UL SUBJECT 79B-2012 OUTLINE OF INVESTIGATION FOR POWER-OPERATED PUMPS FOR DIESEL FUEL BIODIESEL FUEL DIESEL BIODIESEL BLENDS WITH NOMINAL BIODIESEL CONCENTRATIONS UP TO 20 PERCENT .pdf
《UL SUBJECT 79B-2012 OUTLINE OF INVESTIGATION FOR POWER-OPERATED PUMPS FOR DIESEL FUEL BIODIESEL FUEL DIESEL BIODIESEL BLENDS WITH NOMINAL BIODIESEL CONCENTRATIONS UP TO 20 PERCENT .pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 79B-2012 OUTLINE OF INVESTIGATION FOR POWER-OPERATED PUMPS FOR DIESEL FUEL BIODIESEL FUEL DIESEL BIODIESEL BLENDS WITH NOMINAL BIODIESEL CONCENTRATIONS UP TO 20 PERCENT .pdf(82页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNovember 2, 20121UL 79BOUTLINE OF INVESTIGATIONFORPOWER-OPERATED PUMPS FOR DIESEL FUEL, BIODIESEL FUEL,DIESEL/BIODIESEL BLENDS WITH NOMINAL BIODIESELCONCENTRATIONS UP TO 20 PERCENT (B20), KEROSEN
2、E, AND FUEL OILIssue Number 1November 2, 2012Summary of TopicsThis is the first issue of the Outline of Investigation for Power-OperatedPumps for Diesel Fuel, Biodiesel Fuel, Diesel/Biodiesel Blends WithNominal Ethanol Concentrations Up To 20 Percent (B20), Kerosene, andFuel Oil, UL 79B.COPYRIGHT 20
3、12 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNOVEMBER 2, 2012UL 79B2No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSINTROD
4、UCTION1 Scope .62 General 72.1 Components .72.2 Units of measurement .82.3 Undated references .83 Glossary .8CONSTRUCTION4 Assembly 95 Materials 105.1 Metallic materials 105.2 Nonmetallic materials 115.3 Materials system level 145.4 Casting impregnation materials 145.5 Internal parts .146 Bodies, Co
5、vers, and Heads .147 Drive-Shaft Seals 158 Diaphragms .159 Springs .1510 Floats .1611 Air Separators 1612 Strainers .1613 Outlet Pressure Regulation 1714 Pressure Relief .1815 Mounting and Base .1816 Guards 1817 Piping and Fittings 1918 Hose Nozzle Valve, Hose, and Coupling .2019 Conduit Seals 2120
6、Electrical Equipment 2221 Supply Connections .2422 Current-Carrying Parts 2623 Insulating Material 2624 Internal Wiring 2824.1 Mechanical protection .2824.2 Types of wire 2824.3 Splices and connections 2925 Separation of Circuits .3126 Capacitors .3127 Grounding .3227.1 General .3227.2 Grounding ide
7、ntification .3328 Motors .3428.1 Construction .3428.2 Overload protection .3428.3 Brushes and brush holders 3529 Overload- or Thermal-Protective Devices 36NOVEMBER 2, 2012 UL 79B 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL30 Switches and
8、 Controls .3631 Spacings 37PROTECTION OF PERSONNEL32 General 3933 Sharp Edges .3934 Enclosures and Guards 4035 Materials .4336 Surface Temperatures .4337 Locking Mechanism .4438 Control Application 4439 Secondary Circuits 4439.1 General .4439.2 Protection of wiring .45PERFORMANCE40 General 4541 Long
9、 Term Exposure Test .4641.1 General .4641.2 Samples 4741.3 Method .4741.4 Results .4842 High Pressure Leakage Test .4843 Endurance Test Pumps 5044 Hydrostatic Strength Test 5045 Retention Test for Screws and Bolts 5146 Deformation Test .5147 Leakage of Wire Seal Test .5248 Endurance Test for Air Sep
10、arators 5349 Blocked Outlet Test .5350 Pressure Relief Test 5351 Float Buoyancy Test 5352 Dimensional Stability of Floats Test .5453 Weight Change of Floats Test 5454 Float Crushing Test .5555 10-Day Moist Ammonia-Air Stress Cracking Test .5656 Tests on Sealing Compounds 5657 Metallic Coating Thickn
11、ess Test 5758 Starting Current Test 5959 Input Test 5960 Temperature Test .5960.1 General .5960.2 Maximum normal load 6361 Dielectric Voltage-Withstand Test .6362 Grounding Continuity Test .6463 Rain Test 6564 Submersion Test .6865 Conductor Secureness Test 6866 Insulation Resistance Test .6867 Leak
12、age Current Test .7168 Pneumatic Parts Pressure Distortion Test 73NOVEMBER 2, 2012UL 79B4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL69 Pneumatic Parts Endurance 7470 Pneumatic Parts Impact Test .74MANUFACTURING AND PRODUCTION TESTS71 Gene
