Beams Week in Review.ppt
《Beams Week in Review.ppt》由会员分享,可在线阅读,更多相关《Beams Week in Review.ppt(10页珍藏版)》请在麦多课文档分享上搜索。
1、07 October 2002,All Experimenters Meeting,Beams Week in Review,Accelerator Performance Lost stores D0, CDF, Tevatron AccessPbar transfers to RecyclerTevatron StudiesGood weekend,07 October 2002,All Experimenters Meeting,Beams Week in Review,Lost Stores 1808 terminated after 12.4 hrs due to CHL fire
2、1810 lost due to quench at A1 during squeeze 1817 lost due to quench at A1 at flattop 1823 lost after 11.3 hrs due to B2 HFU 1826 terminated after 14.2 hrs TRF heater pumps turned off Shutdown Access D0 cooling fan repair Wet engine repair Instrumentation,07 October 2002,All Experimenters Meeting,Be
3、ams Week in Review,Pbar Transfers to Recycler Stacking efficiency (MI-RR) 88% Stacking efficiency(Acc-RR) overall 75% Stored 75E10 with lifetime 100 hrs Tevatron Studies Transverse Dampers Smoothed orbits up the ramp and thru the squeeze Adjusted tunes and coupling up the ramp and low beta A0 and C0
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BEAMSWEEKINREVIEWPPT
