AIR FORCE MIL-STD-1540 D-1999 PRODUCT VERIFICATION REQUIREMENTS FOR LAUNCH UPPER STAGE AND SPACE VEHICLES《航天器上层级发射的生产验证要求》.pdf
《AIR FORCE MIL-STD-1540 D-1999 PRODUCT VERIFICATION REQUIREMENTS FOR LAUNCH UPPER STAGE AND SPACE VEHICLES《航天器上层级发射的生产验证要求》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-STD-1540 D-1999 PRODUCT VERIFICATION REQUIREMENTS FOR LAUNCH UPPER STAGE AND SPACE VEHICLES《航天器上层级发射的生产验证要求》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、AMSC N/A FSC 1810MIL-STD-1540D15 January 1999_SUPERSEDINGMIL-STD-1540C15 SEPTEMBER 1994DEPARTMENT OF DEFENSESTANDARD PRACTICEPRODUCT VERIFICATIONREQUIREMENTSFORLAUNCH, UPPER STAGE, AND SPACEVEHICLESNOTMEASUREMENTSENSITIVEProvided by IHSNot for ResaleNo reproduction or networking permitted without li
2、cense from IHS-,-,-iiFOREWORD1. This Military Standard is approved for use by all Departments and Agencies ofthe Department of Defense.2. Beneficial comments (recommendations, additions, or deletions) and anypertinent data which may be of use in improving this document should beprovided by letter ad
3、dressed to:Space and Missile Systems Center, SMC/AXM160 Skynet Street, Suite 2315El Segundo, CA 90245-46833. A verification process is required by this document. The verification process isfundamental in the development of a successful launch or space system. Theprocess involves various tasks perfor
4、med in different program phases applyinga coherent bottom-up building block concept.4. The fact that most launch and space systems involve flight equipment that isnot recoverable and not repairable means that risk management is essential.The cost of a failure may be extremely high due to the loss of
5、 missioncapability and the loss of equipment. The large number of independentorganizations involved and the complexity of equipment and software meansthat extensive verification of launch and space systems is necessary to reducethe risk of failure. A combination of different verification methodologi
6、es (e.g.,Test, Analysis, Inspection) at several assembly levels (from units to the overallsystem) through the various program verification phases (e.g. Qualification,Acceptance, Pre-launch, On-orbit) is cost effective in assuring successfulequipment and software design and operation.Provided by IHSN
7、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iiiCONTENTSPARGRAPHpageFOREWORD ii1. SCOPE . 11.1 Scope 12. APPLICABLE DOCUMENTS 12.1 General 12.2 Government Documents . 12.2.1 Specifications, standards and handbooks . 12.3 Non Government Publications . 22.4 Order o
8、f precedence . 23. DEFINITIONS . 33.1 Part. 33.2 Subassembly . 33.3 Unit 33.4 Subsystem 33.5 Vehicle 33.5.1 Launch Vehicle 33.5.2 Upper-stage Vehicle . 33.5.3 Space Experiment 33.5.4 Space Vehicle . 33.5.5 Flight Vehicle 43.6 System . 43.7 Combined Systems 43.7.1 Launch Systems 43.7.2 On-orbit Syste
9、m 43.8 Airborne Support Equipment (ASE) 43.9 Critical Unit . 43.10 Development Test Article . 43.11 Reusable Item 54. GENERAL REQUIREMENTS . 64.1 Objectives of Verification . 64.2 Verification Activities 64.3 Risk Management . 7Provided by IHSNot for ResaleNo reproduction or networking permitted wit
10、hout license from IHS-,-,-ivTABLE OF CONTENTS(continued)5. DETAILED REQUIREMENTS 85.1 Requirements Allocation . 85.2 Service Life Cycle Profile . 85.3 Environmental Design Requirements . 85.4 V erification Methods . 95.4.1 Analysis 105.4.2 Test . . 105.4.2.1 Hardware Qualification . 105.4.2.1.1 Qual
11、ification Techniques . 105.4.2.1.2 Qualification Test Requirements . 105.4.2.1.3 Test for Risk Mitigation 115.4.2.2 Hardware Acceptance 115.4.2.2.1 Acceptance Test Requirements . 115.4.2.2.2 Acceptance Methods 125.4.2.2.3 Test for Risk Mitigation 125.4.3 Inspection . 135.4.4 Demonstration 135.4.5 Si
