ARMY MIL-S-51537-1987 SMOKE POT FLOATING SGF2 AN-M7A1 COMPONENTS FOR《SGF2 AN-M7A1浮动发烟罐构件》.pdf
《ARMY MIL-S-51537-1987 SMOKE POT FLOATING SGF2 AN-M7A1 COMPONENTS FOR《SGF2 AN-M7A1浮动发烟罐构件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-51537-1987 SMOKE POT FLOATING SGF2 AN-M7A1 COMPONENTS FOR《SGF2 AN-M7A1浮动发烟罐构件》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、mL-S-51537 (EA) 16 October 1987 the solicitation. STANDARDS MILITARY MIL-STD-lO5 - Sampling Procedures and Tables for MIL-STD-1168 - Ammunition Lot Numbering MIL-STD-1169 - Packaging, Packing and Marking for Attribut es Ammunit ion Components Inspect ion by Shipment of Inert MILITARY SPECIFICATION S
2、MOKE POT, FLOATING, SGF2, AN-MTAl; COMPONENTS FOR This specification is approved for use within the Chemical Research, Development and Engineering Center, Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope: This specifica
3、tion covers eight components for %he AN-M/A1 smoke pot. The components are identified in table I. 2e APPLICABLE DOCUMENTS 2 . 1 Government documents . 2.1.1 Standards. The following standards form a part of this specification to the extent specified herein. these documents shall be those listed in t
4、he issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in Unless otherwise specified, the issues of . 2.1.2 Drawings. The following drawings form a part of the extent specified herein. Unless otherwise specified, those in ezfect on the date
5、 of the solicitation. this specification to the issues shall be . : Beneficial comments (recommendations, additions, deletions) and any perti- : : nent data which may be of use in improving this document should be addressed: : to: Commnder, U.S. Army Chemical Research, Development and Engineering :
6、: Center, ATTN: SMCCR-SFkS, Aberdeen Proving Ground, MD 21010-5423 by using: : the self-addressed Standardization Document Improvement Proposal (DD Form : : 1426) appearing at the end of this document or by letter. AMSC N/A FSC i365 DISTRIBUTION STATEMENT A. Approved for public release; distribution
7、 is unlimited. /THIS DOCUMENT CONTAINS % PAGES. y Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-51537 ( EA I l DKAWINGS I UeS. ARMY CHEMICAL RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 36-2495 36-2-196 36-2-198 36 -2 -1 9 9 36-2-206 36-2-211
8、 36-2-217: 36-2-219 3 6-2-218 Outer Cover Assy Cover, Lug Partition, ATr Body Ventur i-Fuel Chamber Assembly Ring, Clamp Container-, Fuel Block Spacer Fuel Block Assembly (Copies of standards and drawings required by contractors in connection with specific acquisition functions should be obtained fr
9、om the contracting activity or as irected by the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards) , the text of this sg
10、ecification shall take precedence. shall supersede applicable.1aws and regulations unless a specific exemption has been obtained. Nothing in this specification, however, 3. REQUIREMENTS 3.3- Materials. Ai1 materials cited on the component drawings in table I and any subsidiary drawings shall conform
11、 to the specifications listed thereon or to the specific characteristics set forth on the drawings. TABLE I. Component drawings Component : Drawing : : Outer cover assembly : 36-2-195 : : Cover, lug : 36-2-196 : : Partition, air : 36-2-198 : : Body : 36-2-199 : : Ring, clamp : 36-2-211 : : Container
12、, fuel block : 36-2-217 : : Fuel block assembly : 36-2-219 : : Spacer : 36-2-218 : . 3.2 Components. All components shall conform to the specifications and draw- ings listed on the drawings in table I and any subsidiary drawings. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted
13、 without license from IHS-,-,-MIL-S-51537 13 H 777790b 033L(330 W MILS-51537 ( EA) commit 4.2 herein 3.3 Manufacture and assembly. The components shall be manufactured and assembled in accordance with their respective drawings listed in table I. 3.4. Body leakage. The body shall not leak when tested
14、 as specified in 4.4.4.1. 3.5 Ring, clamp weld. The ring, clamp weld shall withstand a torque of no less than 100 inch-pounds and shall show no evidence of defects or damage when tested as specified in 4.4.4.2. 3*6 Fuel block assembly functioning. The fuel block assembly shall burn for no less than
15、8 minutes and no more than i3 minutes when tested as specified in 4.4.4.3. 3.7 Norkmmship. All cmponents shall be free of burrs, chips, sharp edges, cracks, surface defects, nonuniformities, dirt, grease, rust, corrosion pro- ducts, and other foreign matter except as allowed in the applicable drawin
16、g. The cleaning method shall not be injurious to any of the parts. 3.8 First article inspection. Prior to the start of regular production, Requirements for the submission of first article samples of components shall be produced in accordance with this specification for examination and test. first ar
17、ticle samples shall be as specified in the contract (see 6.1). 4 QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. in th
18、e contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved by the Government. -right to perform any of the inspections set forth in the specification where such inspections ar
19、e deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise specified The Government reserves the 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. The inspection set forth in this specification.shal1 become
20、a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all require-
21、 ments of the contract. mission of known defective material, eiher indicated or actual, nor does it Sampling in quality conformance does not authorize sub- the Government to acceptance of defective material. Classification of inspections. The inspection requirements specified . are classified as fol
22、lows: 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-511537 113 9999906 033113311 T W I (a) (b) First article inspection (see 4.3) Quality conformance inspection (see 4.4) 4.3 First article inspection, 4.3.1 Samples. Five first article sampl
23、es of each coaponent shall be pro- duced using the same methods, materials, equipment, and processes as will be used during regular production. 4.3.2 Inspection procedure. As determined by the Government , the first article samples may be subjected to any or all of the examinations and tests specifi
24、ed in this specification and be inspected for compliance with any or all requirements of the applicable drawings. 4.3.3 Rejection criteria. If any first article component sample fails to comply with any of the applicable requirements, the first article component sam- ple shall be rejected. tion upon
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS515371987SMOKEPOTFLOATINGSGF2ANM7A1COMPONENTSFORSGF2ANM7A1 浮动 发烟 构件 PDF

链接地址:http://www.mydoc123.com/p-448123.html