SAE ARP 1172-1972 Filters Conventional Electromagnetic Interference Reduction General Specification for《降低电磁干扰的常规滤波器的通用规范》.pdf
《SAE ARP 1172-1972 Filters Conventional Electromagnetic Interference Reduction General Specification for《降低电磁干扰的常规滤波器的通用规范》.pdf》由会员分享,可在线阅读,更多相关《SAE ARP 1172-1972 Filters Conventional Electromagnetic Interference Reduction General Specification for《降低电磁干扰的常规滤波器的通用规范》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、 however, this inspection shall be invoked only by direction of the procuring activity. Sample units which have been subjected to group C inspection shall not be delivered on the contract or order. Noncompliance: if a sample fails to pass groupC inspection, the supplier shall take corrective action
2、on the materials or processes, or both, as warranted, on all units of product which can be corrected and which were manufactured under essentially the same conditions, with essentially the same materials, processes, etc, and which are considered subject to the same failure. Acceptance of the product
3、 shall be discontinued until corrective action, acceptable to the procuring activity, has been taken. After the cor- rective action has been taken, group C inspection shall be repeated on additional sample units (all inspec- tion, or the inspection which the original sample failed, at the option of
4、the procuring activity). Groups A and B inspection may be reinstituted: final acceptance shall be withheld until the group C reinspection has shown that the corrective action was successful. in the event of failure after reinspection, informa- tion concerning the failure and the corrective action ta
5、ken shall be furnished to the procuring activity. Retention of Qualification: In order to retain qualification, the manufacturer shall forward to the procur- ing activity a summary of the results of groups A and B tests indicating a_ a minimum the number of lots which passed and the number which fai
6、led, and a summary of the results of group C tests, including the number and type of any part failures. The summary shall include those tests performed during that past 6 month interval. if the summary of the test results indicates nonconformance with specification require- ments, action may be take
7、n to remove the failing product from the QPL. Failure to submit the summary may result in loss of qualification for that product. in addition to the periodic submission of data, the supplier shall immediately notify the procuring activity that inspection data indicates failure of the quali- fied pro
8、duct to meet the requirements of the specification. -9- IARP 1172 TABLE IV. QUALIFICATION INSPECTION Examination or Test Flashpoint of impregnant or potting compound Group i Visual 11-16 16-22 22-32 32-41 41-55 55- 73 73- 10 1 101-135 135-181 181-21 1 Wire Size (AWG) 24 22 20 18 16 14 12 10 8 6 4 2
9、1 Fi 1 ter + Figure 2. Method B Mounting Configuration OIRP 1172 4.6.2.5 insulation Resistance (terminal-to-ground): Filters shall be tested in accordance with method 302 of MIL-STD 202, The following details shall apply: - 14 - A. Test condition letter A. % Rated B. Measurements shall be carefully
10、made to prevent damage to the filter seal, When filters fail this test due to ambient relative humidity in excess of SO%, they may be retested at any relative humidity from 20 to 50 percent. 1 Load A C. Points of measurement shall be between case (ground) and all live (not grounded) terminals of the
11、 same circuit con- nected together. 4.6.2.6 Voltage Drop: following requirements: Voltage drop, AC and/or DC as applicable, shall be measured in accordance with the AC Filters - Voltage drop is the difference between the input voltage to the filter and the output voltage of the filter when the filte
12、r is carrying rated current and rated voltage, with a resistive load, at nominal rated frequency. The method of voltage measurement is shown in Figure 3. Measure- ments shall be made by using expanded scale meters which will enable voltage differences of less than 1 volt to be read. DC Filters - The
13、 voltage drop shall be determined in accordance with Figure 4. Measurements shall be made by using a dc reading meter. V, - V2 = voltage drop Figure 3, Measurement of ACVoltage Drop -1 I I t Fi 1 ter -* - Sect ion Var I ab 1 e 6 AC Supply Figure 4. Measurement of DC Voltage Drop .- _ I ARP 1172 4.6.
14、2. i Insertion-Loss: Filters shall be tested under rated load in accordance with MIL-STD-220, except that aclapters may be modified to fit the particular style of the filter. Measureinents shall be taken at a sufficient number of frequencies to plot a curve of insertion-loss versus frequency, accura
15、te to within i - 3 decibels (dB) over the specified frequency range. 4. U. 2.8 Ckerload: Filters shall be suspended by their conductors in free air at an ambient temperature of 20 C inininiuiii. A current equal to 140%, of rated current at nominal rated frequency shall then be ap- plied for 15 niinu
16、tes. After the filter has returned to room temperature. the insulation resistance and voltage drop shall be measured as specified in 4.6.2.5 and 4.6.2.6 respectively. Filters will be visually examined for evidence of physical damage. Iii the event that suspensioii by their conductors is impractical
17、due to size, weight, configuration, or terniinal arraigeineiit! the mounting procedure of 4.6.2.3 (B) may be employed. 4.6. 3 Eiiviraimientnl: 4.6. U. 1 Baroiiietric Pressure (reduced): BIIL-STD-208. The following details shall apply: Filters shall be tested in accordance with method 105 of A. Filte
18、rs shall be securely fastened by normal mounting means. B. Test condition letter B shall be used. - C. Testing foi dielectric withstanding voltage shall be accomplished while subjected to reduced pressure, except that the test voltage shall be 12576 of the rated voltage. D. Filters shall be examined
19、 for evidence of flashover, breakdovm? or impairment which would cause failure. This test shall be accomplished after subjection to .re- duced pressure. 4. U. 3.2 Salt Spray: details ancl exception shall apply: Filters shall be tested in accordance with inethod 101 of MIL-STD-202. The following A. U
20、nless otherwise noted by the control specification, test condition B shall be used. E. After test the filters shall be visually examined for cor- rosion and obliteratioii of marking. 4. i:. 3.3 Teiiiperature mcl linniersion Cycling: cedures: Filters shall be tested in accordance with the folloying p
21、ro- A. Temperature cycling - Filters shall be tested in accordance with method 102, test condition D, of RIIL-STD-202. No measure- iileiits sliall be made after temperature cycling. 13. Immersion cycling - Following temperature cycling, filters shall be tested in accordance with method 104, test con
22、dition A, of MIL-STD-202. After the final cycle dielectric withstanding volt- age with 907; of the voltage specified in 4.6.2.4, shall be applied for 5 5 1 second, insulation resistance and insertion loss (check test) tests perforiiiecl as spccifiwi iii I. 6.2.5 and 4.6.2.7. Filters shall be visuall
23、y exnmirkd for corrosion and obliteration of inaiking. SAE ARP*1172 72 M 8357340 0025106 4 M ARP 1172 I - 16 - 4.6.3.4 Shock - Medium Impact: Filters shall be tested in accordance with method 205, test conditions A and C, of MIL-STD-202. The following details shall apply: A. Filters shall be securel
24、y fastened by normal mounting means. When applicable, leads and connecting wires must be supported to prevent damage to the filter. B. During the test a potential 100% of rated voltage shall be applied between terminals and case. C. After compIetion of the test the units shall be subjected to an ins
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEARP11721972FILTERSCONVENTIONALELECTROMAGNETICINTERFERENCEREDUCTIONGENERALSPECIFICATIONFOR 降低 电磁 干扰

链接地址:http://www.mydoc123.com/p-1022712.html