REG UFGS-21 13 26 00 40-2013 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS.pdf
《REG UFGS-21 13 26 00 40-2013 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS.pdf》由会员分享,可在线阅读,更多相关《REG UFGS-21 13 26 00 40-2013 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCEC / NASA UFGS-21 13 26.00 40 (August 2013)-Preparing Activity: NASA SupersedingUFGS-21 13 26.00 40 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2013*SECTION TABLE OF CONTENTSDIVISION 21 - FIRE SUPPRESSIONSECTION 21 13 26.0
2、0 40DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS08/13PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.4 PROJECT/SITE CONDITIONS1.5 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTSPART 2 PRODUCTS2.1 SYSTEM DESCRIPTION2.1.1 Design Requirements2.1.1.1 Density of Application of Wat
3、er2.1.1.2 Sprinkler Design2.2 MATERIALS2.3 EQUIPMENT2.3.1 Sprinkler Heads2.3.2 Cabinet2.3.3 Valves2.3.4 Water Supply2.3.5 Detection Systems2.3.5.1 Spot Heat Detection Units2.3.5.2 Smoke Detection Units2.3.5.3 Control Panel2.3.5.4 Secondary Power Supply2.3.5.5 Wiring2.3.5.6 Conductor Identification2.
4、3.5.7 Supervision2.3.6 Alarms2.3.6.1 Water Motor Alarm2.3.6.2 Local Alarm2.3.6.3 Fire Alarm2.3.6.4 Trouble Alarm2.3.7 Aboveground Piping Systems2.3.7.1 Water Pipe2.3.7.2 Sprinkler Pipe and FittingsSECTION 21 13 26.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted witho
5、ut license from IHS-,-,-2.3.7.3 Double Basket Strainers2.3.7.4 Pipe Hangers and Supports2.3.7.5 Valves2.3.7.6 Identification Signs2.3.7.7 Inspectors Test Connection2.3.7.8 Main Drains2.3.7.9 Pipe Sleeves2.3.7.10 Escutcheons2.3.7.11 Fire Department Inlet Connections2.3.7.12 Joints2.3.8 Buried Piping
6、Systems2.3.8.1 Pipe and Fittings2.3.8.2 Valves2.3.8.3 Post Indicator Valve Assembly (PIV)2.3.8.4 Valve Boxes2.3.9 Valve Signs2.3.10 Modifications To Existing Post Indicator ValvesPART 3 EXECUTION3.1 INSTALLATION3.1.1 Connections To Existing Water Supply Systems3.1.2 Disinfection3.1.3 Painting3.1.4 E
7、lectrical Work3.2 FIELD QUALITY CONTROL3.2.1 Preliminary Tests3.2.2 Formal Inspection and Tests3.2.3 Disposition of Test Water3.2.4 Test Point3.2.5 Leakage3.2.6 Piping Test3.2.7 Test Blanks3.3 ADJUSTING AND CLEANING3.3.1 Flushing of Underground Connections3.4 CLOSEOUT ACTIVITIES3.4.1 Operation And M
8、aintenance- End of Section Table of Contents -SECTION 21 13 26.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCEC / NASA UFGS-21 13 26.00 40 (August 2013)-Preparing Activity: NASA SupersedingUFGS-21 13 26.00 40 (Augus
9、t 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2013*SECTION 21 13 26.00 40DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS08/13*NOTE: This guide specification covers the requirements for the preparation of installation drawings and performance calculations, a
10、nd the fabrication and installation of an automatic, heat-activated, open-head deluge type sprinkler system.Materials and installation should be in strict accordance with NFPA requirements.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide s
11、pecification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in r
12、espective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: If Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM
13、S is not included in the project specification, applicable requirements therefrom should be inserted and the following paragraph deleted.*Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS applies to work specified in this Section.SECTION 21 13 26.00 40 Page 3Provided by IHS
14、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by
15、 organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.R
16、eferences not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to
17、 within the text by the basic designation only.AMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply ServiceAWWA C651 (2005; Errata 2005) Standard for Disinfecting Water MainsASME INTERNATIONAL (ASME)ASME B16.1 (2010) Gray Iron Pipe Flanges and Flanged Fit
18、tings Classes 25, 125, and 250ASME B36.10M (2004; R 2010) Standard for Welded and Seamless Wrought Steel PipeASTM INTERNATIONAL (ASTM)ASTM A135/A135M (2009) Standard Specification for Electric-Resistance-Welded Steel PipeASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipp
19、ed, Zinc-Coated, Welded and SeamlessNATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance GuideSECTION 21 13 26.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N
20、ATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 13 (2013) Standard for the Installation of Sprinkler SystemsNFPA 24 (2013) Standard for the Installation of Private Fire Service
21、Mains and Their AppurtenancesNFPA 409 (2011; Errata 11-1) Standard on Aircraft HangarsNFPA 70 (2011; Errata 2 2012) National Electrical CodeU.S. DEPARTMENT OF DEFENSE (DOD)MIL-STD-101 (1970; Rev B) Color Code for Pipelines Notice 1) Colors Used in Government ProcurementUNDERWRITERS LABORATORIES (UL)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS21132600402013DELUGEFIRESUPPRESSIONSPRINKLERSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-1019639.html