NAVY UFGS-09 97 13 25-2011 MAINTENANCE REPAIR AND COATING OF TALL ANTENNA TOWERS《高天线塔的维护维修和涂层》.pdf
《NAVY UFGS-09 97 13 25-2011 MAINTENANCE REPAIR AND COATING OF TALL ANTENNA TOWERS《高天线塔的维护维修和涂层》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-09 97 13 25-2011 MAINTENANCE REPAIR AND COATING OF TALL ANTENNA TOWERS《高天线塔的维护维修和涂层》.pdf(46页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 97 13.25 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-09 97 13.25 (February 2010)UFGS-09 97 13.25 (August 2009)UFGS-09 97 13.25 (April 2006)UFGS-09910 (August 2004)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated Apri
2、l 2011*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 97 13.25MAINTENANCE, REPAIR, AND COATING OF TALL ANTENNA TOWERS05/11PART 1 GENERAL1.1 REFERENCES1.2 MODIFICATIONS TO REFERENCES1.3 DESCRIPTION OF WORK1.4 SUBMITTALS1.5 SAFETY1.6 DELIVERY, STORAGE AND HANDLING1.6.1 Coating Materials1.6.
3、2 Structural and Miscellaneous Materials1.7 EXISTING TOWER CONDITIONS1.8 COATING HAZARDS1.9 JOB SITE REFERENCES1.10 PRE-APPLICATION MEETING1.11 QUALITY ASSURANCE1.11.1 Drawings: Steel, Stainless Steel ,Aluminum Fabrication1.11.2 Design Data: Coating System1.11.3 Certificates1.11.3.1 Work Plan1.11.3.
4、2 Qualifications of Certified Industrial Hygienist (CIH)1.11.3.3 Qualifications of Testing Laboratory for Coatings1.11.3.4 Qualifications of Testing Laboratory for Abrasive Media1.11.3.5 Qualifications of Coating Contractors1.11.3.6 Qualifications of Painting Shop1.11.3.7 Abrasive Media1.11.3.8 Coat
5、ing System Compatibility1.11.4 Test Reports1.11.4.1 Non-metallic Abrasive Media1.11.4.2 Coatings1.11.4.3 Metallic Abrasive Media1.11.4.4 Daily Inspection Checklist1.11.4.5 Recycled Metallic Abrasive MediaSECTION 09 97 13.25 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted w
6、ithout license from IHS-,-,-PART 2 PRODUCTS2.1 STEEL2.1.1 Structural and Miscellaneous Steel2.1.2 Steel Tubing and Pipe2.2 STAINLESS STEEL2.2.1 Band Clamps2.3 ALUMINUM2.3.1 Plates and Shapes2.3.2 Stranded Conductor2.4 BOLTS, NUTS, AND WASHERS2.4.1 Structural Steel2.4.1.1 Bolts2.4.1.2 Nuts2.4.1.3 Was
7、hers2.4.1.4 Load Indicator Washers2.4.2 Stainless Steel2.4.2.1 Bolts2.4.2.2 Nuts2.4.2.3 Washers2.4.3 Aluminum2.4.3.1 Bolts2.4.3.2 Nuts2.4.3.3 Washers2.5 GALVANIZING2.5.1 Galvanizing Repair Compound2.6 WELDING2.6.1 Exothermic Weld Kits2.7 COATING SYSTEM2.7.1 Sealer for Thermal Spray Metallizing2.7.2
8、Zinc Rich Epoxy Primer Coat2.7.3 Epoxy Intermediate Coat2.7.4 Polyurethane Topcoat2.8 SOLUBLE SALTS TEST KITS2.8.1 Test Kit for Measuring Chlorides on Steel Surfaces2.8.2 Test Kit for Measuring Chlorides in Abrasives2.9 ABRASIVE MEDIA2.9.1 Non-metallic Abrasive Media2.9.2 Metallic Abrasive Media2.9.
