VA 23 73 00-2011 INDOOR CENTRAL-STATION AIR-HANDLING UNITS.pdf
《VA 23 73 00-2011 INDOOR CENTRAL-STATION AIR-HANDLING UNITS.pdf》由会员分享,可在线阅读,更多相关《VA 23 73 00-2011 INDOOR CENTRAL-STATION AIR-HANDLING UNITS.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、04-11 23 73 00 - 1 SECTION 23 73 00 INDOOR CENTRAL-STATION AIR-HANDLING UNITS SPEC WRITER NOTES: 1. Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this section are gage
2、 pressure unless otherwise noted. PART 1 - GENERAL 1.1 DESCRIPTION A. Air handling units including integral components specified herein. B. Definitions: Air Handling Unit (AHU): A factory fabricated and tested assembly of modular sections consisting of / housed-centrifugal fan with V-belt drive / /s
3、ingle or multiple plenum fans with direct-drive /, coils, filters, and other necessary equipment to perform one or more of the following functions of circulating, cleaning, heating, cooling, humidifying, dehumidifying, and mixing of air. Design capacities of units shall be as scheduled on the drawin
4、gs. 1.2 RELATED WORK /A. Seismic restraints for equipment: Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. / B. General mechanical requirements and items, which are common to more than one section of Division 23: Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEA
5、M GENERATION. C. Sound and vibration requirements: Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT. D. Piping and duct insulation: Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION. E. Piping and valves: Section 23 21 13 / 23 22 13, HYDRONIC PIPING / STEAM AND
6、 CONDENSATE HEATING PIPING. F. Heating and cooling coils and pressure requirements: Section 23 82 16, AIR COILS. G. Return and exhaust fans: Section 23 34 00, HVAC FANS. H. Requirements for flexible duct connectors, sound attenuators and sound absorbing duct lining, and air leakage: Section 23 31 00
7、, HVAC DUCTS and CASINGS. I. Air filters and filters efficiency: Section 23 40 00, HVAC AIR CLEANING DEVICES. J. HVAC controls: Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 73 00 -
8、 2 K. Testing, adjusting and balancing of air and water flows: Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC. L. Types of motors: Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT. M. Types of motor starters: Section 26 29 11, LOW-VOLTAGE MOTOR START
9、ERS. N. General Commissioning: Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS O. HVAC Commissioning: Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS 1.3 QUALITY ASSURANCE A. Refer to Article, Quality Assurance, in Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION. B. Air Hand
10、ling Units Certification 1. Air Handling Units with Housed Centrifugal Fans: The air handling units shall be certified in accordance with AHRI 430 and tested/rated in accordance with AHRI 260. 2. Air Handling Units with Plenum Fans: a. Air Handling Units with a single Plenum Fan shall be certified i
11、n accordance with AHRI 430 and tested/rated in accordance with AHRI 260. b. Air handling Units with Multiple Fans in an Array shall be tested and rated in accordance with AHRI 430 and AHRI 260. C. Heating, Cooling, and Air Handling Capacity and Performance Standards: AHRI 430, AHRI 410, ASHRAE 51, a
12、nd AMCA 210. D. Performance Criteria: 1. The fan BHP shall include all system effects for all fans and v-belt drive losses for housed centrifugal fans. 2. The fan motor shall be selected within the rated nameplate capacity, without relying upon NEMA Standard Service Factor. 3. Select the fan operati
13、ng point as follows: a. Forward Curve and Axial Flow Fans: Right hand side of peak pressure point. b. Air Foil, Backward Inclined, or Tubular Fans Including Plenum Fans: At or near the peak static efficiency but at an appropriate distance from the stall line. 4. Operating Limits: AMCA 99 and Manufac
14、turers Recommendations. E. Units shall be factory-fabricated, assembled, and tested by a manufacturer, in business of manufacturing similar air-handling units for at least five (5) years. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 73 00
15、 - 3 SPEC WRITERS NOTES: For larger projects involving more than five air handling units, the A/E shall select a few typical AHUs, in different configurations, for an initial submission. The suggested different configurations are: 1. 100 percent outside air AHUs with or without heat recovery coils.
16、2. Re-circulating type of variable air volume AHUs with minimum outside air and economizer cycle features. The remaining submission shall be received only after the initial submission is approved with satisfactory resolution of all comments made during the review and approval process. 1.4. SUBMITTAL
17、S: A. The contractor shall, in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish a complete submission for all air handling units covered in the project. The submission shall include all information listed below. Partial and incomplete submissions shall be rejected
18、without reviews. B. Manufacturers Literature and Data: 1. Submittals for AHUs shall include fans, drives, motors, coils, / humidifiers, / sound attenuators /, mixing box with outside/return air dampers, filter housings, / blender sections /, and all other related accessories. The contractor shall pr
19、ovide custom drawings showing total air handling unit assembly including dimensions, operating weight, access sections, / diffusion plates /, flexible connections, door swings, controls penetrations, electrical disconnect, lights, duplex receptacles, switches, wiring, utility connection points, unit
20、 support system, vibration isolators, drain pan, pressure drops through each component (filter, coil etc). 2. Submittal drawings of section or component only will not be acceptable. Contractor shall also submit performance data including performance test results, charts, curves or certified computer
21、 selection data; data sheets; fabrication and insulation details. If the unit cannot be shipped in one piece, the contractor shall indicate the number of pieces that each unit will have to be broken into to meet shipping and job site rigging requirements. This data shall be submitted in hard copies
22、and in electronic version compatible to AutoCAD version used by the VA at the time of submission. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 73 00 - 4 3. Submit sound power levels in each octave band for the inlet and discharge of the f
23、an and at entrance and discharge of AHUs at scheduled conditions. In absence of sound power ratings refer to Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT. 4. Provide fan curves showing Liters/Second (cubic feet per minute), static pressure, efficiency, and horsepower f
24、or design point of operation and at maximum design Liters/Second (cubic feet per minute). 5. Submit total fan static pressure, external static pressure, for AHU including total, inlet and discharge pressures, and itemized specified internal losses and unspecified internal losses. Refer to air handli
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2373002011INDOORCENTRALSTATIONAIRHANDLINGUNITSPDF

链接地址:http://www.mydoc123.com/p-1074931.html