EN 12350-1-2009 en Testing fresh concrete - Part 1 Sampling《新拌混凝土的测试 第1部分 采样》.pdf
《EN 12350-1-2009 en Testing fresh concrete - Part 1 Sampling《新拌混凝土的测试 第1部分 采样》.pdf》由会员分享,可在线阅读,更多相关《EN 12350-1-2009 en Testing fresh concrete - Part 1 Sampling《新拌混凝土的测试 第1部分 采样》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、BS EN12350-1:2009ICS 91.100.30NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBRITISH STANDARDTesting fresh concretePart 1: SamplingThis British Standardwas published under theauthority of the StandardsPolicy and StrategyCommittee on 31 August2009 BSI 2009ISBN 978 0 580 58788 7
2、Amendments/corrigenda issued since publicationDate CommentsBS EN 12350-1:2009National forewordThis British Standard is the UK implementation of EN 12350-1:2009. Itsupersedes BS EN 12350-1:2000 which is withdrawn.The UK participation in its preparation was entrusted to TechnicalCommittee B/517/1, Con
3、crete production and testing.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisionsof a contract. Users are responsible for its correct application.Compliance with a British Standard c
4、annot confer immunityfrom legal obligations.BS EN 12350-1:2009EUROPEAN STANDARDNORME EUROPENNEEUROPISCHE NORMEN 12350-1March 2009ICS 91.100.30 Supersedes EN 12350-1:1999 English VersionTesting fresh concrete - Part 1: SamplingEssais pour bton frais - Partie 1: Prlvement Prfung von Frischbeton - Teil
5、 1: ProbenahmeThis European Standard was approved by CEN on 20 January 2009.CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this EuropeanStandard the status of a national standard without any alteration. Up-to-date lists and bibliog
6、raphical references concerning such nationalstandards may be obtained on application to the CEN Management Centre or to any CEN member.This European Standard exists in three official versions (English, French, German). A version in any other language made by translationunder the responsibility of a
7、CEN member into its own language and notified to the CEN Management Centre has the same status as theofficial versions.CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland,France, Germany, Greece, Hungary, Iceland, Ireland, It
8、aly, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal,Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.EUROPEAN COMMITTEE FOR STANDARDIZATIONCOMIT EUROPEN DE NORMALISATIONEUROPISCHES KOMITEE FR NORMUNGManagement Centre: Avenue Marnix 17, B-1000 Br
9、ussels 2009 CEN All rights of exploitation in any form and by any means reservedworldwide for CEN national Members.Ref. No. EN 12350-1:2009: EBS EN 12350-1:2009EN 12350-1:2009 (E) 2 Contents Page Foreword 3 1 Scope 52 Normative references 53 Terms and definitions .54 Apparatus .65 Sampling .66 Repor
10、t of sampling 7BS EN 12350-1:2009EN 12350-1:2009 (E) 3 Foreword This document (EN 12350-1:2009 has been prepared by Technical Committee CEN/TC 104 “Concrete and related products”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either
11、 by publication of an identical text or by endorsement, at the latest by September 2009, and conflicting national standards shall be withdrawn at the latest by September 2009. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN an
12、d/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document supersedes EN 12350-1:1999. This standard is one of a series concerned with testing concrete. This series EN 12350 includes the following parts: Part 1: Sampling; Part 2: Slump-test; Part 3: Vebe
13、test; Part 4: Degree of compactability; Part 5: Flow table test; Part 6: Density; Part 7: Air content - Pressure methods; Part 8: Self-compacting concrete - Slump-flow test (in preparation); Part 9: Self-compacting concrete - V-funnel test (in preparation); Part 10: Self-compacting concrete - L-box
14、test (in preparation); Part 11: Self-compacting concrete - Sieve segregation test (in preparation); Part 12: Self-compacting concrete - J-ring test (in preparation). CAUTION When cement is mixed with water, alkali is released. Take precautions to avoid dry cement entering the eyes, mouth and nose wh
15、ilst mixing concrete. Prevent skin contact with wet cement or concrete by wearing suitable protective clothing. If cement or concrete enters the eye, immediately wash it out thoroughly with clean water and seek medical treatment without delay. Wash wet concrete off the skin immediately. BS EN 12350-
16、1:2009EN 12350-1:2009 (E) 4 The following amendments have been made to the 1999-10 edition of this standard: editorial revision clarification on the method for obtaining a composite or spot sample of fresh concrete According to the CEN/CENELEC Internal Regulations, the national standards organizatio
17、ns of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania,
18、 Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. BS EN 12350-1:2009EN 12350-1:2009 (E) 5 1 Scope This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. NOTE The requirement for remixing the sample before tests o
19、n the fresh concrete, or before making test specimens, is included in the relevant standards. When mixing and sampling of concrete is done in a laboratory, different procedures may be required. 2 Normative references None applicable 3 Terms and definitions For the purposes of this document, the foll
20、owing terms and definitions apply. 3.1 batch quantity of fresh concrete which is: mixed in one cycle of operation of a batch mixer; discharged during 1 min from a continuous mixer; or conveyed ready-mixed in a truck mixer when the load requires more than one cycle of a batch mixer or more than one m
21、inute of operation of a continuous mixer 3.2 composite sample quantity of concrete, consisting of a number of increments distributed through a batch or mass of concrete thoroughly mixed together 3.3 spot sample quantity of concrete taken from part of a batch or mass of concrete, consisting of one or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN1235012009ENTESTINGFRESHCONCRETEPART1SAMPLING 混凝土 测试 部分 采样 PDF

链接地址:http://www.mydoc123.com/p-706174.html