. For the purpose of this document, the head turn consideration in SAE J941 will not be used. 4.2 Test Equipment 4.2.1 Environmental chamber sufficiently large to contain the basic vehicle or basic vehicle body or partial body with provision for circulating air. 4.2.2 Means f
24、or recording the boundaries of the windshield areas defrosted (markers or photographic equipment). 4.2.3 Engine tachometer with an accuracy of 2% of observed values. 4.2.4 Stopwatch or other timing device. 4.2.5 Thermometers, thermocouples, or other temperature measuring devices with an accuracy of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEJ3812009WINDSHIELDDEFROSTINGSYSTEMSTESTPROCEDUREANDPERFORMANCEREQUIREMENTSTRUCKSBUSESANDMULTIPURPOSEVEHICLES

链接地址:http://www.mydoc123.com/p-1027029.html