GME 01118-2012 Test of Grab Handle Coat Hook (Revision 3 English German Includes Appendix A - D This standard may be applied only for current projects It is Superceded for all fut.pdf
《GME 01118-2012 Test of Grab Handle Coat Hook (Revision 3 English German Includes Appendix A - D This standard may be applied only for current projects It is Superceded for all fut.pdf》由会员分享,可在线阅读,更多相关《GME 01118-2012 Test of Grab Handle Coat Hook (Revision 3 English German Includes Appendix A - D This standard may be applied only for current projects It is Superceded for all fut.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、GeneralSpecification SUPERCEDEDGME 01118Test of Grab Handle / Coat Hook berprfung Haltegriff Dach /Prfung KleiderhakenNote: This standard may be applied only forcurrent projects. It is Superceded for all futureprojects and replaced by GMW16792.Hinweis: Diese Spezifikation darf nur noch frlaufende Pr
2、ojekte angewendet werden und istfr alle zuknftigen Projekte ungltig und ersetztdurch GMW16792.1 Introduction 1 Einfhrung1.1 Scope. Valid for all grab handles. 1.1 Anwendungsbereich. Gilt fr alle Haltegriffe.1.2 Mission / Theme. Testing of grab handlesaccording to various performance criteria.1.2 Auf
3、gabe / Thema. berprfung der Haltegriffenach verschiedenen Leistungskriterien.This specification determines the test conditions andthe requirements for the testing of the grab handles invarious versions, as well as those of the coat hookswhich may be integral with or separate from the grabhandle.Dies
4、e Spezifikation legt die Prfbedingungen und dieAnforderungen fr die berprfung der Haltegriffeverschiedener Ausfhrungen, sowie des Kleiderha-kens, der integriert oder separat vom Haltegriff seinkann, fest.1.3 Classification. 1.3 Einteilung.grab handle without coat hook Haltegriff ohne Kleiderhakengra
5、b handle with coat hook Haltegriff mit Kleiderhakengrab handle with return retardation Haltegriff mit Rckstellverzgerungseparate coat hook Kleiderhaken separatNote: Nothing in the specification supersedes appli-cable laws and regulations.Hinweis: Die Vorschrift darf keine anzuwendendenGesetze und Re
6、gelungen auer Kraft setzen.Note: In the event of a conflict between the Germanand theEnglish language,the German languageshalltake precedence.Hinweis: Im Falle von Unstimmigkeiten zwischendem deutschen und dem englischen Text ist derdeutsche Text ausschlaggebend.2 References 2 ReferenzenNote: Only t
7、he latest approved standards are appli-cable unless otherwise specified.Hinweis: Wenn nicht anders angegeben, ist jeweilsdie neueste Fassung der angegebenenReferenz gl-tig.2.1 External Standards/Specifications. None. 2.1 Externe Normen/Vorschriften. Keine. Copyright 2012 General Motors Company All R
8、ights ReservedPublication Department: GME Specification CenterMay 2012 Page 1 of 18PRD045 - VPRE ST 1 10/03 SUPERCEDED GME 01118 GM EUROPE ENGINEERING STANDARDS2.2 GM Standards/Specifications. 2.2 GM Normen/Vorschriften.GME 60292 GMN7000 GMW32323 Test Preparation and Evaluation 3 Prfungsvorbereitung
9、 undAuswertung3.1 Resources. 3.1 Gerte und Einrichtungen.3.1.1 Calibration. The test facilities and equipmentshall be in good working order and shall have a validcalibration label.3.1.1 Kalibrierung. Alle Prfungseinrichtungen und-ausrstungen mssen funktionsfhig sein und einegltige Kalibrierplakette
10、haben.3.1.2 Alternatives. Alternative test facilities andequipment may also be used. However, all measur-ing variables as specified in this specification shallbe determined correctly with respect to its physicaldefinition.3.1.2 Alternativen. EsknnenauchalternativePrf-einrichtungen und -ausrstungen v
11、erwendet werden.Alle Messvariablen, wie sie in dieser Vorschrift ange-geben werden, mssen jedoch in Bezug auf ihre phy-sikalische Definition korrekt festgelegt werden.3.1.3 Facilities. 3.1.3 Einrichtungen.3.1.3.1 Dudenhofen test center (torture track left,Belgian block wave road, Rheinstrae) or equi
