CSA N287 7-2008 In-service examination and testing requirements for concrete containment structures for CANDU nuclear power plants (Fourth Edition Update No 1 September 2010).pdf
《CSA N287 7-2008 In-service examination and testing requirements for concrete containment structures for CANDU nuclear power plants (Fourth Edition Update No 1 September 2010).pdf》由会员分享,可在线阅读,更多相关《CSA N287 7-2008 In-service examination and testing requirements for concrete containment structures for CANDU nuclear power plants (Fourth Edition Update No 1 September 2010).pdf(53页珍藏版)》请在麦多课文档分享上搜索。
1、N287.7-08In-service examination and testing requirements for concrete containment structures for CANDU nuclear power plantsLegal Notice for StandardsCanadian Standards Association (CSA) standards are developed through a consensus standards development process approved by the Standards Council of Can
2、ada. This process brings together volunteers representing varied viewpoints and interests to achieve consensus and develop a standard. Although CSA administers the process and establishes rules to promote fairness in achieving consensus, it does not independently test, evaluate, or verify the conten
3、t of standards.Disclaimer and exclusion of liabilityThis document is provided without any representations, warranties, or conditions of any kind, express or implied, including, without limitation, implied warranties or conditions concerning this documents fitness for a particular purpose or use, its
4、 merchantability, or its non-infringement of any third partys intellectual property rights. CSA does not warrant the accuracy, completeness, or currency of any of the information published in this document. CSA makes no representations or warranties regarding this documents compliance with any appli
5、cable statute, rule, or regulation. IN NO EVENT SHALL CSA, ITS VOLUNTEERS, MEMBERS, SUBSIDIARIES, OR AFFILIATED COMPANIES, OR THEIR EMPLOYEES, DIRECTORS, OR OFFICERS, BE LIABLE FOR ANY DIRECT, INDIRECT, OR INCIDENTAL DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES, HOWSOEVER CAUSED, INCLUDING BUT NOT LIMI
6、TED TO SPECIAL OR CONSEQUENTIAL DAMAGES, LOST REVENUE, BUSINESS INTERRUPTION, LOST OR DAMAGED DATA, OR ANY OTHER COMMERCIAL OR ECONOMIC LOSS, WHETHER BASED IN CONTRACT, TORT (INCLUDING NEGLIGENCE), OR ANY OTHER THEORY OF LIABILITY, ARISING OUT OF OR RESULTING FROM ACCESS TO OR POSSESSION OR USE OF T
7、HIS DOCUMENT, EVEN IF CSA HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES.In publishing and making this document available, CSA is not undertaking to render professional or other services for or on behalf of any person or entity or to perform any duty owed by an
8、y person or entity to another person or entity. The information in this document is directed to those who have the appropriate degree of experience to use and apply its contents, and CSA accepts no responsibility whatsoever arising in any way from any and all use of or reliance on the information co
9、ntained in this document. CSA is a private not-for-profit company that publishes voluntary standards and related documents. CSA has no power, nor does it undertake, to enforce compliance with the contents of the standards or other documents it publishes. Intellectual property rights and ownershipAs
10、between CSA and the users of this document (whether it be in printed or electronic form), CSA is the owner, or the authorized licensee, of all works contained herein that are protected by copyright, all trade-marks (except as otherwise noted to the contrary), and all inventions and trade secrets tha
11、t may be contained in this document, whether or not such inventions and trade secrets are protected by patents and applications for patents. Without limitation, the unauthorized use, modification, copying, or disclosure of this document may violate laws that protect CSAs and/or others intellectual p
12、roperty and may give rise to a right in CSA and/or others to seek legal redress for such use, modification, copying, or disclosure. To the extent permitted by licence or by law, CSA reserves all intellectual property rights in this document.Patent rightsAttention is drawn to the possibility that som
13、e of the elements of this standard may be the subject of patent rights. CSA shall not be held responsible for identifying any or all such patent rights. Users of this standard are expressly advised that determination of the validity of any such patent rights is entirely their own responsibility.Auth
14、orized use of this documentThis document is being provided by CSA for informational and non-commercial use only. The user of this document is authorized to do only the following:If this document is in electronic form:.load this document onto a computer for the sole purpose of reviewing it;.search an
15、d browse this document; and.print this document if it is in PDF format. Limited copies of this document in print or paper form may be distributed only to persons who are authorized by CSA to have such copies, and only if this Legal Notice appears on each such copy.In addition, users may not and may
16、not permit others to.alter this document in any way or remove this Legal Notice from the attached standard;.sell this document without authorization from CSA; or.make an electronic copy of this document.If you do not agree with any of the terms and conditions contained in this Legal Notice, you may
17、not load or use this document or make any copies of the contents hereof, and if you do make such copies, you are required to destroy them immediately. Use of this document constitutes your acceptance of the terms and conditions of this Legal Notice.Update No. 1N287.7-08September 2010Note: General In
18、structions for CSA Standards are now called Updates. Please contact CSA Information Products Sales or visit www.ShopCSA.ca for information about the CSA Standards Update Service.Title: In-service examination and testing requirements for concrete containment structures for CANDU nuclear power plants
19、originally published May 2008The following revisions have been formally approved and are marked by the symbol delta () in the margin on the attached replacement pages:Revised Table 1New NoneDeleted NoneCSA N287.7-08 originally consisted of 41 pages (viii preliminary and 33 text), each dated May 2008
20、. It now consists of the following pages:May 2008 iiiviii, 18, and 1133September 2010 9 and 10 Update your copy by inserting these revised pages.Keep the pages you remove for reference. Canadian Standards AssociationIn-service examination and testing requirements for concrete containment structures
21、for CANDU nuclear power plantsSeptember 20107.5.3 During pressure tests, an independent means of pressure monitoring shall be available during the pressurization phase of the test to prevent overpressurization.7.6 Leakage-rate test method7.6.1 The leakage-rate test method should be the absolute meth
22、od using the mass plot analysis technique (see Annex C). The termination criteria are such that the 95% confidence interval is a suitably small fraction of the measured leakage rate and the most recent data remain consistent with the data over the entire test period. 7.6.2 Where the test method spec
23、ified in Clause 7.6.1 is not used, an alternative method that meets the intent of this Standard shall be used.7.6.3 The test specified in Clauses 7.6.1 and 7.6.2 shall not be terminated in the event of abnormal trends.7.7 StabilizationFollowing a controlled pressure change, the pressure and temperat
24、ure shall be stabilized for a minimum period of 1 h unless a shorter stabilization period can be established. Stabilization is complete when the following conditions are met:(a) the average containment atmosphere temperature change is less than 0.25 K/h and is sustained over a 1 h period; and(b) the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CSAN28772008INSERVICEEXAMINATIONANDTESTINGREQUIREMENTSFORCONCRETECONTAINMENTSTRUCTURESFORCANDUNUCLEARPOWERPLANTSFOURTHEDITIONUPDATENO1SEPTEMBER2010PDF

链接地址:http://www.mydoc123.com/p-621502.html