REG NASA-LLIS-2040-2008 Lessons Learned NASA HQ 2H32 Exposure Lost-time Case (Type C Mishap).pdf
《REG NASA-LLIS-2040-2008 Lessons Learned NASA HQ 2H32 Exposure Lost-time Case (Type C Mishap).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-2040-2008 Lessons Learned NASA HQ 2H32 Exposure Lost-time Case (Type C Mishap).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 2040Lesson Info:a71 Lesson Number: 2040a71 Lesson Date: 2008-11-18a71 Submitting Organization: HQa71 Submitted by: Angela Stowesa71 POC Name: Cherie Zieschanga71 POC Email: cherie.zieschang-1nasa.gova71 POC Phone: 202-358-1569Subject: NASA HQ 2H32 Exposure/Lost-time Case (Type
2、 C Mishap) Abstract: This mishap involved three office workers in a high-rise office building who lost time from work between January 26 and March 27, 2007. The subsequent investigation identified causes including problems with the performance and operation of the buildings HVAC system, operation of
3、 the garage exhaust ventilation system, the lack of maintenance personnel training on the HVAC and energy management systems, the lack of written mishap preparedness and contingency plans, and employees lack of knowledge and understanding of the process to follow when reporting health and safety haz
4、ard and concerns. Lessons learned from this mishap are provided to prevent recurrences of similar events.Description of Driving Event: Illness of employees resulting from an undetected orderLesson(s) Learned: 1. Building Management must use a process to verify, document, and monitor the energy manag
5、ement system/building automation system for correct settings and proper operation, especially after system upgrades or updates. 2. Building engineers must be properly trained and have working knowledge and experience handling problems with the buildings HVAC system. 3. Building Management must assur
6、e that the building receives the appropriate amount of outdoor Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(fresh) air, per ASHRAE standard 62.1, Ventilation for Acceptable Indoor Air Quality. 4. Space modifications plans and drawings should be r
7、eviewed and concurred by facility managers in consultation with Building Management, and the safety and occupational health personnel. 5. Before moving employees into reconfigured space, facilities managers must inspect and verify that the space is configured per design, and receiving the proper ven
8、tilation per ASHRAE standards 62.1, Ventilation for Acceptable Indoor Air Quality. 6. The garage ventilation system should be operated based on carbon monoxide levels detected instead of specific time periods during the day. 7. Custodial closets need to be secured and housekeeping chemicals properly
9、 handled. 8. Building occupants need periodic reminders and/or training on how to report safety and health hazards, including environmental health emergencies. 9. Headquarters needs to develop and implement a written mishap preparedness and contingency plan. Recommendation(s): Intermediate cause 1 f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS20402008LESSONSLEARNEDNASAHQ2H32EXPOSURELOSTTIMECASETYPECMISHAPPDF

链接地址:http://www.mydoc123.com/p-1019344.html