13、ral 74INSTRUCTIONS72 General 76RATING73 Details .77MARKING74 General 7775 Cautionary Markings 7976 Permanence of Marking .80SUPPLEMENT SA - Test FluidsSA.1 Representative aggressive combustible test fuel mixtures .SA1NOVEMBER 2, 2012 UL 79B 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODU
14、CTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 These requirements cover products described in 1.2 when used with one or more of the fuelsdescribed in 1.3.1.2 These requirements cover electrically-, hydraulically-, or pneumatically-driven power-operated pumpsfor use with petrol
15、eum products in the following applications:a) Self-contained dispensing devices and submerged pumps used in storage tanks that providethe fuel to remote control dispensing devices. They are intended for operation at dischargepressures of 50 pounds per square inch (psig) (345 kPa), or the marked maxi
16、mum dischargepressure rating, when less, with the ambient and liquid temperature within the range of minus29C (minus 20F) 52C (125F).b) Dispensing systems to transfer the fuel from a tank or container to a vehicle or anothercontainer. They are intended for operation at the marked maximum discharge p
17、ressure, or less,with the ambient and liquid temperature within the range of minus 29C (minus 20F) 52C(125F).c) Vapor recovery applications for dispensing devices. They are intended to operate under avacuum at the inlet and a maximum discharge pressure of 50 psig (345 kPa), or markeddischarge pressu
18、re, whichever is less.1.3 Pumps covered by these requirements are intended for use with one or more of the following:a) Diesel Fuel and diesel/biodiesel blends with nominal biodiesel concentrations up to 5 percent(B0 B5) formulated in accordance with the Standard Specification for Diesel Fuel Oils,
19、ASTMD975.b) Diesel/biodiesel blends with nominal biodiesel concentrations from 5 percent up to 20percent (B6 B20) formulated in accordance with the Standard Specification for Diesel Fuel Oil,Biodiesel Blends (B6 B20), ASTM D7467.c) Biodiesel (B99.9/B100) formulated in accordance with the Standard Sp
20、ecification forBiodiesel Fuel Blend Stock (B100) for Middle Distillate Fuels, ASTM D6751.d) Kerosene formulated in accordance with the Standard Specification for Kerosine, ANSI/ASTM D3699.e) Fuel Oil (Heating Oil) formulated in accordance with the Standard Specification for FuelOils, ASTM D396.1.4 R
21、equirements for the installation and use of these products are included in the Flammable andCombustible Liquids Code, ANSI/NFPA 30; the Motor Fuel Dispensing Facilities and Repair GaragesCode, ANSI/NFPA 30A; and the National Electrical Code, ANSI/NFPA 70.NOVEMBER 2, 2012UL 79B6UL COPYRIGHTED MATERIA
22、L NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL1.5 These requirements do not cover:a) Oil burner pumps, which are evaluated under the Standard for Pumps for Oil-BurningAppliances, UL 343.b) Pumps for engine-powered automotive equipment.c) Pumps for marine use whic
23、h are evaluated under the Standard for Mechanically andElectrically Operated Fuel Pumps for Marine Use, UL 1130.d) Pumps for use in chemical, petrochemical, or petroleum processing plants; utility powerplants; petroleum production facilities; pipeline pump stations; pipeline or marine terminals; orb
24、ulk plant distribution and related facilities.e) Pumps used in mobile applications, such as on tank trucks, portable tanks, or portablecontainers mounted on vehicles.f) Pumps rated more than 600 volts.g) Pump assemblies also provided with a flammable liquid meter or electrically-operatedshutoff valv
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT79B2012OUTLINEOFINVESTIGATIONFORPOWEROPERATEDPUMPSFORDIESELFUELBIODIESELFUELDIESELBIODIESELBLENDSWITHNOMINALBIODIESELCONCENTRATIONSUPTO20PERCENTPDF

链接地址:http://www.mydoc123.com/p-1069500.html