VA 23 72 00-2011 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT.pdf
《VA 23 72 00-2011 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT.pdf》由会员分享,可在线阅读,更多相关《VA 23 72 00-2011 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、05-11 23 72 00-1 SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This Section specifies /air to
2、 air heat pipe heat exchangers /rotary air-to-air heat exchangers /air-to-air plate heat exchangers /and /run-around heat recovery systems/. 1.2 RELATED WORK A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment. /B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NO
3、N-STRUCTURAL COMPONENTS: Seismic requirements for non-structural equipment./ C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items, which are common to more than one section of Division 23. D. Section 23 21 23, HYDRONIC PUMPS: Requirements for pumping equipment
4、. E. Section 23 07 11, HVAC and BOILER PLANT INSULATION: Requirements for piping insulation. F. Section 23 21 13, HYDRONIC PIPING: Requirements for piping for expansion tanks. G. Section 23 82 16, AIR COILS: Requirements for run-around system coils. H. Section 23 31 00, HVAC DUCTS and CASINGS: Requi
5、rements for sheet metal ducts and fittings. I. Section 23 40 00, HVAC AIR CLEANING DEVICES: Requirements for filters used before heat recovery coils. J. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Requirements for controls and instrumentation. K. Section 23 05 93, TESTING, ADJUSTING an
6、d BALANCING FOR HVAC: Requirements for testing, adjusting and balancing of HVAC system. L. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. M. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS 1.3 QUALITY ASSURANCE A. Refer
7、 to paragraph, GUARANTEE in specification Section 00 72 00, GENERAL CONDITIONS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 72 00-2 B. Refer to specification Section 01 00 00, GENERAL REQUIREMENTS for performance tests and instructions t
8、o VA personnel. C. Refer to paragraph QUALITY ASSURANCE in specification Section 23 05 11, COMMON WORK RESULTS FOR HVAC. D. Performance Criteria: Heat recovery equipment shall be provided by a manufacturer who has been manufacturing such equipment and the equipment has a good track record for at lea
9、st 3 years. E. Performance Test: In accordance with PART 3. 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Manufacturers Literature and Data: 1. Heat Pipe Heat Exchanger 2. Rotary Heat Exchanger 3. Plate Heat Exchanger 4. Run-Around Energy
10、Recovery System C. Certificate: Submit, simultaneously with shop drawings, an evidence of satisfactory service of the equipment on three similar installations. D. Submit type, size, arrangement and performance details. Present application ratings in the form of tables, charts or curves. E. Provide i
11、nstallation, operating and maintenance instructions, in accordance with Article, INSTRUCTIONS, in Section 01 00 00, GENERAL REQUIREMENTS. F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the da
12、te of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
13、 B. Air Conditioning, Heating, and Refrigeration Institute (AHRI) AHRI 1060-2005 . Performance Rating of Air-to-Air Heat Exchangers for Energy Recovery Ventilation Equipment C. American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE): 15-10 Safety Standard for Refrigeration
14、 Systems (ANSI) 52.1-92 Gravimetric and Dust-Spot Procedures for Testing Air-Cleaning Devices Used in General Ventilation for Removing Particulate Matter Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 72 00-3 52.2-07 Method of Testing Gener
15、al Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size 84-08 Method of Testing Air-to-Air Heat/Energy Exchangers D. American Society for Testing and materials (ASTM) D635-10 Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Po
16、sition E84-10 . Standard Test Method for Surface Burning Characteristics of Building Materials E. American Society of Civil Engineers (ASCE) ASCE 7-10 Minimum Design Loads for Buildings and Other Structures F. Underwriters Laboratories, Inc (UL) 1812-2009 Standard for Ducted Heat Recovery Ventilator
17、s 1815-2009 Standard for Nonducted Heat Recovery Ventilators PART 2 - PRODUCTS DESIGNERS NOTE: For high-humidity locations (VA HVAC Design Manual), provide copper tubes and copper fins. See Section 23 82 16, AIR COILS for details 2.1 AIR-TO-AIR HEAT PIPE HEAT EXCHANGERS A. Thermal recovery units sha
18、ll be capable of operating at temperatures ranging from a minimum of -29 degrees C (-20 degrees F) to a maximum of 49 degrees C (120 degrees F). The heat transfer between air streams shall take place in a counterflow arrangement. The unit shall have no moving part and shall be one piece construction
19、. B. Tube core shall be either 18-mm (5/8 inch) or 25-mm (1 inch) OD seamless /aluminum/copper/ tubing permanently expanded into the fins to form a firm, rigid and complete metal pressure contact between the tube and fin collar of all operating conditions. For high-humidity locations, provide copper
20、 tunes and copper fins. C. Fin: /Aluminum/Integral aluminum/copper/ 1. Fin Spacing: /3.2 mm (0.125 inch)/2.3 mm (0.091 inch)/1.8 mm (0.071 inch)/1.7 mm (0.067 inch)/1.4 mm (0.056 inch)/0.2 mm (0.0075 inch)/ 2. Fin and Tube Joint: Mechanical bond and silver brazed. D. Coating: /Thermoplastic vinyl/ep
21、oxy/Synthetic resin/phenolic/Polytetrafluoroethylene/Vinyl ester/ apply to supply and exhaust. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 72 00-4 E. Secondary surfaces shall be of continuous plate type aluminum fins, 0.18 mm (0.007 inch
22、) thick, and of corrugated design to produce maximum heat transfer efficiencies. F. Basic capillary wick shall be an integral part of the inner wall of the tube and provide a completely wetted surface for maximum heat pipe capacity with minimum heat transfer resistance. G. Refrigerants used shall be
23、 approved by EPA. H. Exhaust and supply airstreams shall be separated from each other by a vertical partition, so that there will be no cross-contamination. 1. Partition Material: /Galvanized steel /Stainless steel/. 2. Partition Material Thickness: 1.7 mm (16-Gauge). I. Casing shall be a minimum of
24、 1.9 mm (14-Gauge) galvanized steel flanged casing, with airtight partition between airstreams. J. End covers shall be a minimum of 1.0 mm (20-Gauge) galvanized steel. K. Tilt-Control Mechanism: For summer-winter operation with an electric actuator; and having control panels and sensing bulbs as sho
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2372002011AIRTOAIRENERGYRECOVERYEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-1074930.html