1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 44 00 (February 2013)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 44 00REINFORCED AUTOCLAVE AERATED CONCRETE PANELS02/13P
2、ART 1 GENERAL1.1 REFERENCES1.2 ADMINISTRATIVE REQUIREMENTS1.2.1 Pre-Installation Conference1.2.2 Sequencing and Scheduling of PAAC element Installation1.2.2.1 Panel Loadign1.2.2.2 Construction Activities Coordination1.3 SUBMITTALS1.4 PERFORMANCE REQUIREMENTS1.4.1 Design Methods1.4.2 Allowable Design
3、 Loads and Deflections1.4.3 UL Fire-Resistance Listing and Label1.5 DRAWINGS1.6 QUALITY CONTROL1.6.1 Qualifications for PAAC Manufacturer1.6.2 Qualifications For Installer1.6.3 Qualifications For Welding Work1.6.4 Concrete Sampling and Testing1.6.4.1 Tests for Concrete Materials1.6.4.2 Concrete Desi
4、gn Mixes1.6.5 PAAC Framing Mock-up1.7 DELIVERY, STORAGE, AND HANDLING PAAC ELEMENTS1.7.1 Packing and Shipping of PAAC Elements:1.7.2 Storage and Protection of PAAC Elements:PART 2 PRODUCTS2.1 CONCRETE MATERIALS2.1.1 Aggregates2.1.2 Portland Cement2.1.3 Ground Granulated Blast Furnace (GGBF) Slag2.1.
5、4 Air Entraining Admixture2.1.5 Water2.2 REINFORCEMENT MATERIALS2.2.1 Reinforcement Bars2.2.2 Cold-Drawn Steel WireSECTION 03 44 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3 CONNECTION MATERIALS2.3.1 Steel Plates2.3.2 Steel Shapes2.3.
6、3 Steel Bars2.4 GROUTING MATERIALS2.4.1 Cement Grout2.4.2 Shrink-Resistant Grout2.4.3 Epoxy-Resin Grout2.5 BITUMINOUS JOINT SEALING MATERIALS2.6 FABRICATION2.6.1 Fabrication Tolerances2.6.2 Forms2.6.3 Reinforcement2.6.4 Lifting Devices2.6.5 Concrete Mixing and Conveying2.6.6 Preparations for Placing
7、 Concrete2.6.7 Weather Limitations2.6.8 Concrete Placing2.6.9 Identification Markings2.6.10 Finishing Unformed Surfaces2.6.11 Protection of Concrete After Placing2.6.12 Finishing Formed Surfaces2.6.12.1 Concealed Formed Surfaces2.6.12.2 PAAC Element Patching2.6.12.3 Finishing Exposed-To-View2.7 QUAL
8、ITY OF CONCRETE2.7.1 Quality Control Testing During Fabrication2.7.2 Autoclaved Aerated Concrete PropertiesPART 3 EXECUTION3.1 ANCHORAGE ITEMS EMBEDDED IN OTHER CONSTRUCTION3.2 STRENGTH OF STRUCTURAL SECTIONS AT INSTALLATION3.3 INSTALLATION TOLERANCES3.4 PLACING FRAMING STRUCTURAL SECTIONS3.4.1 Plac
9、ing PAAC Framing Sections3.4.2 Cold Weather Precautions When Utilizing Thin Bed Mortar Joints3.4.2.1 Ambient Temperature Requirements3.4.2.2 Daily Mean Temperature Requirements for Cold Weather3.4.3 Hot Weather Precautions When Utilizing Thin Bed Mortar Joints3.5 PLACING STRUCTURAL PAAC FLOOR OR ROO
10、F SLAB SECTIONS3.6 GROUTING CONNECTIONS AND JOINTS3.6.1 Cement Grout3.6.2 Shrink-Resistant Grout3.6.3 Epoxy-Resin Grout3.7 SEALING JOINTS IN ROOF SLABS3.8 OPENINGS IN SLAB STRUCTURAL SECTIONS3.9 TOUCHUP PAINTING3.10 PROTECTION AND CLEANING3.11 INSPECTION AND ACCEPTANCE PROVISIONS3.11.1 Dimensional T
11、olerances3.11.2 Surface-Finish Requirements3.11.3 Strength of Structural Members3.11.4 Testing Structural Sections for Strength3.11.5 Inspection of Welding3.11.6 Structural Sections-in-Place- End of Section Table of Contents -SECTION 03 44 00 Page 2Provided by IHSNot for ResaleNo reproduction or net
12、working permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 44 00 (February 2013)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION 03 44 00REINFORCED AUTOCLAVE AERATED CONCRETE PANELS02/13*
13、NOTE: This guide specification covers the requirements for fabrication and erection of reinforced precast autoclave aerated concrete (PAAC) panels, used as structural floor units, and roof units and wall units for buildings.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format
14、 Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information
15、 and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Precast autoclave aerated concrete (PAAC)
16、floor, roof, and wall units for clear spans up to 5.94 meters19 feet 6 inchesDrawings must include a complete design indicating the character of the work to be performed and giving the following:Assumed loads, including floor live load, roof live load, wind load, concentrated loads such as partition
17、s, and equipment mounted on or suspended from precast concrete construction, concrete floor topping weight, and other design data as may be required for the proper preparation of shop drawings.SECTION 03 44 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license
18、 from IHS-,-,-Layout of the framing system indicating the relative location of the structural PAAC sections, floor elevations, column centers and offsets, openings, and sufficient dimensions to adequately convey the quantity and nature of the required structural PAAC framing system.and/or elements.D
19、etails of all structural PAAC Sections indicating cross-sections and dimensions.Location of structural PAAC Sections having an architectural finish on exposed-to-view surfaces when required.;Details of reinforcement indicating smooth welded wire reinforcing schedule for PAAC panels as requiredDetail
20、s of connections indicating end bearing minimums and anchorage devices in the structural PAAC sections.Location and details of concrete floor topping, when required.Details of openings including the size of steel framing members as required.Details of precast concrete filler blocks, as required.Deta
21、ils of hangers for suspended ceilings, ducts, piping, lighting fixtures, conduit, or other construction, as required.When both fire-resistance-rated construction and nonrated construction are required, the location of fire-resistance-rated construction.Cast-in-place normal-weight concrete, including
22、 concrete floor topping, is specified in Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE.Precast conventionally reinforced concrete wall panels, solid-section type, are specified in Section 03 45 00 PRECAST ARCHITECTURAL CONCRETE.Precast-concrete roof slabs placed over purlins or joists spaced
23、 not more than 8 feet on center are specified in Section 03 41 16.08 PRECAST CONCRETE SLABS (MAX. SPAN 8 - 0“ 0.C).Sealing joints in exposed-to-view surfaces of PAAC slabs, such as at ceilings and walls, is specified in Section 07 92 00 JOINT SEALANTS.Painting exposed-to-view surfaces of PAAC units
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0344002013REINFORCEDAUTOCLAVEAERATEDCONCRETEPANELSPDF

链接地址:http://www.mydoc123.com/p-449551.html