ARMY MIL-G-52996 A-1989 GRADER HEAVY ROAD MOTORIZED DED COMMERCIAL CONSTRUCTION EQUIPMENT (CCE)《商业建筑设备重型双错检测机动平地》.pdf
《ARMY MIL-G-52996 A-1989 GRADER HEAVY ROAD MOTORIZED DED COMMERCIAL CONSTRUCTION EQUIPMENT (CCE)《商业建筑设备重型双错检测机动平地》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-52996 A-1989 GRADER HEAVY ROAD MOTORIZED DED COMMERCIAL CONSTRUCTION EQUIPMENT (CCE)《商业建筑设备重型双错检测机动平地》.pdf(37页珍藏版)》请在麦多课文档分享上搜索。
1、 -3845 MIL-G-5277bA 38 777770b 022L794 7 19 ed so when the crperator is seated with seat belt fastened and pmprly adjusted, he has cowdent acxess to operathg contmls as well as visibility of the work zone and all inStnmien ts and indicators maunted on the ill also insulated soun-suppm RaPS cab; hot
2、water personnel heater (equipped with one or mre shut-off valve in the Coolant: lines to stop and vary the flaw of coolant to the heater); desting system for cab winduws; front and rear windchield wipers; radiator winterfront; hsula.t;ed engine an radiator mnprtmnts; insulated battery box; and batte
3、ry- finned connectom. Winterization ccarrponents shall not affect the performance of the grader, and all other grader rquhments shall be mt as specified hemin. 3.23.3 Winterization fit, nie kit shall consist of the caporients for 3.23.4 Heater cmd heat excham er. liie -cher ltSwhgfirett heater, part
4、 nw 26=9002t or equal, chal1 be used for preheat pwposes. When specified (see 6.2)t a quantity of heaters shall be furnished. The -cher heat exchanger (water jacket), part no. 26-9013, or equal that is ccanpatible with the Swingfire heater, shall be pravided for heating the engine coolant. The heat
5、excharger shall be located near the engine campartment for easy accessibility for insertion of heater. The heater Unit starting aperation shall be pmvided by the graders 24-volt electximi. system, using a wiring hamecs with Bosh xeceptacle, park 110. 135050012, or egual, ccarp.tible with the heater
6、startex cable connector. After heater start and insertion into heat excharger, preheating of the engine ooolant shall be prwided by thenmsiphon action. -1 be muted to the battery box for wen, hot-aiir dremhmg of the battery box and then muted away fm the battery box to the atniosphere. shall not be
7、mpeded by exceCsive back pressure or leakage. ah, the system chal1 be insulated and heat shielded, as required. The heater exhaust hot air nie hot aMuw To mtain the hot 3.23.5 insulation. Insulation shall conform to MIGI-14511, 0.50 indi. Adhesive for bonding the insulation shall retain its adhesive
8、 properties at ambient: tempexalxxres to -60 OF. 3.23.6 Kit perf ormance. The winterization fit shall be of su wer, initial seyvicbg and run- in may be accmplished with lubricants star), tihe lubricant supplied shall be frcan a soume that is liste on the applicable am;. J 3.26 FWf Orniance. 3.26.1 B
9、lade mil. IIie grader shall develcp a blade puil of not less than 18,000 pounds at 2 iO.1 np.il at the specified operating Weight, on a dry, level, concrete 8urface, with no more than a 15-perCent slip fahr. 3.2642 vel mee . Ihe grader shall be capable of a fom travel speed of not: less than 20 rrQI
10、 on lwel pavmt. 3.26.3 Blade lit. aie blade shall have a lift abwe ground of not less than 16 W. 3.26-4 Blade cut. Ikae blade shall have a cut belav grcnnid of nut less than 10 inches, 3.26.5 Blade reach. 2e blade shall have a reach (right and left) of not less than 6 feet outside the rear tires. 3-
11、26.6 Bank anCr le. The blade shall have a right and left bank cutting angle of 90 degrees. 3.26.7 Chle turn. Ilae blade shall be capable of travers 360 degrees, withcut remuvirg ariy niachine cmpxmpraval of the contracting officer. Ihe plates shall be attached to the left side of the grader and shal
12、l shuw the location as viewed fm the left side. nie -ions for changing the nunbrs based on the vehicle Plates shall conform to MIL-P-514 or contractorls standarcl 3.35.5 Case. nie contractor shall furnish the fastenerc and shall install the Gavemmient: umished case on the grader (see 3.36) . 3.35.5.
