1、BSI Standards PublicationBS 6349-3:2013Maritime works Part 3: Code of practice for thedesign of shipyards and sea locksPublishing and copyright informationThe BSI copyright notice displayed in this document indicates when the documentwas last issued. The British Standards Institution 2013Published b
2、y BSI Standards Limited 2013ISBN 978 0 580 78084 4ICS 47.020.99; 93.140The following BSI references relate to the work on this document:Committee reference CB/502Draft for comment 13/30259247 DCPublication historyFirst published August 1988Second (present) edition, December 2013Amendments issued sin
3、ce publicationDate Text affectedBS 6349-3:2013 BRITISH STANDARDContentsForeword iii1 Scope 12 Normative references 13 Terms, definitions and abbreviations 14 Shipyard layout 34.1 Operational parameters of shipyards 34.2 Siting of shipyards 44.3 Elements of shipyards 74.4 Equipment of shipyards 85 Dr
4、y docks 105.1 Operational parameters of dry docks 105.2 Siting of dry dock 175.3 Elements of dry docks 215.4 Equipment in dry docks 436 Shipyard quays, piers and dolphins 576.1 Operational parameters of shipyard quays, piers and dolphins 576.2 Siting of shipyard quays, piers and dolphins 576.3 Eleme
5、nts of shipyard quays, piers and dolphins 586.4 Equipment for shipyard quays, piers and dolphins 587 Slipways and shipbuilding berths 587.1 Operational parameters of slipways and shipbuilding berths 587.2 Siting of slipways and shipbuilding berths 597.3 Elements of slipways and shipbuilding berths 6
6、17.4 Equipment in slipways and shipbuilding berths 628 Shiplift facilities 648.1 Operational parameters of shiplifts 648.2 Siting of shiplifts 688.3 Elements of shiplifts 738.4 Equipment for shiplifts 769 Floating docks 789.1 Operational parameters of floating docks 789.2 Siting of floating docks 84
7、9.3 Elements of floating docks 859.4 Equipment for floating docks 8610 Sea locks 8710.1 Operational parameters of sea locks 8710.2 Siting of sea locks 8910.3 Elements of sea locks 9010.4 Equipment for sea locks 9111 Hydrolifts 9211.1 Operational parameters of hydrolifts 9211.2 Siting of hydrolifts 9
8、211.3 Elements of hydrolifts 9211.4 Equipment for hydrolifts 9412 Dock and lock gates 9412.1 Operational parameters of dock and lock gates 9412.2 Siting of dock and lock gates 10412.3 Elements of dock and lock gates 10412.4 Equipment for dock and lock gates 10813 Piped services and electrical distri
9、bution systems 10913.1 Operational parameters of piped services and electrical systems 109BRITISH STANDARD BS 6349-3:2013 The British Standards Institution 2013 i13.2 Siting of piped services and electrical systems 11413.3 Elements of piped services and electrical systems 11613.4 Equipment for piped
10、 services and electrical distribution 11814 Control systems 12014.1 Operational parameters of control systems 12014.2 Siting of control systems 12214.3 Elements of control systems 12314.4 Equipment for control systems 124Bibliography 125List of figuresFigure 1 Example of a shipyard footprint 5Figure
11、 2 Process to achieve basis of design 7Figure 3 Distribution system definition 9Figure 4 Cross-section of dry dock: depth of entrance 11Figure 5 Cross-section of dry dock: width of entrance 11Figure 6 Cross-section of dry dock: operational width of dock 12Figure 7 Operational length of dry dock 13Fi
12、gure 8 Keel block loading on dock floor 24Figure 9 Bilge block loading on dock floor 25Figure 10 Types of dry dock wall construction in reinforced concrete 32Figure 11 Sheet-piled dry dock wall with drained dock floor 32Figure 12 Caissons forming dry dock walls 34Figure 13 Typical end transfer only
13、arrangement 69Figure 14 Typical mixed side and end transfer arrangement 71Figure 15 Typical side transfer only arrangement 72Figure 16 Section through typical vertical mooring tube arrangement 80Figure 17 Section through typical chain mooring arrangement 81Figure 18 Plan on typical chain mooring arr
14、angement for floating dock 81Figure 19 Examples of entrance gates: flap gates 97Figure 20 Examples of entrance gates: floating caisson gates 98Figure 21 Examples of entrance gates: sliding/rolling caisson gates 99Figure 22 Examples of entrance gates: mitre gates 100Figure 23 Examples of entrance gat
15、es: sector gates 100Figure 24 Examples of intermediate dock gates 101List of tablesTable1Typical gate types and parameters 102Summary of pagesThis document comprises a front cover, an inside front cover, pages i to iv,pages 1 to 126, an inside back cover and a back cover.BRITISH STANDARDBS 6349-3:20
16、13ii The British Standards Institution 2013ForewordPublishing informationThis part of BS 6349 is published by BSI Standards Limited, under licence fromThe British Standards Institution, and came into effect on 31 December 2013.It was prepared by Technical Committee CB/502, Maritime works. A list ofo
17、rganizations represented on this committee can be obtained on request to itssecretary.SupersessionThis part of BS 6349 supersedes BS 6349-3:1988, which is withdrawn.Relationship with other publicationsBS 6349 is published in the following parts1): Part 1-1: General Code of practice for planning and
18、design for operations; Part 1-2: General Code of practice for assessment of actions;2) Part 1-3: General Code of practice for geotechnical design; Part 1-4: General Code of practice for materials; Part 2: Code of practice for the design of quay walls, jetties and dolphins; Part 3: Code of practice f
19、or the design of shipyards and sea locks; Part 4: Code of practice for design of fendering and mooring systems; Part 5: Code of practice for dredging and land reclamation; Part 6: Design of inshore moorings and floating structures;3) Part 7: Guide to the design and construction of breakwaters; Part
20、8: Code of practice for the design of Ro-Ro ramps, linkspans andwalkways.The recommendations in this part of BS 6349 are intended for use in all globallocations, but taking into account local conditions. As a British Standard, thispart of BS 6349 makes reference to other British Standards and to oth
21、erpublications commonly used in the UK, but it is recognized that in somelocations there will be alternative local or international publications that areequally applicable. It is the responsibility of the designer to take steps to be fullycognisant of the prevailing codes and standards in any partic
22、ular location.Information about this documentThis is a full revision of the standard. The principal change is to broaden thescope to include all principal maritime waterfront structures designed forshipyards and their interrelationship in the design of the whole shipyard. Thegeneral criteria for mar
23、itime works have been removed in this revision, as theyare now collected together in the four subparts of BS 6349-14), which includesgeneral planning and design for operations, actions, geotechnical conditions andmaterials. BS 6349-3 covers the criteria which are specific to works in shipyardsand se
24、a locks.1)A new part 9, covering port surfacing, is in preparation.2)In preparation.3)Some of the recommendations in BS 6349-6:1989 have now been incorporated intoClause 9 of the present part of BS 6349, and brought up to date. It is anticipated thatthese recommendations will be removed from BS 6349
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS634932013MARITIMEWORKSCODEOFPRACTICEFORTHEDESIGNOFSHIPYARDSANDSEALOCKS 海上 工程 结构 船坞 设计 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-545958.html