ARMY UFGS-04 23 00-2009 GLASS MASONRY UNITS《玻璃砌块》.pdf
《ARMY UFGS-04 23 00-2009 GLASS MASONRY UNITS《玻璃砌块》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-04 23 00-2009 GLASS MASONRY UNITS《玻璃砌块》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-04 23 00 (November 2009)-Preparing Activity: USACE SupersedingUFGS-04 23 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 04 - MASONRYSECTION 04 23 00GLASS MASONRY UNI
2、TS11/09PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 DELIVERY, STORAGE, AND HANDLING1.4 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 GLASS BLOCK UNITS2.1.1 Exterior Glass Block Units2.1.2 Interior Glass Block Units2.1.3 Solid Glass Block Units2.1.4 Fire Rated Glass Block Units2.2 MORTAR2.2.1 Mortar
3、Mix2.2.2 Aggregates2.2.3 Waterproofing2.2.4 Admixtures2.2.5 Prepackaged Mortar Mix2.3 ACCESSORIES2.3.1 Horizontal Joint Reinforcement2.3.2 Panel Anchors2.3.2.1 Strip Anchor2.3.2.2 Wire-Type Anchor2.3.3 Expansion Strip2.3.4 PackingPART 3 EXECUTION3.1 INSTALLATION3.1.1 Workmanship3.1.2 Mortar Mixing3.
4、1.3 Mortar Joints3.1.4 Care During Laying3.1.5 ReinforcingSECTION 04 23 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.6 Panel Anchors3.1.7 Expansion Allowance3.1.8 Tooling3.1.9 Packing and Sealing3.2 CLEANING3.2.1 Protection3.2.2 Point
5、ing3.2.3 Cleaning- End of Section Table of Contents -SECTION 04 23 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-04 23 00 (November 2009)-Preparing Activity: USACE SupersedingUFGS-04 23 00 (April 2006)U
6、NIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION 04 23 00GLASS MASONRY UNITS11/09*NOTE: This guide specification covers the requirements for glass block unit masonry work.Edit this guide specification for project specific requirements by adding,
7、deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be dir
8、ected to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The following informa
9、tion will be shown on the project drawings:1. Head, jamb, sill, and intermediate support construction details.2. Clearances required for deflection and expansion.Refer to manufacturers data for glass block unit panel size restrictions, limitations, and details. CAUTION: 1) Single wythe construction
10、is not recommended for areas subject to severe wind-driven rain exposure; 2) avoid removable panel construction; and 3) avoid large expanses of exterior walls subject to high wind pressures, wide SECTION 04 23 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
11、nse from IHS-,-,-thermal variations, and differential movements*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, desi
12、gnation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used
13、in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process. *The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text b
14、y the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM A 153/A 153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel HardwareASTM A 82/A 82M (2007) Standard Specification for Steel Wire, Plain, for Concrete ReinforcementASTM C 144 (2004) Standard Specification for Aggre
15、gate for Masonry MortarASTM C 270 (2008a) Standard Specification for Mortar for Unit MasonryASTM E 119 (2009) Standard Test Methods for Fire Tests of Building Construction and Materials1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edi
16、t the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the SECTION 04 23 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted
17、 without license from IHS-,-,-submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently im
18、portant or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management
19、System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA proje
20、cts.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information on
21、ly. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataGlass BlockWaterproofing AgentHorizontal Joint ReinforcementPanel Anchor
22、sExpansion StripSD-04 SamplesGlass BlockHorizontal Joint ReinforcementPanel AnchorsExpansion StripSD-07 CertificatesGlass BlockCertificates of compliance stating that the materials meet the specified requirements.1.3 DELIVERY, STORAGE, AND HANDLINGDeliver cement, lime, and other cementitious materia
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0423002009GLASSMASONRYUNITS 玻璃 砌块 PDF

链接地址:http://www.mydoc123.com/p-449558.html