ASTM D7167-2005 Standard Guide for Establishing Procedures to Monitor the Performance of Safety-Related Coating Service Level III Lining Systems in an Operating Nuclear Power Plant.pdf
《ASTM D7167-2005 Standard Guide for Establishing Procedures to Monitor the Performance of Safety-Related Coating Service Level III Lining Systems in an Operating Nuclear Power Plant.pdf》由会员分享,可在线阅读,更多相关《ASTM D7167-2005 Standard Guide for Establishing Procedures to Monitor the Performance of Safety-Related Coating Service Level III Lining Systems in an Operating Nuclear Power Plant.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 7167 05Standard Guide forEstablishing Procedures to Monitor the Performance ofSafety-Related Coating Service Level III Lining Systems inan Operating Nuclear Power Plant1This standard is issued under the fixed designation D 7167; the number immediately following the designation indicat
2、es the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers procedures for establishin
3、g a programto monitor the performance of Coating Service Level III lining(and coating) systems in operating nuclear power plants.Monitoring is an ongoing process of evaluating the conditionof the in-service lining systems.1.2 Coating Service Level III lining systems subject to thisguide are generall
4、y those applied to metal substrates compris-ing raw water or condensate-quality water wetted (that is, fullor intermittent immersion) surfaces2in systems that include:1.2.1 Service water piping upstream of safety-related com-ponents,1.2.2 Service water pump internals (draft tube, volutes, anddiffuse
5、rs),1.2.3 Service water heat exchangers including the channels,pass partitions, tubesheets, end bells, and covers1.2.4 Service water strainers, and1.2.5 Reactor water storage tanks (RWSTs) and refuelcavity water storage tanks.1.3 It is the intent of this guide to provide a recommendedbasis for estab
6、lishing a coatings monitoring program, not tomandate a singular basis for all programs. Variations orsimplifications of the program described in this guide may beappropriate for any given operating nuclear power plantdepending on its licensing commitments. Similar guidelinesmay be applicable for cer
7、tain Coating Service Level II appli-cations such as fluid immersion systems.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determi
8、ne the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:3D 610 Test Method for Evaluating Degree of Rusting onPainted Steel SurfacesD 714 Test Method for Evaluating Degree of Blistering ofPaintsD 1186 Test Methods for Nondestructive Measurement ofDry Fi
9、lm Thickness of Nonmagnetic Coatings Applied toa Ferrous BaseD 1400 Test Method for Nondestructive Measurement ofDry Film Thickness of Nonconductive CoatingsApplied toa Nonferrous Metal BaseD 3359 Test Methods for Measuring Adhesion by Tape TestD 4537 Guide for Establishing Procedures to Qualify and
10、Certify Personnel Performing Coating Work Inspection inNuclear FacilitiesD 4541 Test Method for Pull-Off Strength of CoatingsUsing Portable Adhesion TestersD 6677 Test Method for Measuring Adhesion by KnifeF 1130 Practice for Inspecting the Coating System of a Ship2.2 ANSI Standard:4N 45.2.6 Qualifi
11、cation of Inspection, Examination, andTesting Personnel for Nuclear Power Plants2.3 SSPC Standard:5SSPC-PA2 Measurement of Dry Paint Thickness With Mag-netic GagesSSPC-VIS 2 Standard Method of Evaluating Degree ofRusting on Painted Steel Surfaces2.4 U.S. Nuclear Regulatory Commission Documents:61Thi
12、s guide is under the jurisdiction of ASTM Committee D33 on ProtectiveCoating and Lining Work for Power Generation Facilities and is the directresponsibility of Subcommittee D33.04 on Quality Systems and Inspection.Current edition approved June 1, 2005. Published July 2005.2This category could includ
13、e combustion air intakes and fuel storage vessellinings for emergency diesel generators3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summar
14、y page onthe ASTM website.4Available from American National Standards Institute, 25 W. 43rd St., NewYork, NY 10036.5Available from Society for Protective Coatings (SSPC), 40 24th St., 6th Floor,Pittsburgh, PA 15222-4656.6Available from U.S. Government Printing Office Superintendent of Documents,732
15、N. Capitol St., NW, Mail Stop: SDE, Washington, DC 20401.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.Generic Letter 89-13 Service Water System Problems Af-fecting Safety-Related Equipment3. Terminology3.1 Definitions of Terms Spe
16、cific to This Standard:3.1.1 Coating Service Level III, nareas outside the reactorcontainment where lining (or coating) failure could adverselyaffect the safety function of a safety-related structure, system,or component (SSC).3.1.2 lining, nparticular type of coating intended forprotection of subst
17、rates from corrosion as a result of continu-ous or intermittent fluid immersion.3.1.2.1 DiscussionThe normal operating service environ-ments to which linings are subject are aggressive. As such,material and application process parameters are specialized andrequire exacting quality control measures.
18、Linings are some-times applied to heat exchangers to prevent tubesheet-to-tubesheet leakage.4. Significance and Use4.1 Establishment of an in-service linings monitoring pro-gram permits planning and prioritization of lining maintenancework as needed to maintain lining integrity and performance innuc
19、lear Coating Service Level III lining systems. For addi-tional information on nuclear maintenance coating work, referto Manual on Maintenance Coatings for Nuclear PowerPlants.74.2 A linings monitoring program enables early identifica-tion and detection of potential problems in lining systems.Some Co
20、ating Service Level III lining systems may be knownin advance to be suspect, deficient, or degraded. Monitoringlining performance will assist in developing follow-up proce-dures to resolve any significant deficiency relative to liningwork.4.3 Degraded linings may generate debris under normaloperatio
21、n and testing or during upset conditions that couldadversely affect the performance of the safety-related systems.In most cases, the consequence of the debris generation is flowblockage, essential heat transfer reduction, or both; ultimatelyleading to degradation of equipment or system performance.
22、Alinings monitoring program may be required to fulfill licensingcommitments for Coating Service Level III lining work.5. Responsibility5.1 The owner/operator shall identify the department orgroup within the organization responsible for establishing theapplicable requirements for activities or proced
23、ures covered bythis guide and shall document the scope of their responsibility.Owner/operator delegation of this responsibility to other out-side qualified organizations is permitted and shall be docu-mented.5.2 It is the responsibility of the owner/operator or hisdesignee performing these activitie
24、s to specify the detailedmethods and procedures for meeting the applicable require-ments of this guide.5.3 The owner/operator or his designee shall assign acoordinator to be responsible for supervising lining inspectionactivities, data collection and documentation, and for ensuringthat personnel per
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD71672005STANDARDGUIDEFORESTABLISHINGPROCEDURESTOMONITORTHEPERFORMANCEOFSAFETYRELATEDCOATINGSERVICELEVELIIILININGSYSTEMSINANOPERATINGNUCLEARPOWERPLANTPDF

链接地址:http://www.mydoc123.com/p-524683.html