SSPC QP 8-2003 Standard Procedure for Evaluating the Qualifications of Contracting Firms That Install Polymer Coatings and Surfacings on Concrete and Other Cementitious Substrates《.pdf
《SSPC QP 8-2003 Standard Procedure for Evaluating the Qualifications of Contracting Firms That Install Polymer Coatings and Surfacings on Concrete and Other Cementitious Substrates《.pdf》由会员分享,可在线阅读,更多相关《SSPC QP 8-2003 Standard Procedure for Evaluating the Qualifications of Contracting Firms That Install Polymer Coatings and Surfacings on Concrete and Other Cementitious Substrates《.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、SSPC-QP 8July 1, 2003SSPC: The Society for Protective CoatingsQualification Procedure No. 8Standard Procedure for Evaluatingthe Qualifications of Contracting FirmsThat Install Polymer Coatings and Surfacingson Concrete and Other Cementitious Substrates11. Scope1.1 This procedure describes a method f
2、or evaluatingthe qualifications of a contractor who installs polymer coat-ings or surfacings on concrete and other cementitioussurfaces, and defines a minimum standard for qualification.Examples of other cementitious surfaces are: Horizontal traffic-bearing concrete Non-traffic bearing concrete Ceme
3、nt masonry unit (CMU) construction Parged and cement plastered surfaces, includingstuccoPreviously painted cementitious surfaces1.2 The objective of this procedure is to determine if apolymer coating or surfacing contractor has the managementprocedures; technical knowledge; quality control procedure
4、s;personnel qualifications; and safety, health and environmentalcompliance programs to properly perform substrate evalua-tion, repair, and treatment; surface preparation; and installa-tion of coatings and surfacings over concrete-based substrateswhile meeting the conditions and restrictions specifie
5、d by theowner.1.3 The procedure encompasses assessment of knowl-edge to perform polymer coating or surfacing installation onconcrete or cementitious substrates in commercial, institu-tional, and industrial facilities and structures.1.4 Meeting the requirements of this procedure doesnot guarantee the
6、 performance of applied materials, indi-vidual workers, or individual companies.2. Description2.1 DEFINITIONSContractor: An individual or firm who provides surface prepa-ration and concrete coating or surfacing installation services inthe industrial, institutional, and commercial markets.Auditor: 1)
7、 The person or persons who perform audits onbehalf of the auditing agency or qualifying agency. 2) Thebody possessing the necessary technical competence toreview contractor submittals, conduct on-site audits of appli-cants, and report results to the qualifying agency in compli-ance with the requirem
8、ents of this procedure and the writtenrequirements of the formal audit program.Qualifying Agency: The body responsible for development,maintenance, sponsorship, and operation of a program toensure uniform compliance with the provisions of this stan-dard procedure.Qualification: The procedure by whic
9、h written assurance isgiven that an applicant conforms to the prescribed set ofconditions or requirements of this standard procedure.Procedure: The sequence of steps taken to carry out aparticular course of action.Surfacing: A resinous floor coating with a film thicknessgreater than 20 mils (500 m).
10、 Thick film (greater than 20mils 500 m) systems, self-leveling systems, slurry sys-tems, broadcast systems, mortar systems, fabric-reinforcedSSPC-QP 8July 1, 20032systems, spray-applied systems, non-waterproofing mem-branes, and underlayment membranes are all consideredsurfacings.Planarity: The gene
11、ral evenness of a substrate in an in-tended dimension. Planarity must not be confused withlevelness. A sloped area, for example, is “in plane,” withoutlow or high spots, but is not level.Sloping Correction: 1) An adjustment applied to a dis-tance measured on a slope to reduce it to a horizontaldista
12、nce between the vertical lines through its end points.2)The process of installing a given pitch to a surface.2.2 FUNCTIONS TO BE EVALUATED: The procedureidentifies five function areas to be evaluated:Management procedures, Technical knowledge, Quality control procedures, Personnel qualifications, an
13、d Safety, health, and environmental compliance pro-grams, including proper handling and disposal ofhazardous waste.General requirements for each of these function areas arepresented in Section 4.2.3 EVALUATION PLANNING: The qualifying agencymust develop criteria and rating plans to evaluate eachcont
14、ractor against this standard, and to determine which ofthe specific critical items within the five function areas are tobe evaluated. The sequence of steps for conducting anevaluation is outlined in Section 5. All evaluations will beperformed by the auditor.3. References3.1 The latest issue, revisio
15、n, or amendment of thereferenced standards in effect at the time shall govern,unless otherwise specified.3.2 If there is a conflict between the requirements of anyof the cited reference standards and this qualification proce-dure, the requirements of this qualification procedure shallprevail.3.3 SSP
16、C STANDARDS:Guide 7 Guide for the Disposal of Lead-Contaminated Surface Preparation DebrisQP 1 Standard Procedure for EvaluatingQualifications of Painting Contractors(Field Application to Complex IndustrialStructures)QP 2 Standard Procedure for Evaluating theQualifications of Painting Contractors to
17、Remove Hazardous Paint3.4 FEDERAL SPECIFICATIONS AND STANDARDS:1Code of Federal Regulations (CFR)40 CFR 260 Hazardous Waste Management System:General40 CFR 261 Identification and Listing of HazardousWaste40 CFR 262 Standards Applicable to Generators ofHazardous Waste40 CFR 263 Standards Applicable t
18、o Transporters ofHazardous Waste40 CFR 268 Land Disposal Restrictions3.5 AMERICAN SOCIETY FOR TESTING AND MATE-RIALS (ASTM) STANDARDS:2ASTM D 6237 Standard Guide for Painting Inspectors(Concrete and Masonry Substrates)4. General Qualification Requirements4.1 MANAGEMENT PROCEDURES: The applicantmust
19、demonstrate adequate procedures for disseminatingcompany policy and for personnel, administrative, and fi-nancial management as follows:4.1.1 Contractor Policy: The contractor shall have:a. Written policies on quality, safety, health, and en-vironmental compliance; andb. Written procedures for disse
20、minating companypolicies to personnel.4.1.2 Organization and Personnel: The contractor shallhave:a. An organizational chart showing division of respon-sibility within the companyb. A list of names, titles, duties, and job descriptionsfor key personnel (executive management, techni-cal management, qu
21、ality control supervisors, safety,health, and environmental compliance manage-ment). Each job description shall state the expe-1Available from http:/www.access.gpo.gov/nara.cfr, or from local US Government Printing Offices.2ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.
22、 Available online from http:/www.astm.org.SSPC-QP 8July 1, 20033rience, licenses, certifications, and training andrefresher courses required for each position.4.1.3 Administrative and Management Procedures:The contractor shall provide:a. A brief written description of the contractors methodof financ
23、ial record keeping;b. Procedures used for contract estimating andscheduling, and for keeping track of job costs;c. Procedures used to review specifications and otherbid documents;d. Formal procedures for complying with current fed-eral, state, and local environmental, health, andsafety regulations;
24、ande. Procedures for evaluating each job function fordetermination of specialized training and/or expe-rience requirements.4.2 TECHNICAL KNOWLEDGE: The contractor shallhave adequate technical resources, suitable job conversionprocedures, and appropriate equipment to perform the work.The contractor s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SSPCQP82003STANDARDPROCEDUREFOREVALUATINGTHEQUALIFICATIONSOFCONTRACTINGFIRMSTHATINSTALLPOLYMERCOATINGSANDSURFACINGSONCONCRETEANDOTHERCEMENTITIOUSSUBSTRATESPDF

链接地址:http://www.mydoc123.com/p-1054506.html