ARMY UFGS-03 37 23-2009 ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION《大体积混凝土施工用滚筒 压实混凝土》.pdf
《ARMY UFGS-03 37 23-2009 ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION《大体积混凝土施工用滚筒 压实混凝土》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-03 37 23-2009 ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION《大体积混凝土施工用滚筒 压实混凝土》.pdf(67页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 37 23 (November 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-03 37 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 37 23ROLLER-COMP
2、ACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION11/09PART 1 GENERAL1.1 UNIT PRICES1.1.1 Roller-Compacted Concrete (RCC) in _1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.1.2 Dental Concrete1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Bedding Concrete1.1.3.1 Payment1.1.3.2
3、 Measurement1.1.3.3 Unit of Measure1.1.4 Portland Cement1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measure1.1.5 Pozzolan1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Water-Reducing Admixture (WRA)1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 RCC Test Section1
4、.1.7.1 Payment1.1.7.2 Measurement1.1.7.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 General Requirements1.3.2 Mixture Proportions and Studies1.3.3 Proportioning ResponsibilitySECTION 03 37 23 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
5、m IHS-,-,-1.3.4 Nominal Maximum Size of Aggregate1.3.5 Consistency of RCC1.3.6 Materials for Mixture-Proportioning Studies1.3.7 Construction Tolerances1.3.7.1 Conventional Concrete Surfaces1.3.7.2 RCC Surfaces1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Preconstruction Government Testing1.5.2 Cementitio
6、us Materials and Admixtures1.5.3 Government Testing During Construction1.5.3.1 Aggregates Testing1.5.3.2 Cementitious Materials1.5.3.3 Prequalified Cement Sources1.5.3.4 Prequalified Pozzolan Sources1.5.3.5 Nonprequalified Cement Sources1.5.3.6 Nonprequalified Pozzolan Sources1.5.3.7 Admixtures1.6 D
7、ELIVERY, STORAGE, AND HANDLING1.6.1 Cementitious Materials1.6.1.1 Transportation1.6.1.2 Storage1.6.2 Aggregate Storage1.6.3 Chemical Admixtures1.7 ENVIRONMENTAL REQUIREMENTS1.7.1 Cold-Weather Placement1.7.2 Placing During Rain1.7.3 Hot-Weather PlacementPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cementitious
8、Materials2.1.1.1 Portland Cement2.1.1.2 Pozzolan2.1.1.3 Ground Granulated Blast-Furnace (GGBF) Slag2.1.1.4 Temperature of Cementitious Materials2.1.2 Admixtures2.1.2.1 Water-Reducing Admixture (WRA)2.1.2.2 Air-Entraining Admixture2.1.3 Water2.1.4 Aggregates2.1.4.1 Composition2.1.4.2 Quality2.1.4.3 G
9、rading2.1.4.4 Particle Shape2.1.4.5 Moisture Content2.1.4.6 Commercial Concrete Aggregate Sources2.1.4.7 Government-Furnished Concrete Aggregate Source2.2 PLANT AND EQUIPMENT2.2.1 Concrete Plant2.2.2 Location2.2.3 Bins and Silos2.2.4 Bulk Cement or Pozzolan2.2.5 Batch Plant2.2.6 Continuous Mixing Pl
10、ant(s)2.2.7 Laboratory Areas2.2.8 Mixers2.2.9 Truck MixersSECTION 03 37 23 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.10 Pugmill Mixers2.2.11 Mixer Uniformity Requirements2.2.12 Sampling Facilities2.2.12.1 Sampling Concrete2.2.12.2 Sam