9、2.1 New and Remanufactured Metallic Abrasive Media2.9.2.2 Recycled Metallic Abrasive MediaPART 3 EXECUTION3.1 STRUCTURAL REPAIRS MODIFICATIONS3.1.1 Fabrication3.1.1.1 Measurements3.1.1.2 Metal Surfaces3.1.1.3 Construction3.1.1.4 Fastening3.1.1.5 Shop Fabrication3.1.2 Galvanizing3.1.3 Welding3.1.3.1
10、Exothermic Welding3.1.4 Connections3.1.4.1 Bolts3.1.4.2 Stainless Steel Fasteners3.1.4.3 Installation of Load Indicator Washers (LIW)3.2 COATING SAMPLING AND FIELD TESTINGSECTION 09 97 13.25 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.1
11、 Coating Sample Collection3.2.2 Coating Sample Testing3.3 SURFACES TO BE COATED3.3.1 Protection of Items not to be Painted3.4 ACCEPTABLE INSTALLERS3.5 LIGHTING3.6 CONTAINMENT SYSTEM3.6.1 Containment System Plans3.7 Removal of Coatings Containing Hazardous Materials3.8 SURFACE PREPARATION3.8.1 Abrasi
12、ve Blasting Equipment3.8.2 Abrasives for Soluble Salts Contamination3.8.2.1 Pre-Preparation Testing of Abrasive Media Shipped in Bulk Containers3.8.2.2 Abrasive Media Shipped in Bags (Nominal 50-110 lb.)3.8.2.3 Operational Testing of Recycled Metallic Abrasive Media3.8.3 Clean and Repair3.8.4 Surfac
13、e Standard3.8.5 Pre-Preparation Testing for Surface Contamination3.8.5.1 Pre-Preparation Testing for Oil and Grease Contamination3.8.5.2 Pre-Preparation Testing for Soluble Salts Contamination3.8.6 Abrasive Blasting3.8.7 Disposal of Used Abrasive3.8.8 Pre-Application Testing For Surface Contaminatio
14、n3.8.8.1 Pre-Application Testing for Oil and Grease Contamination3.8.8.2 Pre-Application Testing for Soluble Salts Contamination3.8.8.3 Pre-Application Testing for Surface Cleanliness3.9 MIXING AND APPLICATION OF COATING SYSTEM3.9.1 Preparation of Coating Materials for Application3.9.1.1 Mixing Seal
15、er, Primer, Intermediate, and Topcoat Materials3.9.1.2 Pot Life3.9.1.3 Application Conditions and Recoat Windows3.9.2 Application of Coating System3.9.2.1 Sealer Coat for Spray Metalizing3.9.2.2 Application of Primer3.9.2.3 Application of Stripe Coat3.9.2.4 Application of Intermediate Coat3.9.2.5 Ap
16、plication of Topcoat3.9.2.6 Procedure for Making Spot Repairs3.10 FIELD TESTS AND INSPECTION3.10.1 NACE Coating Inspector3.10.2 Field Inspection3.10.2.1 Thickness Testing3.10.3 Hold Points for Quality Control Inspections3.11 ELECTRICAL WORK3.11.1 Terminating Aluminum Stranded Conductors3.12 FINAL CL
17、EANUP- End of Section Table of Contents -SECTION 09 97 13.25 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 97 13.25 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-09 97 13.25 (February 2010)UFGS-
18、09 97 13.25 (August 2009)UFGS-09 97 13.25 (April 2006)UFGS-09910 (August 2004)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 09 97 13.25MAINTENANCE, REPAIR, AND COATING OF TALL ANTENNA TOWERS05/11*NOTE: This guide specification covers the requir
19、ements for coating of new, and repairs to existing, steel towers.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirement
20、s by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specific
21、ation are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Due to the complexity of coating design for maintenance coating, this document is more of a compendium of “potential“ requirements rather than a guide specification, and it should be edited for use only by personnel
22、that are competent in coating design. For maintenance coating design, there is significant information that must be collected, tested, and evaluated to provide a satisfactory design. The scope of this information, particularly a coating condition survey (CCS), is discussed herein. Work covered by th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS099713252011MAINTENANCEREPAIRANDCOATINGOFTALLANTENNATOWERS 天线 维护 维修 涂层 PDF

链接地址:http://www.mydoc123.com/p-984767.html