ARMY MIL-P-63052-1976 PANEL FIRING FAE CBU-55 UH-1 ASSEMBLY AND PACKING《CBU-55 UH-1式油气炸弹(FAE)发射控制板用组合件及其包装》.pdf
《ARMY MIL-P-63052-1976 PANEL FIRING FAE CBU-55 UH-1 ASSEMBLY AND PACKING《CBU-55 UH-1式油气炸弹(FAE)发射控制板用组合件及其包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63052-1976 PANEL FIRING FAE CBU-55 UH-1 ASSEMBLY AND PACKING《CBU-55 UH-1式油气炸弹(FAE)发射控制板用组合件及其包装》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-b3052 13 7777906 0343036 7 5-37- o3 t41 L-P- 6 3052 (PA) 4 PAACH 1976 MILITARY SPEC1 FICATION .s. PANEL, FIRING FAE CBU-55 UH-1 ASSEMBLING AND PACKING This specification is approved for u%e by Picatinny Arsenal, Departnent of the Army, and is vailable for use by all Departments and Agencies of
2、 the Department of Defense. 1. SCOPE 1.1 This specification covers the fabrication, assembling and packing for one type of Firing Panel designated as Panel, Firing FAE CBU-55 H-1. . 2 . APPLICABLE DOCUIENTS 2.1 The following documents of the.issue in effect on date of invitation for bids or request
3、for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY IQIL-P-116 - Preservation, Methods of MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS FEDERAL FEb-STD-151.- Metals; Test Hethods MILITARY MIL-S
4、TD-1OSD - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) -. . FSC: 1345 /THIS DOCUMENT CONTAINS 26 PAGES. “, - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63052 13 = 737370b 0343037 O W - MIL-P-630C2 (PA) MIL-STD-
5、171 - Finishing of Metals and Wood Surfacer DRAWINGS U.S. ARMY PICATINNY ARSENAL 8880602 - Marking and Sealing for Unit Packages 9233628 - Box, Packing, for Panel, Firing, Mine Dispenser (UH-1B Automated) or Panel, .Firing FAE CBU-55 UH-1 9275308 - Cable Assembly Power Electrical UH-1 9275309 - Cabl
6、e Assembly Special Purpose Electrical UH- 1 9275320 - Panel, Firing FAE CBU-55 UH-1 9277243 - Packing and Marking for Box, Fi.b.erboard for, Cable Assembly Power 9277244 - Box, Fiberboard, Packing for, Cable Assembly 9277245 - Packing and Marking, for Box, Fiberboard, for, Cable Assembly Special Pur
7、pose 9277246 - Box, Fiberboard, Packing for, Cable Assembly Special Purpose (Copies of specifications, standard; and drawings required by contractors in coonection with specific procurement functions should be obtained from the procuring activity or as directed . by the Contracting Officer). 3. REQU
8、IREMENTS 3.1 Material. - Materials shall be in accordance with applicable drawings and specifications . * 3.2 Assembl . - The assembly shall comply with all require- ments spec4 U lu Ln O m o I pc I 4 H z E I. lu Cu ma m M mm . f ln. In lnln rn c, o al k al tl ki k A rl ci Provided by IHSNot for Res
9、aleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63052 13 W 9999906 0343043 2 W MIL-P-63052 (PA?) 4.4 Quality conformance inspection 4.4.1 Inspection lot formation. - Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination. - (See
10、 MIL-A-48078). Unless other- wise specified in the classification of defects and test in accordance? with MIL-STD-105, Inspection Level 1?1. Equip- ment necessary for the performance of the inspections listed shall be in accordance with 4.4.4. ? tables, sampling plans for major and minor defects sha
11、ll?be I. . . I? Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a I- cr U b n P - MIL-P-63052 13 = 977770b 0343042 4 W i. U G k m ri E s pc ri W.W. bt8t O0 O0 at n LnO o0 Od Id d k aJ a a, c O z 2 _. Q g. 3 “ U k ri a, a d fa E UM cc 04 fi* he proced
12、ure specified in 4.5.2. All assemblies that fail to comply with the require- ment shall be classed defective and removed from the lot (Non-Destructive Test). be performed 100 percent in accordance with the procedure specified in 4.5.2. the requirement shall he classed defective and removed from the
13、lot (Non-Destructive Test) . required to perform the inspections and .tests prescribed in thisispecification is identified in the Paragraph Reference/ Inspection Method column in the tables starting with palci- graph 4.4.2.1, and the test method paragraphs (see 4.5). The contractor shall submit for
14、approval, inspection equip- ment designs in accordance with the terms of the contract. See Section 6.of MIL-A-48078, and 6.2 herein, 4.4.3.2.2 Insulation Resistance Test.- This test shall All assemblies that fail to comply with 4.4.4 1.nspect.ion Equipment. - The inspection equipment 4.5 Test Method
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP630521976PANELFIRINGFAECBU55UH1ASSEMBLYANDPACKINGCBU55UH1 油气 炸弹 FAE 发射 控制板 组合 及其 包装 PDF

链接地址:http://www.mydoc123.com/p-446710.html