1、Excavation Monitoring and Observation for Damage PreventionTECHNICAL REPORT 1166 SECOND EDITION, OCTOBER 2015Special NotesAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and federal laws and regulations should be reviewed.Nei
2、ther API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, or assume any liability or responsibility for
3、 any use, or the results of such use, of any information or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.Classified areas may vary de
4、pending on the location, conditions, equipment, and substances involved in any given situation. Users of this Technical Report should consult with the appropriate authorities having jurisdiction.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to
5、assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation
6、of any authorities having jurisdiction with which this publication may conflict.API publications are published to facilitate the broad availability of proven, sound engineering and operating practices. These publications are not intended to obviate the need for applying sound engineering judgment re
7、garding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standar
8、d is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such products do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, translated, stored in a retriev
9、al system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005.Copyright 2015 American Petroleum InstituteForewordNothi
10、ng contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against li
11、ability for infringement of letters patent.Shall: As used in a standard, “shall” denotes a minimum requirement in order to conform to the specification.Should: As used in a standard, “should” denotes a recommendation or that which is advised but not required in order to conform to the specification.
12、Suggested revisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW, Washington, DC 20005, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13、 . . . . . . . . . . . . . . . . . 12 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Flow Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Decision Nodes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24.1 Decision Node 1Is Additional Information Required?. . .
15、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24.2 Decision Node 2Office Analysis and Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.3 Decision Node 3Site Visit Resolution . . . . . . . . . . . . . . . . . . . .
16、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.4 Decision Nodes 4 and 5Excavation Proximity to Pipeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.5 Decision Node 6Ticket Closure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17、 . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45.1 Task AClose Ticket . . . . . . . . . . . . . . . . . . . . . . .
18、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45.2 Task BSecure Additional Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.3 Task CConduct Site Visit . . . . . . . . . . . . . . .
19、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.4 Task DPerform Locate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.5 Task EExcavation Monitoring. . . . .
20、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.6 Task FExcavation Observation Not Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55.7 Task GExcavation Observation . . . . . . .
21、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Figure 1 FlowchartExcavation Monitoring and Observation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Bibliography . . . . . . . . . . . . . . . . . . . . . . .
22、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8v1Excavation Monitoring and Observation for Damage Prevention1 ScopeThe scope of this technical report is to provide a consistently applied decision making process for monitoring and
23、observing of excavation and other activities on or near pipeline rights-of-way for “hazardous liquid” and “natural and other gas” transmission pipelines. The goal is to protect the public, excavation employees, and the environment by preventing damage to pipeline assets from excavation activities.NO
24、TE Pipeline operators are encouraged to refer to the latest edition of Common Ground Alliances “CGA Best Practices” for additional guidance.2 DefinitionsFor the purposes of this document, the following definitions apply.2.1activity Identified excavation activity.2.2excavation Disturbance or removal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APITR11662015EXCAVATIONMONITORINGANDOBSERVATIONFORDAMAGEPREVENTIONSECONDEDITIONPDF

链接地址:http://www.mydoc123.com/p-430131.html