1、 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2017 by Navistar, Inc. APRIL 2017 Page 1 of 10 NAVISTAR, INC. Material, Parts, and Process Specification
2、s (MPAPS) NUMBER: MPAPS P-39 Former Designation: CEMS A-39 or 5% of the “A” intensity arc height for parts RC 45 and greater. Convert “N” or “C” intensities to equivalent “A” value. 4.6.3 Unless otherwise specified, heating after shot peening such as to bake or cure paint will be limited to: 230C (4
3、50F) max for steel; 135C (275F) max for aluminum. 4.6.4 Treated surfaces will be suitably cleaned and protected with a rust inhibiting coating before shipping or storage. 4.7 Method of Test 4.7.1 Test Strip Intensity Support the appropriate tests strips so that their exposure simulates that of each
4、specified area. Follow the procedure outlined in SAE J443 to generate an “Intensity Determination Curve.” Saturation of the test strip is defined as the “Shortest time” point on the curve from which doubling that time will result in no more than a 10% increase in arc height. Full or 100% coverage of
5、 the test strip or complete denting of the surface will correspond very closely to saturation. Use a fresh test strip for each exposure; no strip may be reused. 4.7.2 Piece Part Intensity All variables, except time, determined above must be maintained. The time to get saturation or 100% coverage of
6、the piece part will vary with the base hardness. This time will be determined visually. A 150% of 1.5 coverage specification refers to 1-1/2 times the piece part saturation time. 4.7.3 Coverage Piece part coverage will be determined visually using a 10 power magnifying glass. Full or 100% coverage w
7、ill be uniform with complete denting or obliteration of the original surface. NUMBER: MPAPS P-39 TITLE: Shot Peening of Metal Parts REVISION: 1704 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are
8、 required to assume all patent liability. 2017 by Navistar, Inc. APRIL 2017 Page 4 of 10 5.0 QUALITY All product supplied shall be clean and free from dirt, oils, or defects harmful to product performance. The supplier should be capable of providing statistical evidence that parts have been processe
9、d with process control limits established by the supplier for this product and that the process is capable of meeting all requirements of this specification. 6.0 QUALIFICATION Engineering qualification of sources is required in advance of production shipments. Samples shall be accompanied by test da
10、ta certifying that all requirements of the specification have been met. 6.1 Quality Control Plan A Quality Control Plan for products supplied to the requirements of this specification will be established by mutual agreement between NAVISTAR and the supplier. Unless specific exception is noted, the f
11、ollowing characteristics, where applicable*, shall be included in the plan as features for management by statistical process control.* * Other characteristics for inclusion in the control plan may be specified on the engineering drawing and/or purchase order. * See NAVISTAR Engineering Design Standa
12、rd A-16 7.0 SOURCE APPROVAL AND QUALITY CONTROL 7.1 Supplier Requirements All suppliers to NAVISTAR are required to be registered to ISO 9001 Quality System Requirements. NAVISTAR will also accept TS-16949 registration as long as the supplier can also fulfill all AIAG PPAP (Production Part Approval
13、Process) documentation and approval requirements. Suppliers must maintain their certification with an accredited registrar and must furnish copies of registration certificates to their Corporate Buyer upon request. 7.2 Approval Parts supplied against contracts or purchase orders citing this specific
14、ation shall be equivalent in all respects to those samples which were approved by the purchaser. No changes in formulation or processing practices are permitted without approval. In the event that changes in material, properties, processing practices, construction, color, or labeling of the product
15、are required, the supplier shall notify NAVISTAR Materials Engineering and Purchasing and Supplier Development of the proposed change(s). Test data indicating conformance to all requirements of this specification, test samples, and new or amended or updated Material Safety Data Sheet(s) (MSDS), in a
16、ccordance with CFR Title 29, Part 1910 shall be submitted with the request for change. 7.3 Process Control The supplier shall either, perform and report results of tests on specific lots of parts produced using ISO 9001 or TS-16949 guidelines, or provide statistical evidence of the lot having been p
17、roduced in a state of statistical control and with a process capable of providing all required properties. The part supplier NUMBER: MPAPS P-39 TITLE: Shot Peening of Metal Parts REVISION: 1704 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission fr
18、om Corporate Technical Standards. Suppliers are required to assume all patent liability. 2017 by Navistar, Inc. APRIL 2017 Page 5 of 10 and the quality control manager of the using NAVISTAR plant may determine testing and reporting requirements on specific products. 8.0 SHIPPING AND HANDLING Shippin
19、g and identification shall be in accordance with NAVISTAR Supplier Packing and Shipping Standard D-13. Parts shall be packaged so as to avoid any damage in shipment detrimental to the appearance of the part. 9.0 DESIGNATION ON DRAWINGS The class, suffixes and other required information will be speci
20、fied as follows: Shot Peen, Class 8CH, Coverage 150% min, MPAPS P-39 Shot Peen, Class 12A, MPAPS P-39 Shot Peen, Class IND, 12-20 AH, MPAPS P-39 Shot Peen, Class IND, 10C, min, MPAPS P-39 10.0 TECHNICAL INFORMATION For further information related to the technical content of this specification, conta
21、ct: Suppliers may purchase controlled copies of this specification by contacting: Materials Engineering and Technology Dept. 10400 W. North Avenue Melrose Park, IL 60160 E-mail: MaterialsEngineeringN IHS Markit Inc. 15 Inverness Way East Englewood CO 80112-5776 Phone: 1-800-854-7179 E-mail: Automoti
22、veIHS.com Website: http:/ NUMBER: MPAPS P-39 TITLE: Shot Peening of Metal Parts REVISION: 1704 This document is restricted and may not be sent outside Navistar, Inc. or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2017 by Na
23、vistar, Inc. APRIL 2017 Page 6 of 10 A.0 GENERAL INFORMATION Not a Requirement A.1 INTRODUCTION Shot peening is the process of exposing a metal surface to bombardment by a high velocity stream of solid particles. This treatment creates a compressively stressed layer on that surface which will reduce
24、 the effect of a tensile stress from an applied load and thereby increase the load carrying capacity in fatigue. Fatigue strength, for high cycle applications, can be improved significantly. Depending on the application, this can vary from 20% to well over 100%. The percent improvement decreases as
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVISTARMPAPSP392017SHOTPEENINGOFMETALPARTSPDF

链接地址:http://www.mydoc123.com/p-963075.html