1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 37 13 (November 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-03 37 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 37 13SHOTCRETE11
2、/09PART 1 GENERAL1.1 UNIT PRICES1.1.1 Shotcrete1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Strength1.3.2 Compressive Strength1.3.3 Flexural Strength1.3.4 Toughness Index1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Qualifications1.5.2 Preconstruction
3、 Test PanelsPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cementitious Materials2.1.1.1 Portland Cement2.1.1.2 Blended Hydraulic Cement2.1.1.3 Pozzolan Other Than Silica Fume2.1.1.4 Ground Granulated Blast-Furnace Slag2.1.1.5 Silica Fume2.1.2 Aggregates2.1.3 Water2.1.4 Admixtures2.1.5 Curing Materials2.1.5.1 Im
4、pervious Sheet Materials2.1.5.2 Membrane-Forming Curing Compound2.1.6 Reinforcement2.1.6.1 Steel Fiber Reinforcement2.1.6.2 Other Types of ReinforcementSECTION 03 37 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.7 Air Content2.1.8 Air
5、Supply2.2 MIXTURE PROPORTIONS2.3 EQUIPMENT2.3.1 Dry Mix Batching and Mixing2.3.2 Delivery Equipment for Dry Mix2.3.3 Wet Mix Batching and Mixing2.3.4 Delivery Equipment for Wet MixPART 3 EXECUTION3.1 PREPARATION OF SURFACES3.1.1 Earth3.1.2 Existing Concrete3.1.3 Rock3.1.4 Shotcrete3.1.5 Construction
6、 Joints3.2 PLACEMENT OF SHOTCRETE3.2.1 General3.2.2 Placement Techniques3.2.2.1 Placement Control3.2.2.2 Corners3.2.3 Placement Around Reinforcement3.2.4 Cover of Reinforcement3.2.5 Placement Precautions3.3 REPAIR OF DEFECTS3.3.1 Defects3.3.1.1 Repairs3.3.1.2 Minor Patching3.3.2 Core Holes3.4 FINISH
7、ING3.4.1 Natural Gun Finish3.4.2 Cutting Screed3.4.3 Flash Coat3.4.4 Float and Trowel Finish3.4.5 Fiber-Reinforced Shotcrete3.5 CURING AND PROTECTION3.5.1 Initial Curing3.5.2 Final Curing3.5.3 Formed Surface3.5.4 Duration of Curing3.5.5 Temperature Considerations3.6 TESTS3.6.1 Strength Testing3.6.1.
8、1 Test Panel3.6.1.2 Test Cores3.6.1.3 Average Compressive Strength3.6.1.4 Average Flexural Strength3.6.1.5 Average Toughness Index3.6.2 Aggregate Moisture3.6.3 Grading3.6.4 Thickness3.6.5 Mixture Proportions3.6.6 Preparations3.6.7 Air Content- End of Section Table of Contents -SECTION 03 37 13 Page
9、2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 37 13 (November 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-03 37 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with
10、 UMRL dated October 2009*SECTION 03 37 13SHOTCRETE11/09*NOTE: This guide specification covers the requirements for materials, proportioning, application, and curing of shotcrete.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items
11、, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specifi
12、cation. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The content of this specification is such that guidance given in EM
13、1110-2-2005, STANDARD PRACTICE FOR SHOTCRETE, is applicable.*1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs
14、below should be inserted into Section 01 22 00.00 10.SECTION 03 37 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*1.1.1 Shotcrete1.1.1.1 PaymentPayment will be made for all costs associated with furnishing, delivering, and placing shotcret
15、e.1.1.1.2 MeasurementShotcrete will be measured for payment based upon the quantity in cubic meters yards of solid material gunned through the nozzles. the quantity per cubic meter yard, based on a unit length the area shotcreted to the thickness shown on the contract drawings.1.1.1.3 Unit of Measur
16、eUnit of measure: cubic meter yard.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use
17、the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automaticall
18、y be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.A
19、CI INTERNATIONAL (ACI)ACI CP-60 (2002)Craftman Workbook for ACI Certification of Shotcrete NozzlemanASTM INTERNATIONAL (ASTM)ASTM A 820/A 820M (2006) Standard Specification for Steel Fibers for Fiber-Reinforced ConcreteASTM C 1077 (2009b) Standard Practice for Laboratories Testing Concrete and Concr
20、ete Aggregates SECTION 03 37 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-for Use in Construction and Criteria for Laboratory EvaluationASTM C 1140 (2003a) Standard Practice for Preparing and Testing Specimens from Shotcrete Test PanelsAS
21、TM C 1141/C 1141M (2008) Standard Specification for Admixtures for ShotcreteASTM C 1240 (2005) Standard Specification for Silica Fume Used in Cementitious MixturesASTM C 1260 (2007) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)ASTM C 136 (2006) Standard Test
22、Method for Sieve Analysis of Fine and Coarse AggregatesASTM C 150/C 150M (2009) Standard Specification for Portland CementASTM C 1567 (2008) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)ASTM C 1609/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0337132009SHOTCRETE 喷浆 混凝土 PDF