ETSI TR 124 930-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Signalling flows for the session setup in thea.pdf
《ETSI TR 124 930-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Signalling flows for the session setup in thea.pdf》由会员分享,可在线阅读,更多相关《ETSI TR 124 930-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Signalling flows for the session setup in thea.pdf(160页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TR 124 930 V15.0.0 (2018-06) Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Signalling flows for the session setup in the IP Multimedia core network Subsystem (IMS) based on Session Initiation Protocol (SIP) and Session Desc
2、ription Protocol (SDP); Stage 3 (3GPP TR 24.930 version 15.0.0 Release 15) TECHNICAL REPORT ETSI ETSI TR 124 930 V15.0.0 (2018-06)13GPP TR 24.930 version 15.0.0 Release 15Reference RTR/TSGC-0124930vf00 Keywords GSM,LTE,UMTS ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +3
3、3 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available
4、 in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prev
5、ailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETS
6、I documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the present document, please send your comment to one of the following services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized
7、 in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to repro
8、duction in all media. ETSI 2018. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GPPTM and LTETMare trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo i
9、s protected for the benefit of its Members. GSMand the GSM logo are trademarks registered and owned by the GSM Association. ETSI ETSI TR 124 930 V15.0.0 (2018-06)23GPP TR 24.930 version 15.0.0 Release 15Intellectual Property Rights Essential patents IPRs essential or potentially essential to normati
10、ve deliverables may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
11、 respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existenc
12、e of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Trademarks The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners. ETSI claims
13、 no ownership of these except for any which are indicated as being the property of ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does not constitute an endorsement by ETSI of products, services or organizations asso
14、ciated with those trademarks. Foreword This Technical Report (TR) has been produced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or GSM identities. These should be interpreted as
15、being references to the corresponding ETSI deliverables. The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp. Modal verbs terminology In the present document “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ an
16、d “cannot“ are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TR 124 930 V15.0.0 (2018-06)33GPP TR 24.930 version 15.0.0
17、 Release 15Contents Intellectual Property Rights 2g3Foreword . 2g3Modal verbs terminology 2g3Foreword . 4g31 Scope 5g32 References 5g33 Definitions, symbols and abbreviations . 5g33.1 Definitions 5g33.2 Symbols 5g33.3 Abbreviations . 6g34 Methodology 6g34.1 General . 6g34.2 Key required to interpret
18、 signalling flows 6g35 Signalling flows for session initiation 7g35.1 Establishing a session when UE#1 and UE#2 do not have required resources available . 7g35.1.1 Introduction. 7g35.1.2 UE initiated IP-CAN bearer setup 7g35.1.2.1 Introduction . 7g35.1.2.2 SDP capability negotiation not supported by
19、 UE#1 7g35.1.2.3 SDP capability negotiation supported by UE#1 and UE#2 . 21g35.1.2.4 SDP capability negotiation only supported by UE#1 35g35.1.3 Network initiated IP-CAN bearer setup 49g35.2 Establishing a session when UE#1 does not have required resources available while UE#2 has resources already
20、available . 63g35.2.1 Introduction. 63g35.2.2 Signalling flow with UPDATE request 64g35.2.3 Signalling flow without UPDATE request . 77g35.3 Establishing a session when UE#1 has resources available while UE#2 does not have required resources available . 89g35.3.1 Introduction. 89g35.3.2 Signalling F
21、low (with SDP answer in 200 (OK) response for INVITE request) . 89g35.3.3 Signalling Flow (with SDP answer in reliable 180 Ringing) response . 95g35.3.4 Signalling Flow with SDP answer in reliable 183 Session Progress response for INVITE request when the IP-CAN performs resource reservation for UE#2
22、 . 103g35.4 Establishing a session when UE#1 does not have required resources available and UE#2 is non-IMS . 112g35.4.1 Introduction. 112g35.4.2 Signalling Flow . 112g35.4.3 Signalling flow (preconditions used, SDP capability negotiation not supported by UE#1, 2nd SDP offer offering AVP transport f
23、or video) 117g35.4.4 Signalling Flow (preconditions not supported by SIP UA#2, SDP capability negotiation not supported by UE#1, 2nd SDP offer offering AVP transport for video) 133g35.5 Establishing a session when UE#1 is non-IMS and UE#2 does not have required resources available . 141g35.5.1 Intro
24、duction. 141g35.5.2 Signalling Flow . 141g35.6 Establishing a session when UE#1 and UE#2 have resources already available 145g35.6.1 Introduction. 145g35.6.2 Signalling Flow (preconditions are not used) . 145g35.6.3 Signalling Flow (preconditions are used) . 149g3Annex A (informative): Change histor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITR1249302018DIGITALCELLULARTELECOMMUNICATIONSSYSTEMPHASE2GSMUNIVERSALMOBILETELECOMMUNICATIONSSYSTEMUMTSLTESIGNALLINGFLOWSFORTHESESSIONSETUPINTHEAPDF

链接地址:http://www.mydoc123.com/p-736723.html