ASTM C172 C172M-2010 Standard Practice for Sampling Freshly Mixed Concrete《新鲜预拌混凝土取样的标准实施规程》.pdf
《ASTM C172 C172M-2010 Standard Practice for Sampling Freshly Mixed Concrete《新鲜预拌混凝土取样的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C172 C172M-2010 Standard Practice for Sampling Freshly Mixed Concrete《新鲜预拌混凝土取样的标准实施规程》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C172/C172M 10Standard Practice forSampling Freshly Mixed Concrete1This standard is issued under the fixed designation C172/C172M; the number immediately following the designation indicates the yearof original adoption or, in the case of revision, the year of last revision. A number in p
2、arentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope*1.1 This practice covers procedures for obtaining represen-tative sa
3、mples of fresh concrete as delivered to the project siteon which tests are to be performed to determine compliancewith quality requirements of the specifications under which theconcrete is furnished (Note 1). The practice includes samplingfrom stationary, paving and truck mixers, and from agitatinga
4、nd nonagitating equipment used to transport central-mixedconcrete.1.2 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combi
5、ningvalues from the two systems may result in non-conformancewith the standard.NOTE 1Composite samples are required by this practice, unlessspecifically excepted by procedures governing the tests to be performedsuch as tests to determine uniformity of consistency and mixer efficiency.Procedures used
6、 to select the specific test batches are not described in thispractice, but it is recommended that random sampling be used todetermine overall specification compliance.1.3 This practice also covers the procedures to be used forpreparing a sample of concrete for further testing where it isdesirable o
7、r necessary to remove the aggregate larger than adesignated size. This removal of larger aggregate particles ispreferably accomplished by wet-sieving.1.4 The text of this standard references notes and footnoteswhich provide explanatory material and shall not be consideredas requirements of the pract
8、ice.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WarningFr
9、eshhydraulic cementitious mixtures are caustic and may causechemical burns to skin and tissue upon prolonged exposure.2)2. Referenced Documents2.1 ASTM Standards:3E11 Specification for Woven Wire Test Sieve Cloth and TestSieves3. Significance and Use3.1 This practice is intended to provide standard
10、require-ments and procedures for sampling freshly mixed concretefrom different containers used in the production or transporta-tion of concrete. The detailed requirements as to materials,mixtures, air content, temperature, number of specimens,slump, interpretation of results, and precision and bias
11、are inspecific test methods.4. Sampling4.1 The elapsed time shall not exceed 15 min. betweenobtaining the first and final portions of the composite sample.4.1.1 Transport the individual samples to the place wherefresh concrete tests are to be performed or where test speci-mens are to be molded. They
12、 shall be combined and remixedwith a shovel the minimum amount necessary to ensureuniformity and compliance with the maximum time limitsspecified in 4.1.2.4.1.2 Start tests for slump, temperature, and air contentwithin 5 min after obtaining the final portion of the compositesample. Complete these te
13、sts expeditiously. Start moldingspecimens for strength tests within 15 min after fabricating thecomposite sample. Expeditiously obtain and use the sampleand protect the sample from the sun, wind, and other sources ofrapid evaporation, and from contamination.1This practice is under the jurisdiction o
14、f ASTM Committee C09 on Concreteand ConcreteAggregates and is the direct responsibility of Subcommittee C09.60 onTesting Fresh Concrete.Current edition approved Oct. 1, 2010. Published November 2010. Originallyapproved in 1942. Last previous edition approved in 2008 as C17208 DOI:10.1520/C0172_C0172
15、M-10.2Section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer
16、to the standards Document Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5. Procedure5.1 Size of SampleMake the samples to be used for
17、strength tests a minimum of 28 L 1 ft3. Smaller samples arenot prohibited for routine air content, temperature, and slumptests. The size of the samples shall be dictated by the maximumaggregate size.5.2 The procedures used in sampling shall include the use ofevery precaution that will assist in obta
18、ining samples that aretruly representative of the nature and condition of concretesampled as follows:NOTE 2Sampling should normally be performed as the concrete isdelivered from the mixer to the conveying vehicle used to transport theconcrete to the forms; however, specifications may require other p
19、oints ofsampling, such as the discharge of a concrete pump.5.2.1 Sampling from Stationary Mixers, Except PavingMixersSample the concrete by collecting two or moreportions taken at regularly spaced intervals during discharge ofthe middle portion of the batch. Obtain these portions withinthe time limi
20、t specified in Section 4. Combine into onecomposite sample for testing purposes. Do not obtain portionsof the composite sample from the very first or last part of thebatch discharge (Note 3). Perform sampling by passing areceptacle completely through the discharge stream, or bycompletely diverting t
21、he discharge into a sample container. Ifdischarge of the concrete is too rapid to divert the completedischarge stream, discharge the concrete into a container ortransportation unit sufficiently large to accommodate the entirebatch and then accomplish the sampling in the same manner asgiven above. Ta
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC172C172M2010STANDARDPRACTICEFORSAMPLINGFRESHLYMIXEDCONCRETE 新鲜 混凝土 取样 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-465642.html