REG NASA-LLIS-0564-1997 Lessons Learned.pdf
《REG NASA-LLIS-0564-1997 Lessons Learned.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0564-1997 Lessons Learned.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0564Lesson Info:a71 Lesson Number: 0564a71 Lesson Date: 1997-09-10a71 Submitting Organization: SSCa71 Submitted by: Dale LarsonDescription of Driving Event: An electrical mishap occurred on January 30, 1997, at the Water Deluge Pumping Substation 202 at the Cryogenic Transfer
2、Area at the Stennis Space Center (SSC). Electrical Technicians were working under a Troubleshooting Incident Report (TIR) and standard operating procedures as required. The troubleshooting was necessary to determine why the “Run“ indicating lights for Deluge Pumps No. 2 and No. 3 (of four) were reve
3、rsed from actual pump operation.While attempting to also check Pump No. 4, the mishap occurred when the technician jumpered terminals at a field wiring terminal block in the rear of the north switchgear section, believing they were the “Pump No. 4 Run“ contact. An electric arc caused second degree b
4、urns on the hands and third degree burns to the left index finger of the technician. The arc occurred because the two terminals were a 480 VAC tap from the switchgear incoming bus. When the terminals were shorted with the jumper, fault current flowed, and the electric arc formed as the circuit was i
5、nterrupted.Lesson(s) Learned: 1. The electrical technician believed he was jumpering a status contact in a 28 VDC control circuit. He didnt check every terminal for hazardous voltage before jumpering the contact.2. Personal Protective Equipment (PPE) gloves suitable for 480 VAC were not worn.3. Wiri
6、ng revisions had been made that were not documented, either on site drawings or on readily available red-lined working prints.4. Hazardous voltage (480 VAC) was mixed on the terminal block with low voltage (28 VDC) control signals.Recommendation(s): 1. Provide troubleshooting refresher training to:
7、verify the electrical potentials involved in any Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-troubleshooting operation before intentional or accidental contact; recognize patterns and consistency; identify when “live“ troubleshooting is appropria
8、te, and how to perform “live“ troubleshooting safely; review PPE training; and review Lockout and Tagout requirements. Properly rated test equipment must be used.2. Issue a Shop Bulletin on Safe Troubleshooting Practices, including a warning that all configurations should be verified before working
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS05641997LESSONSLEARNEDPDF