1、*USACE / NAVFAC / AFCESA / NASA UFGS-04 21 26 (November 2009)-Preparing Activity: USACE SupersedingUFGS-04 21 26 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 04 - MASONRYSECTION 04 21 26GLAZED STRUCTURAL
2、 CLAY TILE AND PREFACED CONCRETE MASONRY UNITS11/09PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 SHAPES AND TOLERANCES2.2 CERAMIC GLAZED STRUCTURAL CLAY FACING TILE2.2.1 Facing Tile Sizes and Colors2.2.2 Facing Tile Schedule2.3 PREFACED CONCRETE MASO
3、NRY UNITS2.4 MORTAR AND GROUT2.4.1 Mortar2.4.2 Grout2.4.3 Non-Staining, Chemical Resistant Grout2.4.4 Colored Mortar2.4.5 Water2.5 ANCHORS AND TIES2.5.1 Galvanizing2.5.2 Rigid Anchors2.5.3 Wire Ties2.5.4 Horizontal TrussPART 3 EXECUTION3.1 PROTECTION3.2 INSTALLATION3.3 MORTAR3.4 JOINTS3.4.1 Tooled J
4、oints3.4.2 Control Joints3.4.3 Non-Staining Grouted Joints3.4.4 Other Work3.4.5 Bonding and AnchoringSECTION 04 21 26 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.6 Anchor to Structural Elements3.4.7 Double-Faced Bases or Partitions3.4.8
5、 Ends of Partitions3.5 POINTING AND CLEANING- End of Section Table of Contents -SECTION 04 21 26 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-04 21 26 (November 2009)-Preparing Activity: USACE Superseding
6、UFGS-04 21 26 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION 04 21 26GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE MASONRY UNITS11/09*NOTE: This guide specification covers the requirements for application methods for ceramic gl
7、azed structural clay facing tile units and prefaced concrete masonry units.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not
8、required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone numbe
9、r, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The following information should be indicated on the project drawings:1. Schedule of location of types, bonds and colors of the facing tile or prefaced masonry units.2. Lo
10、cation of control and expansion joints.3. Connections to structural elements and lateral support.4. Anchorage to floors, ceilings, and abutting walls.SECTION 04 21 26 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5. Lintels.6. Detail built-in
11、 electrical or mechanical equipment.7. Fire Rating. Show special connections or details.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragr
12、aph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue d
13、ates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process. *The publications listed below form a part of this specification to the extent referenced. The publications are refe
14、rred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM A 153/A 153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel HardwareASTM A 568/A 568M (2009) Standard Specifications for Steel, Sheet, Carbon, and High-Strength, Low-Alloy, Hot-Rolled and
15、Cold-Rolled, General Requirements forASTM A 82/A 82M (2007) Standard Specification for Steel Wire, Plain, for Concrete ReinforcementASTM C 126 (2009) Standard Specification for Ceramic Glazed Structural Clay Facing Tile, Facing Brick, and Solid Masonry UnitsASTM C 270 (2008a) Standard Specification
16、for Mortar for Unit MasonryASTM C 476 (2009) Standard Specification for Grout SECTION 04 21 26 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-for MasonryASTM C 744 (2008) Prefaced Concrete and Calcium Silicate Masonry UnitsASTM C 90 (2009) Loa
17、dbearing Concrete Masonry UnitsTILE COUNCIL OF AMERICA (TCA)TCA Hdbk (2007) Handbook for Ceramic Tile Installation1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the pr
18、oject. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be
19、 reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the
20、 “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and
21、 “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ desi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0421262009GLAZEDSTRUCTURALCLAYTILEANDPREFACEDCONCRETEMASONRYUNITS 结构 陶土 表面 预处理 混凝土 砌块 PDF

链接地址:http://www.mydoc123.com/p-449557.html