ASTM F2379-2004 Standard Test Method for Energy Performance of Powered Open Warewashing Sinks《机动敞口式物品清洗槽能量性能的标准试验方法》.pdf
《ASTM F2379-2004 Standard Test Method for Energy Performance of Powered Open Warewashing Sinks《机动敞口式物品清洗槽能量性能的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2379-2004 Standard Test Method for Energy Performance of Powered Open Warewashing Sinks《机动敞口式物品清洗槽能量性能的标准试验方法》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2379 04An American National StandardStandard Test Method forEnergy Performance of Powered Open Warewashing Sinks1This standard is issued under the fixed designation F 2379; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revis
2、ion, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method evaluates the energy consumption ofpowered open warewashing sinks. The food service
3、 operatorcan use these tests to evaluate and select a suitable washingdevice and understand its energy consumption.1.2 This test method applies to powered open warewashingsinks (powered sinks) with the following characteristics: alarge main water sink with electrically powered water pump(s)and multi
4、ple high flow water nozzles. The unit may include gasor electric heaters to maintain water temperature. These pow-ered sinks are designed to run for predetermined cycle durationand accommodate pots and pans of various shapes and sizes aswell as cooking utensils. They are intended for stand alone use
5、and require little supervision. The powered sink will be testedfor the following (where applicable):1.2.1 Maximum energy input rate (10.2),1.2.2 Preheat energy consumption and duration (10.3),1.2.3 Idle energy rate (10.4),1.2.4 Pilot energy rate, if applicable (10.5), and1.2.5 Washing cycle energy c
6、onsumption (10.6).NOTE 1This test method applies only to the powered portion of theunit. Other compartments (sanitizing, rinsing, and so forth) are notevaluated.1.3 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are forinformation only.1.4 Th
7、is standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documen
8、ts2.1 ASTM Standards:2D 3588 Practice for Calculating Heat Value, Compressibil-ity Factor, and Relative Density of Gaseous Fuels2.2 ANSI Standard:2000 International Fuel Gas Code32.3 ASHRAE Documents:ASHRAE Guideline 2 (RA90) Engineering Analysis ofExperimental Data4ASHRAE 1993 Fundamentals Handbook
9、43. Terminology3.1 Definitions:3.1.1 powered open warewashing sink, or powered sink,nan all-purpose, stainless steel water sink with electricallypowered water pump(s) and multiple high flow water nozzlesdesigned for cleaning pots, pans, and utensils. The mainwashing sink holds 60 to 100 gal of heate
10、d water. The unit mayor may not feature a scrapper sink, rinse tank, sanitizing tank,scrap table, or a drain table, or both.3.1.2 test method, na definitive procedure for the identi-fication, measurement, and evaluation of one or more qualities,characteristics, or properties of a material, product,
11、system, orservice that produces test results.3.1.3 uncertainty, nmeasure of systematic and precisionerrors in specified instrumentation or measure of repeatabilityof a reported test result.3.2 Definitions of Terms Specific to This Standard:3.2.1 energy input rate, npeak rate at which a poweredsink c
12、onsumes energy (Btu/h or kW (kJ/h).3.2.2 idle energy rate, nthe rate of energy consumed(Btu/h or kW (kJ/h) by the powered sink while holding ormaintaining a water-filled wash sink at the 115F (46C)setpoint.3.2.3 pilot energy rate, naverage rate of energy consump-tion (Btu/h) by a powered sinks conti
13、nuous pilot (if appli-cable).3.2.4 preheat energy, namount of energy consumed bythe powered sink while preheating the wash sink water from 701This test method is under the jurisdiction of ASTM Committee F26 on FoodService Equipment and is the direct responsibility of Subcommittee F26.06 onProductivi
14、ty and Energy Protocol.Current edition approved April 1, 2004. Published April 2004.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary p
15、age onthe ASTM website.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036.4Available from American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc. (ASHRAE), 1791 Tullie Circle, NE, Atlanta, GA30329.1Copyright ASTM Intern
16、ational, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.6 5F (21 6 3C) to 115F (46C), with the control(s) set toa calibrated 115F (46C).3.2.5 preheat rate, naverage rate (F/min) at which thepowered sinks water is heated from 70 6 5F (21 6 3C) to115F (46C), with t
17、he control(s) set to a calibrated 115F(46C).3.2.6 preheat time, ntime required for the powered sinkwater to preheat from 70 6 5F (21 6 3C) to 115F (46C),with the control(s) set to a calibrated 115F (46C).3.2.7 washing energy, namount of energy consumed (Btuor kWh (kJ) during the powered sinks washin
18、g cycle.3.2.8 washing energy rate, naverage rate of energy con-sumption (Btu/h or kW (kJ/h) during the powered sinkswashing cycle.4. Summary of Test Method4.1 The powered sink under test is connected to the appro-priate metered energy supply. The measured energy input rateis determined and checked a
19、gainst the rated input beforecontinuing with testing.4.2 The amount of cold (70 6 5F (21 6 3C) waterrequired to fill the main water sink to capacity is measured.4.3 The amount of energy and time required to preheat thepowered sinks wash sink from 70 6 5F (21 6 3C) to 115F(46C) is determined.4.4 The
20、rate of idle energy consumption is determined withthe powered sink set to maintain 115F (46C) and the pumpmotor(s) switched off.4.5 Pilot energy rate is determined, when applicable, for gaspowered sinks.4.6 Washing cycle energy consumption is characterized fortwo different starting water temperature
21、s: 70F (21C) and115F (46C).5. Significance and Use5.1 The energy input rate test is used to confirm that thepowered sink is operating properly prior to further testing.5.2 Preheat energy and time can be useful to food serviceoperators to manage power demands and to know how quicklythe powered sink c
22、an be ready for operation when filled withcold water.NOTE 2It is typically recommended that powered sinks be filled withhot water prior to use. This test is useful for operations that have a limitedsupply of domestic hot water and would need to use cold water to fill thesink to capacity.5.3 Idle ene
23、rgy rate and pilot energy rate can be used toestimate energy consumption during standby periods.5.4 Washing cycle energy consumption can be used by thefood service operator to estimate energy consumption duringoperating periods.6. Apparatus6.1 Barometer, for measuring absolute atmospheric pres-sure,
24、 to be used for adjustment of measured natural gas volumeto standard conditions. Shall have a resolution of 0.2 in. Hg andan uncertainty of 0.2 in. Hg.6.2 Calibrated Exposed Junction Thermocouple Probes,with a range from 50 to 200F (10 to 93C), with a resolutionof 0.2F (0.1C) and an uncertainty of 0
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF23792004STANDARDTESTMETHODFORENERGYPERFORMANCEOFPOWEREDOPENWAREWASHINGSINKS 机动 敞口 物品 清洗 能量 性能 标准

链接地址:http://www.mydoc123.com/p-538548.html