12、valentproving ground.3.1.3.1 Testzentrum Dudenhofen (Marterstreckelinks, Groblockwellenbahn, Rheinstrae) oder qui-valentes Prffeld.3.1.3.2 Motorway, federal road, cobblestones. 3.1.3.2 Bundesautobahn, Bundesstrae, Kopfstein-pflaster.3.1.3.3 Climatic chamber. 3.1.3.3 Klimakammer.3.1.3.4 Durability te
13、st stand. 3.1.3.4 Dauerprfstand.3.1.4 Equipment. 3.1.4 Ausrstung.3.1.4.1 Tensile/compression gauge (measuringrange (0.100) N and (0.1000) N) with piston (diam-eter: 20 mm), hook and spacer.3.1.4.1 Zug-/Druckwaage (Messbereich (0.100) Nund (0.1000) N) mit Stempel (Durchmesser 20 mm),Haken und Abstand
14、halter.3.1.4.2 Caliper gauge. 3.1.4.2 Messschieber.3.1.4.3 Clinometer. 3.1.4.3 Clinometer.3.1.4.4 Contact less device for measurement ofopening time.3.1.4.4 Vorrichtung zur berhrungslosen Messungder ffnungszeit.3.2 Test Samples. Grab handles in installed condi-tion.3.2 Prfteile. Haltegriffe im einge
15、bauten Zustand.3.3 Conditioning. Not applicable. 3.3 Probenvorbehandlung. Nicht anwendbar. Copyright 2012 General Motors Company All Rights ReservedPage 2 of 18 May 2012PRD045 - VPRE ST G 10/03GM EUROPE ENGINEERING STANDARDS SUPERCEDED GME 011183.4 Documentation. Samples of componentsor material rel
16、eased to this specification shall betested for conformity with the requirements of thisspecification and approved by the responsible GMDepartment prior to the start of delivery of productionlevel components or materials.3.4 Dokumentation. Freigabemuster fr die dieseVorschrift zutrifft, mssen nach di
17、eser Vorschriftgeprft werden und von der verantwortlichen GMAbteilung genehmigt sein, ehe eine Lieferung erfol-gen kann.Anychange tothe componentor materiale.g. design,function, properties, manufacturing process and/orlocation of manufacture requires a new releaseof the product. It is the sole respo
18、nsibility of thesupplier to provide the customer, unsolicited, withdocumentation of any change or modification to theproduct/process, and to apply for a new release.nderungen von z.B. Aufbau, Funktion, Eigen-schaften, Herstellungsprozess und Ort macheneine Neufreigabe notwendig. Der Hersteller istve
19、rpflichtet, unaufgefordert den Abnehmer mit einerDokumentation ber alle Abstimmungen, Modifikatio-nen von Teilen und / oder Prozessen zu informierenund eine Neufreigabe zu beantragen.If not otherwise agreed to the entire verification testshall be repeated and documented by the supplierprior to start
20、 of delivery of the modified or changedproduct. In some cases a shorter test can be agreedto between the responsible GM Department and thesupplier.Wenn nicht anders vereinbart, ist die komplette Frei-gabeprfung durch den Lieferanten zu wiederholenund das Ergebnis zu dokumentieren, bevor die nde-rung
21、en in der Lieferung einsetzen knnen. In Einzel-fllen kann zwischen der verantwortlichen GM Abtei-lung und Lieferant eine verkrzte Prfung vereinbartwerden.3.4.1 Test Results. Variables shall be provided forvalues which are not explicitly listed. The values aredefined in Appendix D. Deviations from th
22、ese valuesshallbeenteredinthedrawingundertherelevantvari-ables.3.4.1 Prfergebnisse. Werte, die nicht explizit auf-gefhrtsind, werden mit Variablen versehen. Sie sindunter den entsprechenden Variablen Anhang D zuentnehmen. Abweichungen von diesen Vorgabewer-ten werden in der Zeichnung angegeben.Subje
23、ctive evaluation shallbe performed accordingtoGMN7000.Die subjektive Beurteilung erfolgt nach GMN7000.The results shall be entered in the relevant datasheets (Appendices B and C).DieErgebnissesindindieentsprechendenDatenblt-ter (Anhang B und C) einzutragen.3.4.2 Deviations from Test Procedure. Devia
24、tionsfrom the requirements of the test procedures shallhave been agreed upon. Such requirements shall bespecified on component drawings, test certificates,reports etc.3.4.2 Abweichungen bei der Versuchsdurchfh-rung. Abweichungen von den Bedingungen derVersuchsdurchfhrungen mssen vereinbart wer-den.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME011182012TESTOFGRABHANDLECOATHOOKREVISION3ENGLISHGERMANINCLUDESAPPENDIXADTHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROJECTSITISSUPERCEDEDFORALLFUTPDF

链接地址:http://www.mydoc123.com/p-754811.html