1、212 23 CFR Ch. I (4111 Edition) Pt. 636 such materials produced in such facil-ity for use in Federal-aid highway con-struction during the 12-month period ending July 1, 1987. (b) Qualified prison facility means any prison facility in which convicts, dur-ing the 12-month period ending July 1, 1987, p
2、roduced materials for use in Fed-eral-aid highway construction projects. 53 FR 1923, Jan. 25, 1988, as amended at 58 FR 38975, July 21, 1993 PART 636DESIGN-BUILD CONTRACTING Subpart AGeneral Sec. 636.101 What does this part do? 636.102 Does this part apply to me? 636.103 What are the definitions of
3、terms used in this part? 636.104 Does this part apply to all Federal- aid design-build projects? 636.105 Is the FHWA requiring the use of de-sign-build? 636.106 Reserved 636.107 May contracting agencies use geo-graphic preference in Federal-aid design- build or public-private partnership projects? 6
4、36.108 Reserved 636.109 How does the NEPA process relate to the design-build procurement process? 636.110 What procedures may be used for so-licitations and receipt of proposals? 636.111 Can oral presentations be used dur-ing the procurement process? 636.112 May stipends be used? 636.113 Is the stip
5、end amount eligible for Federal participation? 636.114 What factors should be considered in risk allocation? 636.115 May I meet with industry to gather information concerning the appropriate risk allocation strategies? 636.116 What organizational conflict of in-terest requirements apply to design-bu
6、ild projects? 636.117 What conflict of interest standards apply to individuals who serve as selec-tion team members for the owner? 636.118 Is team switching allowed after con-tract award? 636.119 How does this part apply to a project developed under a public-private partner-ship? Subpart BSelection
7、Procedures, Award Criteria 636.201 What selection procedures and award criteria may be used? 636.202 When are two-phase design-build se-lection procedures appropriate? 636.203 What are the elements of two-phase selection procedures for competitive pro-posals? 636.204 What items may be included in a
8、phase-one solicitation? 636.205 Can past performance be used as an evaluation criteria? 636.206 How do I evaluate offerors who do not have a record of relevant past per-formance? 636.207 Is there a limit on short listed firms? 636.208 May I use my existing prequalification procedures with design- bu
9、ild contracts? 636.209 What items must be included in a phase-two solicitation? 636.210 What requirements apply to projects which use the modified design-build pro-cedure? 636.211 When and how should tradeoffs be used? 636.212 To what extent must tradeoff deci-sions be documented? Subpart CProposal
10、Evaluation Factors 636.301 How should proposal evaluation fac-tors be selected? 636.302 Are there any limitations on the se-lection and use of proposal evaluation factors? 636.303 May pre-qualification standards be used as proposal evaluation criteria in the RFP? 636.304 What process may be used to
11、rate and score proposals? 636.305 Can price information be provided to analysts who are reviewing technical proposals? Subpart DExchanges 636.401 What types of information exchange may take place prior to the release of the RFP document? 636.402 What types of information exchange may take place afte
12、r the release of the RFP document? 636.403 What information may be exchanged with a clarification? 636.404 Can a competitive range be used to limit competition? 636.405 After developing a short list, can I still establish a competitive range? 636.406 Are communications allowed prior to establishing
13、the competitive range? 636.407 Am I limited in holding communica-tions with certain firms? 636.408 Can communications be used to cure proposal deficiencies? 636.409 Can offerors revise their proposals during communications? VerDate Mar2010 09:39 May 11, 2011 Jkt 223076 PO 00000 Frm 00222 Fmt 8010 Sf
14、mt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-213 Federal Highway Administration, DOT 636.103 Subpart EDiscussions, Proposal Revisions and Source Selection 636.501 What issues may be
15、addressed in dis-cussions? 636.502 Why should I use discussions? 636.503 Must I notify offerors of my intent to use/not use discussions? 636.504 If the solicitation indicated my in-tent was to award contract without dis-cussions, but circumstances change, may I still hold discussions? 636.505 Must a
16、 contracting agency establish a competitive range if it intends to have discussions with offerors? 636.506 What issues must be covered in dis-cussions? 636.507 What subjects are prohibited in dis-cussions, communications and clarifica-tions with offerors? 636.508 Can price or cost be an issue in dis
17、-cussions? 636.509 Can offerors revise their proposals as a result of discussions? 636.510 Can the competitive range be further defined once discussions have begun? 636.511 Can there be more than one round of discussions? 636.512 What is the basis for the source se-lection decision? 636.513 Are limi
18、ted negotiations allowed prior to contract execution? 636.514 How may I provide notifications and debriefings? AUTHORITY: Sec. 1503 of Pub. L. 10959, 119 Stat. 1144; Sec. 1307 of Pub. L. 105178, 112 Stat. 107; 23 U.S.C. 101, 109, 112, 113, 114, 115, 119, 128, and 315; 49 CFR 1.48(b). SOURCE: 67 FR 7
19、5926, Dec. 10, 2002, unless otherwise noted. Subpart AGeneral 636.101 What does this part do? This part describes the FHWAs poli-cies and procedures for approving de-sign-build projects financed under title 23, United States Code (U.S.C.). This part satisfies the requirement of sec-tion 1307(c) of t
20、he Transportation Eq-uity Act for the 21st Century (TEA21), enacted on June 9, 1998. The con-tracting procedures of this part apply to all design-build project funded under title 23, U.S.C. 636.102 Does this part apply to me? (a) This part uses a plain language format to make the rule easier for the
21、 general public and business community to use. The section headings and text, often in the form of questions and an-swers, must be read together. (b) Unless otherwise noted, the pro-noun you means the primary recipi-ent of Federal-aid highway funds, the State Transportation Department (STD). Where t
22、he STD has an agree-ment with a local public agency (or other governmental agency) to admin-ister a Federal-aid design-build project, the term you will also apply to that contracting agency. 636.103 What are the definitions of terms used in this part? Unless otherwise specified in this part, the def
23、initions in 23 U.S.C. 101(a) are applicable to this part. Also, the following definitions are used: Adjusted low bid means a form of best value selection in which qualitative as-pects are scored on a 0 to 100 scale ex-pressed as a decimal; price is then di-vided by qualitative score to yield an adju
24、sted bid or price per quality point. Award is made to offeror with the lowest adjusted bid. Best value selection means any selec-tion process in which proposals contain both price and qualitative components and award is based upon a combination of price and qualitative considerations. Clarifications
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART6362011DESIGNBUILDCONTRACTINGPDF

链接地址:http://www.mydoc123.com/p-701910.html