1、MIL-F-103bLA 13 m 7777706 0272778 2 m i- _ MIL-b-10361A 10 JUNE 1962 SUPERSEDING 19 JUNE 1950 MILF-10361 (ORD) MILITARY SPECIFICATION . FUZE, BASE DETONATING, M58, LOADING, ASSEMBLING ANI) PACKING - This specijication was approved by the Departments of the Armg, the Naw, and the Air Force for the we
2、 of procurement services of the respective Departments. 1. SCOPE 1.1 This specification covers loading, as- sembling, and packing of .M58 base detonat- ing fuze, for use in 37-mm M63 HE shell. 2. APPLICABLE SPECIFICATIONS, STANDARDS, DRAWINGS, AND PUBLI- CATIONS 2.1 The following drawings and all dr
3、aw- ings and specifications referenced thereon, of the issue in effect on date of invitation for bids, form a partof this specification: DRAWINGS ORDNANCE CORPS 73-1-174-Fuze, Base Detonating, M58, 81-3-30 -Machine, Jolt Testing, For 81-3-35 -Machine, Jumble Testing, 8143-37 -Fixture For Jumbling Fu
4、zes, Assembly and Details. Assembled Fuzes, Assembly. Assembly. Assembly and Details. (Copies of specifications and drawings required by contractors in connection with specific procurement functions should be obtained from the procuring agency or as directed by the contracting officer.) 3. REQUIREME
5、NTS 3. MateriaIlMaterials and parts shall be in accordance with applicable specifications and drawings. 3.2 The fuze shall meet all requirements specified on the drawings and ni applicable specifications. 3.3 Jolt and jumble.-The fuze shall with- stand 1,750 jolts in each of the three posi- tions of
6、 the jolt machine; and after com- pletionf the jolt test, the fuzes used in the jolt test shall withstand 3,600 complete revolutions in the jumble machine, without having any: (a) Explosive elements explode; (b) Fuze come apart, (c) Fuze partially or fully arm, (d) Inner parts, including the detonat
7、or, broken, deformed or displaced in such a manner as to make the fuze unsafe to handle or dangerous to fire. (Note.-Broken tetryl pellets will not be a cause for rejection of the lot of fuzes.) 3.4 Proving Ground Test.-No premature burst shall occur and not more than two sam- ple fuzes shallfail to
8、 cause the projectile to burst with high order detonation within 10 feet in rear of the screen. 3.5 Workmanship.-All parts shall be free of chips, dirt, grease, and other foreign ma- terial. The cleaning method used shall not be injurious to any of the parts nor shall the parts be contaminated by th
9、e cleaning agents use$ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ I -_- j MIL-F-L3hLA 23 W 777770b 0272777 4 W O MIl?-1036lA 4. SAMPLING, INSPECTION, AND TEST PROCEDURES 4.1 Lot.-A lot shall consist of fifty thou- sand fuzes, maximum. A smalle
10、r quantity may constitute a lot at the discretion of the inspector. Two thousand plus or minus 600 shall constitute the first lot manufactured on any contract except when a new contract im- mediately follows the manufacture of satis- factory material of the same character. 4.2 Sampling.-All samples
11、shall be se- lected by the inspector. Forty fuzes shall be selected from each lot for tests as specified in r the following paragraphs. Sampling of component materials is prescribed in para- graphs covering tests of the materials. 4.3 1nspeEfion.-Inspection shall be as spec- ified in Specification -
12、MEL-G-2550. 4.4 -Nonarming test of. resistance ring.- Twenty subassemblies each consisting of fir- ing pin, resistance ring, and sleeve, selected by the inspector from each lot before assem- bling the fuzes, shall be tested as follows: 4.4.1 Procedure.-Place each subassembly on a flat steel base, ce
13、ntrally over a hole one- fourth inch in diameter by not less .than three-eighths inch deep, in the base and ap- ply axially to the base of the firing pin the nonarming load specified on the drawing. Apply the load at a rate not to exceed one- eighth inch per minute. If the resistance ring in any sub
14、assembly opens and permits the firing pin to move downward until the resist- ance ring engages in the groove of the firing pin, the resistance ring shall be konsidered to have armed. 4.5 Arming test of resistance ring. 4.5.1 Procedure.-After completion of the nonarming tes, subject the 20 subassembl
15、ies to test as prescribed in 4.4 except that the load shall be the arming load specified on the drawing. Each subassembly of which the resistance ring does not open and permit fir- 2 ing pin to move downward until the resist- ance ring engages in the groove of the firing pin when the load is applied
16、 shall be con- sidered to have failed to arm. 4.5.2 Retest.-A retest, using double the number of samples used in. the original.test, may be made if resquested by the contractor, provided not more than four assemblies fail to arm at the prescribed arming load. 4.6 Determination of graphite content of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF10361A1952FUZEBASEDETONATINGM58LOADINGASSEMBLINGANDPACKINGM58 装载 基地 引爆 引信 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444547.html