1、02-10 23 65 00-1 SECTION 23 65 00 COOLING TOWERS SPEC WRITER NOTES: 1. DELETE BETWEEN /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Specify packaged cooling towers except in the rare cases where field assembled ty
2、pe has been selected. PART 1 - GENERAL 1.1 DESCRIPTION A. Packaged, /induced draft /forced draft /open circuit cooling tower/ closed circuit fluid cooler/complete with fill, fan, /inlet louvers /and associated accessories and equipment. 1.2 RELATED WORK A. Section 03 30 00, CAST IN PLACE CONCRETE: R
3、equirements for concrete inertia bases. /B. Seismic Restraint for Equipment: Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS./ C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION: General mechanical requirements and items, which are common to more th
4、an one item. D. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM GENERATION EQUIPMENT. E. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT: Requirements for vibration isolation. F. Section 23 21 13, HYDRONIC PIPING: Requirements for water piping and fittings
5、. G. Section 23 25 00, HVAC WATER TREATMENT: Requirements for condenser water treatment. H. Section 23 31 00, HVAC DUCTS and CASINGS: Requirements for sheet metal ductwork. I. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS. 1.3 QUALITY ASSURANCE A. Refer to Article, QUALITY ASSURANCE, in specification
6、 Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION. B. Design Criteria: 1. Design to withstand _Pa (_ psf) wind load. 2. Free water drift loss shall not be greater than five hundredths of one percent (0.005) of the water circulated to tower. Provided by IHSNot for ResaleNo reproduc
7、tion or networking permitted without license from IHS-,-,-02-10 23 65 00-2 SPEC WRITER NOTE: Specify dB(A) level based on the project specific acoustic analysis and local ordinance. 3. Sound levels at 1.5 meters (5 feet) and 17 meters (55 feet) in any direction from the tower shall not exceed _dB (A
8、) and _dB (A), respectively. Select “low Noise” model cooling towers, where available. Provide sound attenuators if necessary to meet the noise criteria. C. Performance Criteria: 1. Manufacturer shall certify that performance of cooling towers will meet contract requirements, stating entering air we
9、t bulb temperature, entering and leaving condenser water temperatures, water flow rates, fan kW (horsepower) /and pump head at base of tower/. Certification shall be made at the time of submittal. SPEC WRITER NOTE: CTI certification under Standard 201 applies only to selections with entering water t
10、emperature of 51.7 degrees C (125 degrees F) or less, temperature ranges of 2.2 degrees C (4 degrees F) or more, temperature approaches of 2.8 degrees C (5 degrees F) or more, and wet bulb between 15.5 degrees C to 29.5 degrees C (60 degrees F to 85 degrees F). 2. Cooling Technology Institute (CTI)
11、Certified Towers: These towers shall have been tested, rated, and certified in accordance with Cooling Technology Institute (CTI) Standard 201, and shall bear the CTI certification label, and shall be listed in the CTI directory of certified cooling towers. 3. The alignment and balancing of the fans
12、, motors and drive shaft as installed shall operate within the vibration tolerance specified in specification Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT. 1.4 SUBMITTALS A. Submit in accordance with specification Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMP
13、LES. B. Shop Drawings 1. Sufficient information, clearly presented, shall be included to determine compliance with drawings and specifications. 2. Include rated capacities, pressure drop, fan performance and rating curves, dimensions, weights, mounting details, front view, side view, equipment and d
14、evice arrangement. 3. Include electrical rating, detail wiring for power, signals and controls. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-02-10 23 65 00-3 /4. Pump characteristic curve for the closed circuit fluid cooler. / 5. Sound curves and
15、characteristics of sound attenuators if required to meet the noise criteria. SPEC WRITER NOTE: If the scope of work involves, total building commissioning, coordinate all documentation requirements with the commissioning efforts. C. Certification: 1. Submit four copies of performance curves, for CTI
16、 certified cooling towers, showing compliance with actual conditions specified, to the Resident Engineer two weeks prior to delivery of the equipment. 2. Two weeks prior to final inspection, submit four copies of the following to the Resident Engineer: SPEC WRITER NOTE: Specify the seismic design ca
17、tegory for the project so the cooling tower manufacturers can check/design seismic strength of their equipment. Delete the following paragraph if the seismic design category is A or B. a. Certification from the manufacturer that the cooling tower(s), accessories, and components are suitable for seis
18、mic design category _ installations and that the unit will be fully operational after the seismic event at the project site. b. Certification by the manufacturer that the cooling towers conform to the requirements of the drawings and specifications. c. Certification by the Contractor that the coolin
19、g towers have been installed, adjusted, and tested. 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. American National Standard Institute (ANSI/ASSE)
20、A10.18-2007 Safety Requirements for Temporary Floors, Holes, Wall Openings, Stairways and Other Unprotected Edges in Construction and Demolition Operations C. American Society of Mechanical Engineers (ASME): PTC 23-03 Performance Test Codes on Atmospheric Water Cooling Equipment D. American Society
21、for Testing Materials (ASTM): A385-08 Standard Practice for Providing High-Quality Zinc Coatings (Hot-Dip) B117-07a . Standard Practice for Operating Salt Spray (Fog) Apparatus Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-02-10 23 65 00-4 B209-07
22、Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate E84-08a Standard Test Method for Surface Burning Characteristics of Building Materials E. Cooling Technology Institute (CTI): ATC-105-00 . Acceptance Test Code for Water-Cooling Towers (CTI Code Tower Standard Specifications) ATC
23、-105S-Rev. July 2004 Acceptance Test Code for Closed Circuit Cooling Towers (CTI Code Tower Standard Specifications) 201-02 (Rev. 04) . Standard for Certification of Water Cooling Tower Thermal Performance (CTI Code Tower Standard Specifications) F. National Electrical Manufacturers Association (NEM
24、A): MG 1-2006 Includes . Motors and Generators (ANSI) 250-03 . Enclosures for Electrical Equipment (1000 Volts Maximum) G. National Fire Protection Association (NFPA): 70-08 National Electrical Code PART 2 - PRODUCTS SPEC WRITER NOTE: Induced draft open circuit cooling towers should be used on a maj
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2365002010COOLINGTOWERSPDF