1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 33 00 (May 2011)-Preparing Activity: NASA SupersedingUFGS-01 33 00 (February 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 33 00SUBMITTAL PROCEDURES05/11PART 1 GENERAL1.1 SUMMARY1.2 DEFINITIO
2、NS1.2.1 Submittal Descriptions (SD)1.2.2 Approving Authority1.2.3 Work1.3 SUBMITTALS1.4 SUBMITTAL CLASSIFICATION1.4.1 Designer of Record Approved (DA)1.4.2 Government Approved G1.4.3 Government Conformance Review of Design (CR)1.4.4 Designer of Record Approved/Government Conformance Review (DA/CR)1.
3、4.4.1 Deviations to the Accepted Design1.4.4.2 Substitutions1.4.5 Designer of Record Approved/Government Approved (DA/GA)1.4.6 Information Only1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL1.5.1 Submittals Required from the Contractor1.5.1.1 O descriptive literature including (but not limit
4、ed to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O certifications; warranties; and other such required submittals.Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered there
5、by. Pick up and dispose of samples not incorporated into the work in accordance with manufacturers Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.1.2 DEFINITIONS1.2.1 Submittal Descriptions (SD)Submittals requirements are specified in the technical sections.
6、Submittals are identified by Submittal Description (SD) numbers and titles as follows:*NOTE: The SD numbers and names, assigned by the SPECSINTACT Configuration, Control and Coordinating Board, relate to the terminology of the technical sections and should not be changed. Refer to UFC 1-300-02 UNIFI
7、ED FACILITIES GUIDE SPECIFICATIONS (UFGS) FORMAT STANDARD for additional information.*SD-01 Preconstruction SubmittalsSubmittals which are required prior to start of construction (work) issuance of contract notice to proceed.or commencing work on site.or the start of the next major phase of the cons
8、truction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.Certificates of insuranceSurety bondsList of proposed Subcontracto
9、rsList of proposed productsConstruction Progress ScheduleSECTION 01 33 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Network Analysis Schedule (NAS)Submittal registerSchedule of pricesHealth and safety planWork planQuality Control(QC) plan
10、Environmental protection planSD-02 Shop DrawingsDrawings, diagrams and schedules specifically prepared to illustrate some portion of the work.Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or syst
11、em into the project.Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.SD-03 Product DataCatalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and oth
12、er characteristics of materials, systems or equipment for some portion of the work.Samples of warranty language when the contract requires extended product warranties.SD-04 SamplesFabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesth
13、etic characteristics of a material or product and establish standards by which the work can be judged.Color samples from the manufacturers standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.Field samples and mock-ups constructed on the pr
14、oject site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.SD-05 Design DataDesign calculations, mix designs, analyses or other data per
15、taining to a part of work.Design submittals, design substantiation submittals and extensions of SECTION 01 33 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-design submittals.SD-06 Test ReportsReport signed by authorized official of testing
16、 laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)Report which includes findings of a test required to
17、 be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.Investigation reports.
18、Daily logs and checklists.Final acceptance test and operational test procedure.SD-07 CertificatesStatements printed on the manufacturers letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requir
19、ements. Must be dated after award of project contract and clearly name the project.Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting
20、 procedures, acceptability of methods or personnel qualifications.Confined space entry permits.Text of posted operating instructions.SD-08 Manufacturers InstructionsPreprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances
21、, hazards and safety precautions.SD-09 Manufacturers Field ReportsDocumentation of the testing and verification actions taken by manufacturers representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installati
22、on, to confirm compliance with manufacturers standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.SECTION 01 33 00 P
23、age 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Factory test reports.SD-10 Operation and Maintenance DataData that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufact
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS0133002011SUBMITALPROCEDURESPDF