SAE AMS 2767-2013 Uphill Quenching of Aluminum Alloy Product《铝合金产品的上坡淬火》.pdf
《SAE AMS 2767-2013 Uphill Quenching of Aluminum Alloy Product《铝合金产品的上坡淬火》.pdf》由会员分享,可在线阅读,更多相关《SAE AMS 2767-2013 Uphill Quenching of Aluminum Alloy Product《铝合金产品的上坡淬火》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、_SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising theref
2、rom, is the sole responsibility of the user.”SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions.Copyright 2013 SAE InternationalAll rights reserved. No part of this publi
3、cation may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE.TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada)Tel: +1 724-776-4970 (out
4、side USA)Fax: 724-776-0790Email: CustomerServicesae.orgSAE WEB ADDRESS: http:/www.sae.orgSAE values your input. To provide feedbackon this Technical Report, please visithttp:/www.sae.org/technical/standards/AMS2767AEROSPACE MATERIAL SPECIFICATIONAMS2767Issued 2013-12Uphill Quenching of Aluminum Allo
5、y ProductRATIONALEAMS2767 defines and standardizes a process in current use by aerospace customers to reduce internal residual stress.The products covered by this specification include aluminum wrought or cast parts or semi-finished shapes.1. SCOPEThis specification establishes engineering requireme
6、nts for the uphill quenching process. Uphill quenching immerses product in liquid nitrogen followed by exposure to a high pressure/velocity steam blast or boiling water.1.1 Application1.1.1 These processes are applicable to both wrought and cast shapes. 1.1.2 This document is applicable when called
7、out on an engineering drawing, required or permitted by a heat-treating specification or specified by a customer purchase order.1.2 ClassificationThis process is categorized by types, classes and levels as follows:Type I - Uphill quench using high velocity steam as the heating medium.Type II -Uphill
8、 quench using boiling water as the heating medium.Class 1 - Applications where uphill quench process is preceded by solution treatment and quenching (AQ).Class 2-Applications where uphill quench process is performed on material in any other condition (e.g. F,O,W,T5,T6,T7,T8.) than as specified in cl
9、ass 1.Level 1 process is controlled and qualified by a procedure developed by the processor.Level 2 process is controlled and qualified by a procedure developed by the processor and approved by the customer that may include a stress reduction test method defined by the customer.SAE INTERNATIONAL AMS
10、2767 Page 2 of 51.2.1 When no type, class or level is specified, Type I, Class1, Level 2 shall be the default condition.2. APPLICABLE DOCUMENTS2.1 SAE PublicationsAvailable from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096 0001, Tel: 877 606 7323 (inside USA and Canada) or 724 776
11、 4970 (outside USA), or www.sae.org.AMS2770 Heat Treatment of Aluminum Alloy PartsAMS2771 Heat Treatment of Aluminum Alloy CastingsAMS2772 Heat Treatment of Aluminum Alloy Raw MaterialsAMS2750 Pyrometry3. TECHNICAL REQUIREMENTS3.1 Equipment.3.1.1 Liquid nitrogen source.3.1.2 Liquid nitrogen processi
12、ng tank.3.1.3 Type I Processing:3.1.3.1 Steam Boiler3.1.3.2 Appropriate steam blast fixture designed, if needed or suitable for the individual part.3.1.4 Type 2 processing3.1.4.1 Water tank and heating apparatus 3.1.5 A digital surface temperature indicator with appropriate thermocouple.3.1.6 When r
13、equired by processing plan, refrigeration equipment with temperature control and recorder.3.2 Temperature control and measuring equipment shall meet the requirements of AMS2750, Class 2, except that temperature uniformity survey for equipment used for uphill quenching steps is not required. Temperat
14、ure uniformity survey is applicable to solution heat treatment and precipitation hardening performing in conjunction with AMS2770, AMS2771, AMS2772.3.3 Procedures3.3.1 Class 1 onlyProduct shall be solution heat treated and quenched in accordance with AMS2770, AMS2771, AMS2772 or other controlling sp
15、ecification as defined by the purchase order.3.3.2 For Class 1 product onlyUphill quenching shall either commence within 30 minutes of quenching from solution heat treatment or, if the product is held in the AQ condition after solution heat treatment, the AQ product shall be placed in a freezer with
16、in 30 minutes and maintained at a temperature equal to or lower than 0 F (-18 C) for a maximum of 7 days and uphill quench shall be performed within 30 minutes after removal from the freezerSAE INTERNATIONAL AMS2767 Page 3 of 53.3.3 All Types / Classes / LevelsCool the product in liquid nitrogen. Pr
17、oduct shall be totally submerged in liquid nitrogen, allow the product thermally stabilize and should remain immersed 30 minutes after boiling around the product stops.3.3.4 Product transfer3.3.4.1 The transfer time from the liquid nitrogen bath to the heating medium should be minimized to avoid any
18、 ice buildup on the product and shall not exceed 20 seconds. Longer transfer times are acceptable if allowed with a level 2 approval.3.3.5 Heating procedures3.3.5.1 Type I ProcessingSelect the designated steam blast fixture for the part being processed. The fixture shall be capable of equally and si
19、multaneously exposing all surfaces of the part to high velocity steam.3.3.5.1.1 The steam blast fixture shall be preheated to 180F minimum. 3.3.5.1.2 The product shall have steam applied on all external surfaces and on internal surfaces as defined by the process.3.3.5.1.3 The duration of the steam a
20、pplication is dependent upon the thickness of the part, and shall be continuous until the temperature sensor reading of the part is between 180 and 220 F (82 and 104 C). Exposure to 220 F (104 C) shall be less than 60 seconds in any one cycle.3.3.5.1.4 The temperature of each part after application
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEAMS27672013UPHILLQUENCHINGOFALUMINUMALLOYPRODUCT 铝合金 产品 上坡 淬火 PDF

链接地址:http://www.mydoc123.com/p-1020744.html