13、1 Mmnth bracket. unless otherwise specified (see 6.2), the ic radiation limitc not as specified. Highway and water transportability not as specified. Air transportability nut as specified. 4 3.24 3.25, 3.25.1 3.27 3.28 328.1 3.29 3.30 3.31 3.32.1 3.32.2 24 Provided by IHSNot for ResaleNo reproductio
14、n or networking permitted without license from IHS-,-,-MIL-G-52776A 38 7779706 0223768 T M Fht Article 1 X X X X X X X X X X X X X X Individual 2 X X X X X X X X X X X X X X MILrG52996A(ME) m3LE I. Examuia tion schedule. (Contd) Defect 3 156. 157. 158. 159. 160. 161. 162. 163. 164. 165. 166. 167. 16
15、8. 169. mil transportability not as specified. Lioading capability not as specified. Fuel capacity not as specified. steering frame lock not as specified. Siiqing attachmnts not as specified. Tied- provisions not as specified. Treatment and paint- ing not as specified. paint color not as cpeci fi (i
16、f specified) not fllmished. 171. Vekicle classifica- tion not furnished. 172. Cracke or broken parts or assemblies. pemianent defom- tion of any part or ass4mbly. 4 3.37 3.38 3.39 4.5.2 !Ists. Tests chal1 be condu& in accordance with table II. Prior to conducting any operational tests, all s“E/CE di
17、agmstic tests specified In 3a23.8 shall be IIEsID& and recorded. TAEEE II. Tect= schedule. Fbt arkicle 1 X X X X X X X X Individual 2 3 operating weight. Fuel tank capacity. stearing and brakuig systems. scarifier swath with. Cold tests, when applicable. Installation test, when applicable. DCA capab
18、ility. 26 Test paragraph 4 4.5.2.1 4.5.2.2 4.5.2.3 4.5.2.4 4.5.2.5 4.5.2.6 4.5.2.7 4.5.2.8 Raquirement: paragraph 3.1 3.5 3.12 3.13.1 3.13.2 3.19 3.23.6 3.23.7 3.23.8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-5277bA 38 a 7777706 0223770 8
19、 a Fht article 1 X X X X X X X X X X X X X X X X X Individual 2 MIIrG-52996Am) TABLE II. Test cchedule. Test 3 DcA-STE/ICE interfaces. Pmduction run-in. Blade pull. Travel speed. Blade lift. Blade cut. Blade reach. Bank cutting angle. circle tum. construction task. stability. Fording. Noise 1hk-s. m
20、hmtal requirementc. Rail impact test. slinging attach- mts. Tieduwn pravisions . Test paragraph 4 4.5.2.8.1 4.5.2.9 4.5.2.10 4.5.2.11 4.5.2.12 4.5.2.13 4.5.2.14 4.5.2.15 4.5.2.16 4.5.2.17 4.5.2.18 4.5.2.19 4.5.2.20 4.5.2.21 4.5.2.23 4.5.2.24 4.5.2.25 Iteqhmnt paragraph 5 3.23.8 3.26 3.26.1 3.26.2 3.
21、26.3 3.26.4 3.26.5 3.26.6 3.26.7 3.26.8 3.26.9 3.26.10 3.28.1 3.29 3.32.3 3.33.1 3.33.2 4.5.2.1 Weicht. ?il weight of the grader shall be measured with a scale calibraf3 within 6 months of tke test. 3.1 shall constitute failure of this test. Inability to meet the requirementC of 4.5.2.2 Rollover m&e
22、ckive structure (FOR3 and fallh 0biect.S rJrotedive stru- (Fopc). FOB pes.ted in aecordanae with SAE J231 to pmve conformance to 3.5. confornnce to 3.5 shall be cause for rejection. me Rops shall be tested in accozdance with SAE J1040 and the Ihe remaval arid replacanent of Non- 27 Provided by IHSNo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG52996A1989GRADERHEAVYROADMOTORIZEDDEDCOMMERCIALCONSTRUCTIONEQUIPMENTCCE 商业 建筑设备 重型 检测 机动 平地 PDF

链接地址:http://www.mydoc123.com/p-444991.html