ARMY UFGS-03 37 00-2009 PREPLACED-AGGREGATE CONCRETE《预填集料混凝土》.pdf
《ARMY UFGS-03 37 00-2009 PREPLACED-AGGREGATE CONCRETE《预填集料混凝土》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-03 37 00-2009 PREPLACED-AGGREGATE CONCRETE《预填集料混凝土》.pdf(38页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 37 00 (November 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-03 37 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 37 00PREPLACED-A
2、GGREGATE CONCRETE11/09PART 1 GENERAL1.1 UNIT PRICES1.1.1 Payment1.1.2 Measurement1.1.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Design of Preplaced Aggregate1.3.2 Maximum Water-Cement Ratio (W/C)1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Government Preconstruction Sampling and Testing1
3、.5.1.1 Aggregates1.5.1.2 Cementitious Materials, Admixtures, and Curing Compound1.5.2 Construction Testing by GovernmentPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cementitious Materials2.1.1.1 Portland Cement2.1.1.2 Pozzolan2.1.1.3 Ground Granulated Blast-Furnace Slag2.1.2 Aggregates2.1.2.1 Listed Sources2.1
4、.2.2 Fine-Aggregate Grading2.1.2.3 Coarse-Aggregate Grading2.1.2.4 Coarse-Aggregate Particle Shape2.1.2.5 Concrete Aggregate Sources2.1.2.6 Coarse-Aggregate Quality2.1.3 Chemical Admixtures2.1.3.1 Air-Entraining Admixture2.1.3.2 Grout Fluidifier2.1.3.3 Water-Reducing or Retarding Admixtures2.1.4 Cur
5、ing MaterialsSECTION 03 37 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.4.1 Impervious-Sheet Curing Materials2.1.4.2 Membrane-Forming Curing Compound2.1.4.3 Burlap2.1.5 Water2.1.6 Nonshrink Grout2.2 GROUT MIXTURE PROPORTIONING2.2.1 Qu
6、ality of Mixture2.2.2 Air Content2.2.3 Grout Flow2.3 EQUIPMENT2.3.1 Capacity2.3.2 Batching Equipment2.3.2.1 Scales2.3.2.2 Batching Tolerances2.3.2.3 Grout Mixer2.3.2.4 Agitator Tank2.3.2.5 Grout Pump2.3.3 Grout Pipe System2.3.3.1 Delivery Pipes2.3.3.2 Grout Insert Pipes2.3.3.3 Sounding WellsPART 3 E
7、XECUTION3.1 PREPARATION FOR PLACEMENT3.1.1 Embedded Items3.1.2 Concrete on Earth Foundations3.1.3 Concrete on Rock Foundations3.1.4 Underwater Placement3.1.5 Concrete Surfaces3.1.6 Construction Joint Treatment3.1.6.1 Joint Preparation3.1.6.2 Air-Water Cutting3.1.6.3 High-Pressure Water Jet3.1.6.4 We
8、t Sandblasting3.1.6.5 Waste Disposal3.2 COARSE-AGGREGATE AND GROUT PLACEMENT3.2.1 Coarse-Aggregate Washing and Screening3.2.2 Transporting and Placing Coarse Aggregate3.2.3 Cold-Weather Placing of Preplaced-Aggregate Concrete3.2.4 Hot-Weather Placing of Preplaced-Aggregate Concrete3.2.5 Grout Mixing
9、 and Pumping3.2.5.1 Charging Sequence3.2.5.2 Mixing Time3.2.5.3 Pumping Procedure3.2.5.4 Blocked Pipes3.2.5.5 Placing Temperature3.3 FINISHING3.3.1 Formed Top Surface3.3.2 Screeded or Trowelled Surface3.4 CURING AND PROTECTION3.4.1 Duration3.4.2 Moist Curing3.4.3 Curing with Membrane-Forming Curing
10、Compound3.4.3.1 Pigmented Curing Compound3.4.3.2 Nonpigmented Curing Compound3.4.3.3 Application3.4.4 Impervious-Sheet Curing3.4.5 Cold-Weather Curing and ProtectionSECTION 03 37 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.6 Appearan
11、ce3.5 TESTING AND QUALITY VERIFICATION FOR CONTRACTOR QUALITY CONTROL3.5.1 General3.5.2 Testing and Inspection Requirements3.5.2.1 Fine Aggregate3.5.2.2 Coarse Aggregate3.5.2.3 Quality of Aggregates3.5.2.4 Scales3.5.2.5 Grout Plant Control3.5.2.6 Grout Mixture3.5.2.7 Test for Grout Flow3.5.2.8 Inspe
12、ction Before Pumping Grout3.5.2.9 Grout Pumping3.5.2.10 Curing3.5.2.11 Cold-Weather Protection and Sealed Insulation Curing3.5.2.12 Cold-Weather Protection Corrective Action3.5.3 Reports- End of Section Table of Contents -SECTION 03 37 00 Page 3Provided by IHSNot for ResaleNo reproduction or network
13、ing permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 37 00 (November 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-03 37 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION 03 37 00PREPLACED-AGGRE
14、GATE CONCRETE11/09*NOTE: This guide specification covers the requirements for furnishing, hauling, and preplacing aggregate concrete incidental to the drilling and the grouting.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items,
15、 choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specific
16、ation. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The content of this specification is such that guidance given in EM 1
17、110-2-2000, “Standard Practice for Concrete“, is applicable.*1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs
18、below should be inserted into SECTION 03 37 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Section 01 22 00.00 10.*1.1.1 PaymentPayment will be made for all costs associated with unloading, handling, and storage of all aggregate, cement, po
19、zzolan, fluidifier, and chemical admixture used in the work, including all costs of labor and the use of all equipment, tools, 150 by 300 mm 6 inch by 12 inch cylinder molds, and other materials required to complete the work, excluding cost of reinforcement and embedded parts which are specified to
20、be paid for separately.1.1.2 MeasurementPreplaced-Aggregate Concrete will be measured for payment based on the actual volume placed within the paylines of the structures as indicated.1.1.3 Unit of MeasureUnit of measure: cubic meter yard.1.2 REFERENCES*NOTE: This paragraph is used to list the public
21、ations cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Referenc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0337002009PREPLACEDAGGREGATECONCRETE 集料 混凝土 PDF

链接地址:http://www.mydoc123.com/p-449547.html