NAVY MIL-F-5504 B (3)-1982 FILTERS AND FILTER ELEMENTS FLUID PRESSURE HYDRAULIC MICRONIC TYPE《液压式微米型流体压力过滤器和过滤元件》.pdf
《NAVY MIL-F-5504 B (3)-1982 FILTERS AND FILTER ELEMENTS FLUID PRESSURE HYDRAULIC MICRONIC TYPE《液压式微米型流体压力过滤器和过滤元件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-F-5504 B (3)-1982 FILTERS AND FILTER ELEMENTS FLUID PRESSURE HYDRAULIC MICRONIC TYPE《液压式微米型流体压力过滤器和过滤元件》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、. .eMIL-F-5504BAMENIN4F.NT3Il“ 23 February 1982. NbAMENDMENT 23 APRIL 1969MILITARY SPECIFICATION.,rFILTERSAND FILTER ELEMENTS, FLUID PRESSURE,HYDFWJLIC MICRONIC TYPEThis amendment forms a part of Military specificationMIL-F-5504B, dated 17 October 1958, and is approvedfor use by all Departments and
2、Agencies of theDepartment of Defense.Page 2, paragraph 2.1:(a) Under Military Specification delete reference to Specification141L-D-5028and add the following: “ML-D-1OOO Drawings, EngineeringandAssociated Lists.”(b) Under Military Specificationsdelete reference to SpecificationMIL-P-5514 and add the
3、 following: “MIL-G-5514 Gland Design; Packings,Hydraulic, General Requirements for.”(c) Under Military Standards add the followin8: “MIL-STD-143Specificationsand Standards, Order of Precedence for the Selectionof.”1,Page 3:I(a) Paragraph 2.1: Delete “Publications”and reference to AirForc*Navy Aerona
4、utical Bulletin No. 143.(b) Paragraph 3.2,4, seventh a71nd eighth lines: Delete “ANA BulletinNo. 143” and substitute “StandardMIL-STD-143.”Page 4, paragraph 3.3.9, third and fourth lines: Delete L-p-5514 andsubstitute “MIL-G-5514.*Page 5, paragraph 3.4, eighth line: Delete L-*5028 d sstituteWna-looo
5、.”Pege 6:(a) Add the followingnew paragraphunder section 4:IFSC 1650.lofsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-5504BAMENDMENT 3*“4.01 Responsibility for inspection. Unless othemrise specified Inthe contract or purchase order, the cont
6、ractor is responsible for theperformance of all inspection requirements a71s specified herein. Except asothend.se specified in the contract or purchaseorder, the contractor mayuse his own or any other facilities suitable for the performanceof theinspection requirements specified herein, unless disap
7、provedby theGovernment. Tne Government reserv= the right to perform any of theinspections set forth in the specification where such Inspections aredeemed necessary to assure supplies and seices conform to prescribedrequiresaents.“(b) Paragraph 4.1: Delete the following:“(b) Acceptance tests: Accepta
8、nce tests are those tests performedonindividual lots which have been submitted for acceptance.”a71nd substitute:“(b) Quality conformance inspection: Qualityconsists of those tests performed on individuallotssubmitted for acceptance.”Page 7:conformanceinspectionwhtch have been(a) Paragaph 4.3: Delete
9、, and substitute the following:.“4.3 Quality conformance inspection. Ihe quality conformanceinspectionshall consist of individual tests.” -)(b) paragraph 4.3.1.1: Md the following:“(c) Relief-valve operation54.5.”).”(c) Paragraph 4.3.1.2(b): After bubble test add “line and resenoirfilter elements.”(
10、d) Paragraph4.3.2: Delete the entire paragraph.Pages 7 and 8, paragraph 4.4.2: Delete, and cubstltute:“4.4.2 Temperature. Unless otherwisespe ified, the tests shallbe conductedwith the oil at a tam a71ratur8 g of 90 to 100 F a71nd Solox 190, orequivalent, at a temperature of 65 to 75 F. The temperat
11、ureof the fluidsduring each test specified herein shall be noted in the test report.”Page 9, figure 1:(a) Delete “FLUID CONFORMING TO SPECIFICATIONMIL-H-5606and substitute“SOLOX 190 OR EQUIVALENT.”(b) Delete “SOLAX” and substitute “SOLOX 190 OR EQUIVALE?TI.”Provided by IHSNot for ResaleNo reproducti
12、on or networking permitted without license from IHS-,-,-MIL-F-5504BNmmQNT3Page 10, paragraph 4.5.7 a71nd 4.S.7.1: Dalete,“4.5.7 Relief-valve operation.“4.5.7.1 Line-type filter.and subatftute the following:“4.5.7.1.1 Qualification. To test line-type filters for relief valveoperation,an effectivemean
13、s for stopping flow through the filteringelementshall be provided. By means of a power-drivenpump, pressureshall beapplied to the inlet port of the filter, beginning with a pressure of 45psi and increasing in increments of 5 psi or less until cracking pressureof the relief valve in the filter being
14、tested is reached. At each incrementthe pressureshall be maintained constant for 5 minutes. At each pressureincrement, time shall not be considered inor leakagenoted until thebeginning of the third minute. The letie rate, ss noted during the last3 minutes of each pressure increment, shall be recorde
15、d. The pressure atwhich the leakage rate through the valve amounts to 4.0 cc (approximately80drops) per minute shall be considered as cracking pressure. Cracking pressurefor line filters shall occur at SO 5 psi. Leakage up to 40 psi shallnot exceed 2.0 cc (approxftely 40 drops) Fer minute, Pressure
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILF5504B31982FILTERSANDFILTERELEMENTSFLUIDPRESSUREHYDRAULICMICRONICTYPE 液压式 微米 流体 压力 过滤器 过滤 元件 PDF

链接地址:http://www.mydoc123.com/p-979183.html