ARMY MIL-P-60814-1967 PROJECTILE AP-T 90MM M318A1 METAL PARTS《M318A1式90 mm曳光穿甲弹(AP-T)用金属件》.pdf
《ARMY MIL-P-60814-1967 PROJECTILE AP-T 90MM M318A1 METAL PARTS《M318A1式90 mm曳光穿甲弹(AP-T)用金属件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60814-1967 PROJECTILE AP-T 90MM M318A1 METAL PARTS《M318A1式90 mm曳光穿甲弹(AP-T)用金属件》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-bOBLi 13 W 777770b 03i3283 L 3M37-oLdx- MIL- P-60814 (MU) i7 April 1967 SUPERSEDSNG FA-PD-MI-2660, Rev. O 30 April i965 MILITARY SPECIFICATION PROJECTILE, AP-T, goMM, 3181 METAL PARTS 1. SCOPE 1.1 This specification covers Projectile, AP-T, goMM, M318A1, Metal Parts. 2. APPLICABLE DOC-S 2.1 Th
2、e following documents of the issue in effect on date of invitation for bids, or request for extent specified herein. proposals, form a part of this specification to the SPECIFICATIONS Military MIL-A-2550 - MIL-M-11472 - Ammunition and Special Weapons, General Specification Magnetic Particle Inspecti
3、on, Process for Ferromagnetic for Materials STANDARDS Federal Federal Test Method Standard No. i41 - Paint, Varnish, Lacquer and Federal Test Method Standard No. i51 - Metals: Test Method Related Materials , Methods of Inspection, Sampling and Testing Military MIL-STD-105 - MIL-STD-109 - MIL-STD-410
4、 - MIL-STD- - MIL-STD- - MIL-STD-Il69 - MIL-STD-1235 - Sampling Procedures and Tables for Inspection by Quality Assurance Terms and Definitions Certification of Penetrant Inspection Personnel Ammunition Data Card Lot Numbering of Ammunition Packaging, Packing and Marking for inert ammunition Single
5、and Multilevel Continuous Sampling Procedures Attributes Components and Tables for Inspection by Attributes B THfS DOCUMENT CONTAINS PAGES. FSC 1315 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bL4 13 7997906 0341282 3 E MIL-P-60814( MU) 2.1
6、 (Contd) DRANINGS Munitions Command F10522523 BO597489 u548604 Ia10522523 D8593429 - Projectile, 9oMM, AP-T M318A1 Metal Parts - Plug and Disc Assembly - Pallet, for Fixed and Semifixed Projectile, Packaging and Marking Index of Inspection Equipment List for Projectile, AP-T, gCMM, M318A1, Metal Par
7、ts - Band seating testing machine indentor and test data. PUBLICATIONS Munitions Command Operating Instructions for Use of Detroit Testing Machine for PA- PD- 792 Band Seating Inspection - Equipment, Testing or Measuring for Ammunition Items (Copies of specifications, standards , drawings , and publ
8、ications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. ) 2.2 Other Publications.-The following documents form a part of this specification to the extent specified herein. Unless othe
9、rwise indicated, the issue in effect on date of invitation for bids or request for proposal shall apply. ASA - B46.1 - Surface Texture, Surface Roughness, Waviness and Lay Technical society and technical association specifications and standards are generally available for reference from libraries. T
10、hey are also distributed among technical groups and using Federal agencies. 3. REQUIREMENTS 3.1 General.,Visual be performed in 4.3.3.1 .Magnetic Particle (Major Defect) .-Each projectile body shall .be.-subjected to a magnetic particle test to determine compliance with 3.2.1. body. Failure of any b
11、ody to comply shall be cause for rejection of the 4.3.3.2 Mechanical Properties. 4.3.3.2.1 Body.-Hardness Pattern - One projec%ile body shall be - selected from each heatof steel in the lot, be used to develop the hardness pattern required by 3.4.c. * 4.3.3.2.2 Rotating Bandi-One projectile body ass
12、embly, after banding but prior to machining of the rotating band, shall be selected from each 8-hour production or fraction thereof for each banding machine in operation to determine compliance with 3.3.2. Failure of the band to comply shall be cause for rejection of the production represented by th
13、e sample. 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bOL9 13 m 79774Ob 0343272 b m 4.3.3.3 Band Seating. 4.3.3.3.1 Tightness.-Ten projectiles from each 1-hour production or fraction thereof per banding machine in operation shall be subj
14、ected to this test to determine compliance with 3.5.4. for rejection of the production processed since the last acceptable test was performed. Failure to comply shall be cause 4.3.3.3.2 Sidewall Contact. -Rotating bands removed as specified under Failure to 4.3.3.2.2 shall be examined to determine c
15、ompliance with 3.5.3. comply shall be cause for rejection of body assemblies represented by the sample. 4.3.3.4 Protective Coating.-The sample size and acceptance criteria for the inspection of the cleaning and the application of the protective coating sh- be as specified in the applicable specifica
16、tion. to comply with the requirements shall be cause for taking the corrective action recommended therein. Failure 4.3.3.5 Assembly (Major Defect).-Each shot assembly shll be visually Failure of any assembly to comply shali be cause for rejection examined to determine compliance with the applicable
17、assembly drawing (10522325). of the assembly. 4.3.4 the Government: Functional.-The following functional tests will be performed by ,. TABLE I Sample Size Test Phase Initial Production Sample Production Sample Penetration Security Velo city-Accuracy 9 10 10 9 5 5 4.3.4.1 Penetration.-The samples sel
18、ected in accordance with Table I will be subjected to this test, to determine compliance with 3.6.1. of any projectile to comply will be cause for rejection of the lot. Failrqe 4.3.4.2 Security.-The samples selected in accordance with Table I, for this phase will be subjected to this test to determi
19、ne compliance with 3.6.2. rejection of the lot. Failure of any projectile to .comply will be cause for 12 . .-;. - -. t: -.:- * - .* . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-hOL9 13 W 9977906 0391293 13 M MIL-P-60814 ( MU) 4.3.4.3 Velo
20、city-Accuracy.-The samples selected in accprdance with Table 1 for this phase will be subjected to this test for information only, except that failwe of any projectile in this seple to comply with 3.62 Will be cause for rejection of-the lot. 4.3.5 Inspection Equipment. -Index of inspection equipment
21、 list . IEL 10522523 identifies the inspection equipment required to perform the examinations and tests prescribed herein, . 4.4 Test Methods and Procedures. 4.4.1 Magnetic particle (major defect) .-The procedures for performing this test shall. be as specified in MIL-M-11472, for direct magnetizati
22、on by the residual method. The suspension shall be tested at the start of each days production and at intervals of not over 4 hours of cntinuous operation, utilizing the procedures and equipment prescribed by MIL-M-11472. After performing the test for solid content of suspension, if it is determined
23、 that it does not comply, with 3.7.3.2 of MIL-M-11472, all bodies that have been accepted since the last satisfactory test was performed, shail be re-inspected after the suspension has been brought up to the proper level. A magnetizing current of 1200 + 50 amperes is required. Either direct current
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP608141967PROJECTILEAPT90MMM318A1METALPARTSM318A1 90 MM 曳光 穿甲弹 APT 金属件 PDF

链接地址:http://www.mydoc123.com/p-446699.html