NAVY MIL-STD-1320-210-1982 TRUCKLOADING WALLEYE I GUIDED WEAPON IN SHIPPING& STORAGE CONTAINER CNU-356 E《制导武器在海运和储存CNU-356 E箱的装车》.pdf
《NAVY MIL-STD-1320-210-1982 TRUCKLOADING WALLEYE I GUIDED WEAPON IN SHIPPING& STORAGE CONTAINER CNU-356 E《制导武器在海运和储存CNU-356 E箱的装车》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-STD-1320-210-1982 TRUCKLOADING WALLEYE I GUIDED WEAPON IN SHIPPING& STORAGE CONTAINER CNU-356 E《制导武器在海运和储存CNU-356 E箱的装车》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、8. AUTHORIZED AND RELEASED c I ,. i a MIL-STD-1320 -210 81 U 7777711 O070777 O M . s- 37-03 MILITARY STANDARD MIL-STD-1320-210 (NAVY) TRUCKLOADING 8 OCTOBER 1982 WALLEYE I GUIDED WEAPON IN SHIPPING AND STORAGE CONTAINER CNU-356/E Provided by IHSNot for ResaleNo reproduction or networking permitted w
2、ithout license from IHS-,-,-MIL-STD-1320 -210 1 m 7777711 0070778 2 m MIL-STD-13 20-210 (NAVY) GENERAL NOTES 1. THIS DOCUMENT GIVES DETAILED INSTRUCTIONS FOR TRUCKLOADING ;HE WALLEYE GUIDED WEAPON IN CONTAINER, SHIPPING 2. AND STORAGE CNU-356/E. THE PROCEDURES AND PRACTICES DESCRIBED HEREIN ARE INTE
3、NDED FOR 40 FT FLATBED TRAILERS OR 40 FT VAN TRAILERS. THE TRAILER AXLES SHALL BE LOCATED IN THE WESTERN POSITION (AT THE EXTREME REAR OF THE TRAILER). DO NOT USE TRAILERS WITH NON- NAILABLE FLOORS. EACH STACK OF CONTAINERS TWO OR MORE HIGH IS SECURED TOGETHER WITH TWO 1 1/4 X ,035 CROSS STRAPS. THE
4、SE STRAPS PASS THROUGH THE FORK POCKETS OF THE TOP CONTAINERS AND RETURN THROUGH THE FORK POCKETS OF THE CONTAINERS IMMEDIATELY BELOW THE TOP CONTAINER, ONLY CHAINS AND LOAD BINDERS SHALL BE USED FOR TIEDOWNS. (STEEL STRAPS ARE NOT AUTHORIZED). CHAINS, FITTINGS AND LOAD BINDERS SHALL MEET THE REQUIR
5、EMENTS OF THE GENERAL TRUCKLOADING DOCUMENT MIL-STD-13M AND BE APPLIED AS SHOWN IN THIS DOCUMENT, PAGES 3, 5 AND 7. 3. 4. pq CHAINS PASS UNDER CONTAINER POD THROUGH THE STACK FROM ONE SIDE OF THE TRAILER TO THE OTHER. i i 5. PRIOR TO LOADING THE TRAILER AND DURING THE PRELOADING INSPECTION REQUIRED
6、BY NAVWEPS OP 2165 AND REPORTED ON DD FORM 626, THE CHAINS, FITTINGS AND LOAD BINDERS SHALL BE INSPECTED FOR STRETCH, GOUGING, BENT LINKS, WEAR AND ANY OTHER NOTICEABLE DEFECTS. THE INSPECTOR SHALL CONFIRM THAT THE CHAINS AND LOAD BINDERS HAVE BEEN INSPECTED AND SHALL SO NOTE IN ITEM NO. 22 OF DD FO
7、RM 626, ANY DEFICIENCY SHALCBE CAUSE FOR REJECTION OF A CHAIN OR LOAD BINDER. THE MAXIMUM GROSS WEIGHT OF THE TRACTOR-TRAILER AND THE ALLOWABLE AXLE WEIGHTS ARE THE RESPONSIBILITY OF THE CARRIER. THE CARRIER WILL ADVISE THE SHIPPER OF THESE LIMITATIONS AND THE SHIPPER SHALL LOAD THE TRAILER IN SUCH
8、A MANNER THAT THE TRACTOR-TRAILER WILL NOT EXCEED THESE LIMITATIONS. AFTER BLOCKING AND BRACING HAS BEEN INSPECTED, ATTACH SHIPPING DOCUMENTS TO AN ACCESSIBLE AREA AND ATTACH “EXPLOSIVES A“ PLACARD TO BOTH SIDES, FRONT AND BACK OF TRAILER. 6. 7. 8. 9. UNLESS OTHERWISE SPECIFIED MATERIALS SHALL BE IN
9、 ACCORDANCE WITH THE GENERAL TRUCKLOADING DOCUMENT, MIL-STD-1320. FOR GENERAL TRUCKLOADING PROCEDURES REFER TO THE GENERAL TRUCKLOADING DOCUMENT MIL-STD-1320. FTL 40 FT TRAILER (FLATBED) 2ND PIECE TO 1ST IN LIKE MANNER. /A DETAIL 0 END BLOCKING (4 REQUIRED) PAGE 2 : L a Provided by IHSNot for Resale
10、No reproduction or networking permitted without license from IHS-,-,-MIL-STD-1320 -210 1 W 7777711 0070777 4 W 5 a . - . ”. 72 1 M IL-STD-13 20-21 O (NAVY) DETAIL 0 SEPARATOR ASSEMBLY (4 REQUIRED) ARROWS INDICATE NO END OF CONTAINERS 2 X 6 DOUBLED. NAIL 1ST PIECE TO TRAILER FLOOR W/l-lM NAIL EVERY 8
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILSTD13202101982TRUCKLOADINGWALLEYEIGUIDEDWEAPONINSHIPPINGSTORAGECONTAINERCNU356E 制导 武器 海运 储存 CNU356E

链接地址:http://www.mydoc123.com/p-981919.html