1、174 23 CFR Ch. I (4111 Edition) 630.1110 1The American Traffic Safety Services As-sociations (ATSSA) Quality Guidelines for Work Zone Traffic Control Devices uses photos and written descriptions to help judge when a traffic control device has outlived its usefulness. These guidelines are available f
2、or purchase from ATSSA through the following URL: http:/ bclitemldetail.jsp?productId=1. Similar guidelines are available from various State highway agencies. The Illinois Department of Transportation Quality Standards for Work Zone Traffic Control Devices is avail-able online at http:/dot.state.il.
3、us/workzone/ wztcd2004r.pdf. The Minnesota Department of Transportation Quality StandardsMeth-ods to determine whether the various traffic control devices are Acceptable, Marginal, or Unacceptable is available online at http:/ www.dot.state.mn.us/trafficeng/otepubl/ fieldmanual2007/FM2007 QualitySta
4、ndards.pdf. work not related to traffic control and safety; (2) As a minimum, separate pay items shall be provided for major cat-egories of traffic control devices, safe-ty features, and work zone safety ac-tivities, including but not limited to positive protection devices, and uni-formed law enforc
5、ement activities when funded through the project; (3) For method based specifications, the specifications and other PS (4) For method-based specifications, unit price pay items, lump sum pay items, or a combination thereof may be used; (5) Lump sum payment should be lim-ited to items for which an es
6、timate of the actual quantity required is pro-vided in the PS (6) For Lump Sum items, a contin-gency provision should be included such that additional payment is pro-vided if the quantity or nature of the required work changes, either an in-crease or decrease, due to cir-cumstances beyond the contro
7、l of the contractor; (7) Unit price payment should be pro-vided for those items over which the contractor has little or no control over the quantity, and no firm estimate of quantities is provided in the PS (8) Specifications should clearly indi-cate how placement, movement/reloca-tion, and maintena
8、nce of traffic con-trol devices and safety features will be compensated; and (9) The specifications should include provisions to require and enforce con-tractor compliance with the contract provisions relative to implementation and maintenance of the project TMP and related traffic control items. En
9、-forcement provisions may include rem-edies such as liquidated damages, work suspensions, or withholding payment for noncompliance. 630.1110 Maintenance of temporary traffic control devices. To provide for the continued effec-tiveness of temporary traffic control devices, each agency shall develop a
10、nd implement quality guidelines to help maintain the quality and adequacy of the temporary traffic control devices for the duration of the project. Agen-cies may choose to adopt existing qual-ity guidelines such as those developed by the American Traffic Safety Serv-ices Association (ATSSA) or other
11、 state highway agencies.1A level of in-spection necessary to provide ongoing compliance with the quality guidelines shall be provided. PART 633REQUIRED CONTRACT PROVISIONS Subpart AFederal-Aid Construction Con-tracts (Other Than Appalachian Con-tracts) Sec. 633.101 Purpose. 633.102 Applicability. 63
12、3.103 Regulatory authority. 633.104 Availability. Subpart BFederal-Aid Contracts (Appalachian Contracts) 633.201 Purpose. 633.202 Definitions. 633.203 Applicability of existing laws, regu-lations, and directives. 633.204 Fiscal allocation and obligations. 633.205 Prefinancing. VerDate Mar2010 09:39
13、May 11, 2011 Jkt 223076 PO 00000 Frm 00184 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-175 Federal Highway Administration, DOT 633.103 633.206 Project agreements. 633.207
14、 Construction labor and materials. 633.208 Maintenance. 633.209 Notices to prospective Federal-aid construction contractors. 633.210 Termination of contract. 633.211 Implementation of the Clean Air Act and the Federal Water Pollution Control Act. APPENDIX A TO SUBPART B OF PART 633 TYPES OF CONTRACT
15、S TO WHICH THE CIVIL RIGHTS ACT OF 1964 IS APPLICABLE APPENDIX B TO SUBPART B OF PART 633RE-QUIRED CONTRACT PROVISIONS, APPA-LACHIAN DEVELOPMENT HIGHWAY SYSTEM AND LOCAL ACCESS ROADS CONSTRUCTION CONTRACTS APPENDIX C TO SUBPART B OF PART 633AD-DITIONAL REQUIRED CONTRACT PROVI-SIONS, APPALACHIAN DEVE
16、LOPMENT HIGH-WAY SYSTEM AND LOCAL ACCESS ROADS CONTRACTS OTHER THAN CONSTRUCTION CONTRACTS APPENDIX D TO SUBPART B OF PART 633FED-ERAL-AID PROPOSAL NOTICES Subpart AFederal-Aid Construc-tion Contracts (Other Than Appalachian Contracts) AUTHORITY: 23 U.S.C. 114 and 315; 49 CFR 1.48. SOURCE: 52 FR 369
17、20, Oct. 2, 1987, unless otherwise noted. 633.101 Purpose. To prescribe for Federal-aid highway proposals and construction contracts the method for inclusion of required contract provisions of existing regula-tions which cover employment, nonseg-regated facilities, record of materials and supplies,
18、subletting or assigning the contract, safety, false statements concerning highway projects, termi-nation of a contract, and implementa-tion of the Clean Air Act and the Fed-eral Water Pollution Control Act, and other provisions as shall from time-to- time be required by law and regulation as conditi
19、ons of Federal assistance. 633.102 Applicability. (a) The required contract provisions and the required proposal notices apply to all Federal-aid construction con-tracts other than Appalachian con-struction contracts. (b) Form FHWA1273, Required Con-tract Provisions, Federal-aid Construc-tion Contra
20、cts, contains required con-tract provisions and required proposal notices that are required by regula-tions promulgated by the FHWA or other Federal agencies. The required contract provisions of Form FHWA 1273 shall be physically incorporated in each Federal-aid highway construction contract other t
21、han Appalachian con-struction contracts (see 633.104 for availability of form). (c) Reserved (d) The required contract provisions contained in Form FHWA1273 shall apply to all work performed on the contract by the contractors own orga-nization and to all work performed on the contract by piecework,
22、station work, or by subcontract. (e) The contractor shall insert in each subcontract, except as excluded by law or regulation, the required con-tract provisions contained in Form FHWA1273 and further require their inclusion in any lower tier subcontract that may in turn be made. The re-quired contra
23、ct provisions of Form FHWA1273 shall not be incorporated by reference in any case. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the re-quirements contained in the provisions of Form FHWA1273. (f) The State highway agency (SHA) shall i
24、nclude the notices concerning certification of nonsegregated facilities and implementation of the Clean Air Act and Federal Water Pollution Con-trol Act, pursuant to 40 CFR part 15, in all bidding proposals for Federal-aid highway construction projects. As the notices are reproduced in Form FHWA 127
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART6332011REQUIREDCONTRACTPROVISIONSPDF

链接地址:http://www.mydoc123.com/p-701908.html