12、milarity . 135.5 Integrated Test Plan . 135.6 Preparation for Verification Activities 145.6.1 Preparation for Analysis 145.6.2 Preparation for Test Activities . 145.6.3 Preparation for Inspections . 145.6.4 Preparation for Demonstrations . 155.6.5 Documentation for Demonstrations . 155.6.6 Process I
13、mprov ement 155.7 Conduct Verification Activities 155.8 Evaluate Verification Results . 156.0 NOTES . 166.1 Shared Database . 166.2 Guidance Tables . 16TABLEST-1 Factors to Consider When Establishing Test Requirements. 17T-2 Type of Subsystem 18-21T-3 Primary Qualification Tests to Identify Failure
14、Mechanism . 22T-4 Primary Acceptance Test to Precipitate Failure Mechanism . 23CONCLUDING MATERIAL . 24Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1540D11. SCOPE1.1 Scope. This document requires that a process be established todevelop and
15、 manage verification requirements to assure that launch and spaceequipment can function correctly and withstand stresses it may encounter during itslife cycle including end-of-life performance requirements. This document isintended for use in developing the detailed verification requirements for a p
16、articularproject. The application of these requirements should result in an effectiveverification process and consequently high confidence in achieving successfulspace missions.2. APPLICABLE DOCUMENTS2.1 General. The documents listed in this section are specified in sections 3, 4,and 5 of this stand
17、ard. This section does not include documents cited in othersections of this standard or recommended for additional information or as examples.While every effort has been made to ensure the completeness of this list, documentusers are cautioned that they must meet all specified requirements documents
18、 citedin sections 3, 4, and 5 of this standard, whether or not they are listed.2.2 Government Documents .2.2.1 Specifications, standards, and handbooks . The following standards andspecifications form a part of this document to the extent specified herein. Unlessotherwise specified, the issues of th
19、ese documents are those listed in the issue ofthe Department of Defense Index of Specifications and Standards (DODISS) andsupplement thereto, cited in the solicitation.DEPARTMENT OF DEFENSE STANDARDSMIL -STD -810 Environmental Test Methods andEngineering Guidelines.MIL -STD -1522 (USAF) Standard Gen
20、eral Requirements for Safe Design and Operation of Pressurized Missile and Space Systems.MIL -STD -1541 (USAF) Electromagnetic Compatibility Requirements forSpace Systems.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1540D2MIL -STD -1833 (U
21、SAF) Test Requirements for Ground Equipmentand Associated Computer Software Supporting Space Vehicles. (Cancele d)MIL-HDBK-340A (USAF) Volume 1 Test Requirements For Launch, Upper Stage i.e., the launch vehicle(s), the upper -stage vehicle(s),and the space vehicle(s) to be sent to orbit.3.6 System .
22、 A system is a composite of equipment, skills, and techniquescapable of performing or supporting an operational role. A system includes alloperational equipment, related facilities, material, software, services, and personnelrequired for its operation. A system is typically defined by the System Pro
23、gramOffice or the procurement agency responsible for its acquisition.3.7 Combined Systems . Combined systems are interconnected systems thatare required for program level operations or operational tests. The combinedsystems of interest are typically the launch system and the on -orbit system.3.7.1 L
24、aunch System . A launch system is the composite of equipment, skills,and techniques capable of launching and boosting one or more space vehicles intoorbit. The launch system includes the flight vehicle and related facilities, groundequipment, material, software, procedures, services, and personnel r
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILSTD1540D1999PRODUCTVERIFICATIONREQUIREMENTSFORLAUNCHUPPERSTAGEANDSPACEVEHICLES 航天器 层级 发射 生产

链接地址:http://www.mydoc123.com/p-428481.html