11、pling Aggregates2.2.13 Transporting and Conveying Equipment2.2.13.1 Trucks2.2.13.2 Belt Conveyors2.2.14 Spreading and Remixing Equipment2.2.15 Compaction Equipment2.2.15.1 Primary Rollers2.2.15.2 Small Vibratory Rollers2.2.15.3 Tampers (Rammers)2.2.15.4 Other Requirements2.2.16 Truck-Mounted Vacuum
12、Pickup System2.2.17 Other Motorized Equipment2.2.18 Nuclear Density Gauge2.2.19 Calibration2.2.20 Vibrators2.2.21 Slipforming EquipmentPART 3 EXECUTION3.1 PREPARATION FOR PLACING3.1.1 Placing Schedule3.1.2 RCC Orientation Session3.1.3 Aggregate Production Schedule3.1.4 RCC Test Section3.1.5 Surface
13、Preparation3.1.5.1 Cleaning3.1.5.2 High-Volume Low-Pressure Washing3.1.5.3 High-Pressure Water Jet3.1.5.4 Wet Sandblasting3.1.5.5 Waste Disposal3.2 PLACING3.2.1 Procedures3.2.2 Bedding Mortar3.2.3 Bedding Concrete3.2.4 Lift Thickness3.2.5 Depositing, Spreading, and Remixing3.2.6 Compaction/Consolida
14、tion3.2.6.1 Theoretical Density (TD) Determination3.2.6.2 Required Compaction Density3.2.6.3 Density Determination of Compacted RCC3.2.6.4 Additional Compaction3.2.6.5 Consolidation of Bedding and Other Conventional Concrete3.2.7 Lift Joints3.2.7.1 Regular Lift-Joint Treatment3.2.7.2 Cold Joints3.2.
15、7.3 Vertical Joints3.2.8 Downstream Face3.2.8.1 Using Sacrificial Concrete3.2.8.2 Using Conventional Concrete3.3 CURING AND PROTECTION3.3.1 Curing3.3.2 Cold-Weather Protection3.3.3 Special Cold-Weather Insulation Protection3.3.4 Hot-Weather Protection3.4 VERTICAL FACINGS FOR RCC CONSTRUCTIONSECTION
16、03 37 23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.1 Form and Cast-in-Place Conventional Concrete3.4.2 Slipformed Facing Elements3.4.2.1 Prequalification of Equipment3.4.2.2 Slipform Operations3.4.2.3 Slipforming - Preparation for Pla
17、cing3.4.2.4 Slipforming - Placing3.4.2.5 Slipforming - Finishing3.4.3 Precast Reinforced Panels3.4.3.1 Leveling Pad3.4.3.2 Alignment3.5 SAFETY BARRIER3.6 CONTRACTION JOINTS3.7 GALLERY3.7.1 Precast Gallery Segments3.7.2 Temporary Forms3.7.3 Noncementing Fill Method3.8 SPILLWAY CONSTRUCTION3.8.1 Spill
18、way Chute and Ogee Section3.8.2 Training Walls3.8.3 Finishing3.8.3.1 General3.8.3.2 Float Finish3.9 TESTS AND INSPECTIONS3.9.1 General3.9.2 Testing and Inspection Requirements3.9.2.1 Fine Aggregate3.9.2.2 Coarse Aggregate3.9.2.3 Quality of Aggregates3.9.2.4 Scales3.9.2.5 Concrete Plant Control3.9.2.
19、6 Concrete3.9.2.7 Field Density3.9.2.8 Inspection Before Placing3.9.2.9 Placing Inspection3.9.2.10 Vibrator Tests3.9.2.11 Curing Inspection3.9.2.12 Cold-Weather and Hot-Weather Protection3.9.2.13 Cold-Weather and Hot-Weather Protection Corrective Action3.9.3 Reports- End of Section Table of Contents
20、 -SECTION 03 37 23 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 37 23 (November 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-03 37 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferenc
21、es are in agreement with UMRL dated October 2009*SECTION 03 37 23ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION11/09*NOTE: This guide specification covers the requirements for furnishing, hauling, placing, and roller-compacting concrete for mass concrete construction.Edit this guide specif
22、ication for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0337232009ROLLERCOMPACTEDCONCRETEFORMASSCONCRETECONSTRUCTION 体积 混凝土 施工 滚筒 PDF

链接地址:http://www.mydoc123.com/p-449549.html