1、228 23 CFR Ch. I (4111 Edition) 636.513 636.513 Are limited negotiations al-lowed prior to contract execution? (a) Yes, after the source selection but prior to contract execution, you may conduct limited negotiations with the selected design-builder to clarify any remaining issues regarding scope, s
2、chedule, financing or any other infor-mation provided by that offeror. You must comply with the provisions of 636.507 in the exchange of this infor-mation. (b) Limited negotiations conducted under this section may include nego-tiations necessary to incorporate the ideas and concepts from unsuccessfu
3、l offerors into the contract if a stipend is offered by the contracting agency and accepted by the unsuccessful offeror and if the requirements of section 636.113 are met. 67 FR 75926, Dec. 10, 2002, as amended at 73 FR 77502, Dec. 19, 2008 636.514 How may I provide notifica-tions and debriefings? Y
4、ou may provide pre-award or post- award notifications in accordance with State approved procedures. If an offer-or requests a debriefing, you may pro-vide pre-award or post-award debriefings in accordance with State approved procedures. PART 637CONSTRUCTION INSPECTION AND APPROVAL Subpart A Reserved
5、 Subpart BQuality Assurance Procedures for Construction Sec. 637.201 Purpose. 637.203 Definitions. 637.205 Policy. 637.207 Quality assurance program. 637.209 Laboratory and sampling and test-ing personnel qualifications. APPENDIX A TO SUBPART B OF PART 637 GUIDE LETTER OF CERTIFICATION BY STATE ENGI
6、NEER AUTHORITY: Sec. 1307, Pub. L. 105178, 112 Stat. 107; 23 U.S.C. 109, 114, and 315; 49 CFR 1.48(b). SOURCE: 60 FR 33717, June 29, 1995, unless otherwise noted. EDITORIAL NOTE: Nomenclature changes to part 637 appear at 67 FR 75934, Dec. 10, 2002. Subpart A Reserved Subpart BQuality Assurance Proc
7、edures for Construction 637.201 Purpose. To prescribe policies, procedures, and guidelines to assure the quality of ma-terials and construction in all Federal- aid highway projects on the National Highway System. 637.203 Definitions. Acceptance program. All factors that comprise the State transporta
8、tion de-partments (STD) determination of the quality of the product as specified in the contract requirements. These fac-tors include verification sampling, testing, and inspection and may in-clude results of quality control sam-pling and testing. Independent assurance program. Ac-tivities that are
9、an unbiased and inde-pendent evaluation of all the sampling and testing procedures used in the ac-ceptance program. Test procedures used in the acceptance program which are performed in the STDs central lab-oratory would not be covered by an independent assurance program. Proficiency samples. Homoge
10、neous samples that are distributed and tested by two or more laboratories. The test results are compared to assure that the laboratories are obtaining the same re-sults. Qualified laboratories. Laboratories that are capable as defined by appro-priate programs established by each STD. As a minimum, t
11、he qualification program shall include provisions for checking test equipment and the lab-oratory shall keep records of calibra-tion checks. Qualified sampling and testing per-sonnel. Personnel who are capable as defined by appropriate programs estab-lished by each STD. Quality assurance. All those
12、planned and systematic actions necessary to provide confidence that a product or service will satisfy given requirements for quality. Quality control. All contractor/vendor operational techniques and activities that are performed or conducted to ful-fill the contract requirements. VerDate Mar2010 09
13、:39 May 11, 2011 Jkt 223076 PO 00000 Frm 00238 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-229 Federal Highway Administration, DOT 637.207 Random sample. A sample drawn f
14、rom a lot in which each increment in the lot has an equal probability of being chosen. Vendor. A supplier of project-pro-duced material that is not the con-tractor. Verification sampling and testing. Sam-pling and testing performed to validate the quality of the product. 637.205 Policy. (a) Quality
15、assurance program. Each STD shall develop a quality assurance program which will assure that the ma-terials and workmanship incorporated into each Federal-aid highway con-struction project on the NHS are in conformity with the requirements of the approved plans and specifications, including approved
16、 changes. The pro-gram must meet the criteria in 637.207 and be approved by the FHWA. (b) STD capabilities. The STD shall maintain an adequate, qualified staff to administer its quality assurance program. The State shall also maintain a central laboratory. The States cen-tral laboratory shall meet t
17、he require-ments in 637.209(a)(2). (c) Independent assurance program. Independent assurance samples and tests or other procedures shall be per-formed by qualified sampling and test-ing personnel employed by the STD or its designated agent. (d) Verification sampling and testing. The verification samp
18、ling and testing are to be performed by qualified test-ing personnel employed by the STD or its designated agent, excluding the contractor and vendor. (e) Random samples. All samples used for quality control and verification sampling and testing shall be random samples. 637.207 Quality assurance pro
19、gram. (a) Each STDs quality assurance program shall provide for an accept-ance program and an independent as-surance (IA) program consisting of the following: (1) Acceptance program. (i) Each STDs acceptance program shall consist of the following: (A) Frequency guide schedules for verification sampl
20、ing and testing which will give general guidance to personnel responsible for the program and allow adaptation to specific project conditions and needs. (B) Identification of the specific loca-tion in the construction or production operation at which verification sam-pling and testing is to be accom
21、plished. (C) Identification of the specific at-tributes to be inspected which reflect the quality of the finished product. (ii) Quality control sampling and testing results may be used as part of the acceptance decision provided that: (A) The sampling and testing has been performed by qualified labo
22、ra-tories and qualified sampling and test-ing personnel. (B) The quality of the material has been validated by the verification sam-pling and testing. The verification test-ing shall be performed on samples that are taken independently of the quality control samples. (C) The quality control sampling
23、 and testing is evaluated by an IA program. (iii) If the results from the quality control sampling and testing are used in the acceptance program, the STD shall establish a dispute resolution sys-tem. The dispute resolution system shall address the resolution of discrep-ancies occurring between the
24、verification sampling and testing and the quality control sampling and test-ing. The dispute resolution system may be administered entirely within the STD. (iv) In the case of a design-build project on the National Highway Sys-tem, warranties may be used where ap-propriate. See 23 CFR 635.413(e) for
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART6372011CONSTRUCTIONINSPECTIONANDAPPROVALPDF

链接地址:http://www.mydoc123.com/p-701911.html