NAVY UFGS-13 34 19-2011 METAL BUILDING SYSTEMS《金属建筑系统》.pdf
《NAVY UFGS-13 34 19-2011 METAL BUILDING SYSTEMS《金属建筑系统》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-13 34 19-2011 METAL BUILDING SYSTEMS《金属建筑系统》.pdf(45页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-13 34 19 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-13 34 19 (May 2011)UFGS-13 34 19 (Apr06-Jan08)UFGS-13 34 20 (April 2006)UFGS-13 34 00.00 40 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October
2、2011*SECTION TABLE OF CONTENTSDIVISION 13 - SPECIAL CONSTRUCTIONSECTION 13 34 19METAL BUILDING SYSTEMS11/11PART 1 GENERAL1.1 REFERENCES1.2 GENERAL REQUIREMENTS1.2.1 Structural Performance1.2.1.1 Engineering1.2.1.2 Design Loads1.2.1.3 Live Loads1.2.1.4 Roof Snow Loads1.2.1.5 Wind Loads1.2.1.6 Collate
3、ral Loads1.2.1.7 Auxiliary Loads1.2.1.8 Load Combinations1.2.1.9 Deflection Limits1.2.2 Seismic Performance1.2.3 Thermal Movements1.2.4 Thermal Performance1.2.4.1 Metal Roof Panel Assemblies1.2.4.2 Metal Wall Panel Assemblies1.2.5 Air Infiltration for Metal Roof Panels1.2.6 Air Infiltration for Meta
4、l Wall Panels1.2.7 Water Penetration for Metal Roof Panels1.2.8 Water Penetration for Metal Wall Panels1.2.9 Wind-Uplift Resistance1.3 DEFINITIONS1.4 SYSTEM DESCRIPTION1.4.1 Primary Frame Type1.4.2 Fixed End-Wall Framing1.4.3 Expandable End-Wall Framing1.4.4 Secondary Frame Type1.4.5 Eave Height1.4.
5、6 Bay Spacing1.4.7 Roof SlopeSECTION 13 34 19 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.4.8 Roof System1.4.9 Exterior Wall System1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Pre-Erection Conference1.6.1.1 Pre-Roofing and Siding Installation
6、 Conference1.6.2 Manufacturers Technical Representative1.6.3 Manufacturers Qualifications1.6.4 Qualification of Erection Contractor1.6.5 Single Source1.6.6 Welding1.6.7 Structural Steel1.6.8 Cold-Formed Steel1.6.9 Fire-Resistance Ratings1.6.10 Surface-Burning Characteristics1.6.11 Fabrication1.6.12
7、Finishes1.7 SHIPPING, HANDLING AND STORAGE1.7.1 Delivery1.8 PROJECT CONDITIONS1.8.1 Weather Limitations1.8.2 Field Measurements1.8.2.1 Established Dimensions for Foundations1.8.2.2 Established Dimensions for Metal Panels1.8.2.3 Verification Record1.9 COORDINATION1.10 WARRANTY1.10.1 Building System W
8、arranty1.10.2 Roof System Weather-Tightness Warranty1.10.3 Roof and Wall Panel Finish WarrantyPART 2 PRODUCTS2.1 STRUCTURAL FRAMING MATERIALS2.1.1 W-Shapes2.1.2 Channel, Angles, M-Shapes and S-Shapes2.1.3 Plate and Bar2.1.4 Steel Pipe2.1.5 Cold-Formed and Hot Formed Hollow Structural Sections2.1.6 S
9、tructural-Steel Sheet2.1.7 Metallic-Coated Steel Sheet2.1.8 Metallic-Coated Steel Sheet Pre-painted with Coil Stock Coating2.1.9 Joist Girders2.1.10 Steel Joists2.1.11 High-Strength Bolts, Nuts, and Washers2.1.12 Non-High-Strength Bolts, Nuts, and Washers2.1.13 Anchor Rods2.1.14 Threaded Rods2.1.15
10、Primer2.2 FABRICATION2.2.1 General2.3 STRUCTURAL FRAMING2.3.1 General2.3.2 Primary Framing2.3.3 Secondary Framing2.3.4 Bracing2.4 PANEL MATERIALS2.4.1 Aluminum Sheet2.4.2 Steel SheetSECTION 13 34 19 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
11、-,-2.4.3 Foam-Insulation Core Wall Panel2.4.4 Insulated Panel Construction2.4.5 Finish2.4.6 Repair Of Finish Protection2.5 MISCELLANEOUS METAL FRAMING2.5.1 General2.5.2 Fasteners for Miscellaneous Metal Framing2.6 FASTENERS2.6.1 General2.6.2 Exposed Fasteners2.6.3 Screws2.6.4 Rivets2.6.5 Attachment
12、Clips2.7 FRAMES AND MATERIALS FOR OPENINGS2.7.1 Doors2.7.2 Windows2.8 ACCESSORIES2.8.1 General2.8.2 Roof and Wall Accessories and Specialties2.8.3 Insulation2.8.3.1 Polyethylene Vapor Retarder2.8.3.2 Wall Liner2.8.4 Rubber Closure Strips2.8.5 Metal Closure Strips2.8.6 2.6.6 Joint Sealants2.8.6.1 Sea
13、lants2.8.6.2 Shop-Applied2.8.6.3 Field-Applied2.8.6.4 Tape Sealant2.9 SHEET METAL FLASHING AND TRIM2.9.1 Fabrication2.10 FINISHES2.10.1 General2.10.2 Appearance of Finished WorkPART 3 EXECUTION3.1 EXAMINATION3.2 PREPARATION3.3 ERECTION OF STRUCTURAL FRAMING3.4 METAL WALL PANEL INSTALLATION3.5 ROOF P
14、ANEL INSTALLATION3.6 METAL PANEL FASTENER INSTALLATION3.7 FLASHING, TRIM AND CLOSURE INSTALLATION3.8 DOOR AND FRAME INSTALLATION3.9 WINDOW INSTALLATION3.10 ACCESSORY INSTALLATION3.10.1 General3.10.2 Dissimilar Metals3.10.3 Gutters and Downspouts3.10.4 Insulation3.10.5 Roof and Wall Accessories and S
15、pecialties3.11 CLEAN-UP AND PROTECTION3.11.1 Structural Framing3.11.2 Metal Panels3.11.3 Touch-Up Painting3.12 WASTE MANAGEMENT3.13 SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS3.14 WARRANTYSECTION 13 34 19 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted wit
16、hout license from IHS-,-,-3.14.1 MANUFACTURERS WARRANTY3.14.2 CONTRACTORS WARRANTY for INSTALLATION3.14.3 CONTRACTORS FIVE (5) YEAR NO PENAL SUM WARRANTY- End of Section Table of Contents -SECTION 13 34 19 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
17、m IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-13 34 19 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-13 34 19 (May 2011)UFGS-13 34 19 (Apr06-Jan08)UFGS-13 34 20 (April 2006)UFGS-13 34 00.00 40 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL date
18、d October 2011*SECTION 13 34 19METAL BUILDING SYSTEMS11/11*NOTE: This guide specification covers the requirements for fabricated, pre-engineered metal structures.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing n
19、ew project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether
20、or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specificati
21、on. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title. All references, inculding dates, should be verified that they comply with the requirements of UFC 1-200-01.Use the Reference Wizards Check Reference
22、feature when you add a RID outside of the Sections SECTION 13 34 19 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference
23、feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent reference
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS1334192011METALBUILDINGSYSTEMS 金属 建筑 系统 PDF

链接地址:http://www.mydoc123.com/p-984781.html