ARMY MIL-C-50242-1971 CARTRIDGE 40MM HE M383 BODY ASSEMBLY FOR METAL PARTS《M383型40MM高爆炮弹 金属零件的主体组件》.pdf
《ARMY MIL-C-50242-1971 CARTRIDGE 40MM HE M383 BODY ASSEMBLY FOR METAL PARTS《M383型40MM高爆炮弹 金属零件的主体组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-50242-1971 CARTRIDGE 40MM HE M383 BODY ASSEMBLY FOR METAL PARTS《M383型40MM高爆炮弹 金属零件的主体组件》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C- 50242(MU) 4 August 1971 (See 6.5) - _. MILITARY SPECIFICATION CARTRIDGE, 40MM, HE, M383; BODY ASSEMBLY FOR METAL PARTS 1. SCOPE 1.1 This speciffcation covers the metal parts for one type of body assembly designated as Body Assembly for Cartridge, 4OMM, HE, M383. 2. APPLICABLE DOCUMENTS 2.1 Th
2、e following documents of the issue in effect on date of invita- tion for bids or request for proposal, form a part of this specification to ._ the extent specified herein: SPECIFICATIONS . .I - ?L FEDERAL ! :. =r -? . 7, . - Quality Assmance Terms and , Definitions - Lot Numbering of Ammunition - Pa
3、cking, Packaging and Marking for Shipment of Inert Ammunition Components - Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes . U.S. Army Munitions Command 9238908 - . Body Assembly PUBLICATIONS- AFNY ET 9238908 Equipment Tabulation (Copies of specifications
4、, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer). 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-
5、,- . . MIL-C-50242 13 m 99797Ob 0325794 5 m . 3. REQUIREMENTS 3.1 Material.- Materials shall be in accordance with the applicable drawings and specification. on Drawing-) 9238908 specified in applicable specifications. 3.2 Parts.- The parts shall comply with all requirements specified all associated
6、 drawings , and with all requirements 3.3 Workmanship.- All parts and assemblies shall be fabricated and finished - in a thorough, workmanlike manner. edges, cracks, unblended radii, surface defects, dirt, grease, rust, corrosion products, and other foreign matter. The cleaning method used shall not
7、 be in- jurious to any parts, nor shall the parts be contaminated by the cleaning agents. All marking and stamping shall be neat and sharply defined. They shall be free of burrs, chips, sharp 3.4 Submission of results of contractor-conducted examinations and tests. The contractor shall forward copie
8、s of the results of any of his examinations or tests to the designated address as required by the contract. (See 6.4) 3.5 First article testing.-This specification makes provisions for first Submission of first article quantity by the contractor shall nolled by Government or comercial specifications
9、 referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. evidence of the agents authority to bin
10、d his principal. the agents authority will not be required with subsequent ceptificates unless, during the course of thecontract, this authority is vested in another agent of the certifying organization. The initiai certificate submitted shall be substantiated by Substantiation of 4.2 First article
11、inspection. 4.2.1 Submission.- The- contractor shall submit a first article quantity as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of the following: (See 6.1) i .- =i .- a. b. C. Forty-five (45) body assembl
12、ies after painting. (5 for salt spray) Twenty (20) body assemblies prior to painting, Two (2) stock specimens, each comprised of the width of the stock to be used for production, and the length, equivalent to the circumference of the tool to be utilized for production, shall be selected from the coi
13、l of stock prior to forming the top cup and bottom cup. One sample shall be taken from the beginning of the coil; the other sample shall be taken from the end of the coil. Each specimen shall be identified for the direction of rolling and identified with an index position of the tool. The first arti
14、cle sample shall be submitted and approved prior to initiation of regular production. All parts and completed assemblies submitted shall have been produced by the . contractor (or furnished by a supplier) using the same production processes, procedures and equipment as will be used in fulfilling the
15、 contract, papts and materials, including packaging and packing, shall be obtained from the same sources of supply as will be used in regular production. The sample shall be accompanied by certificates of conformance. A first article quantity, or portion thereof, as directed by the Contracting Offic
16、er, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manufacturing process, material used, drawing, Specification or source of supply as to significantly affect product uniformity as determined by the Government. contra
17、ctorshall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this A sample containing known defects will not be submitted unless.specifically authorized by the Contracting Officer. AU Prior to submission, the .inspection w
18、ith the sample. 4 - Te L-r Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. -. MIL-C-50242 13 9979706 0325796 7 9 . ., 4.2.2 Inspections to be performed.- Assemblies and components will be subjected by the Government to any or all the examinations
19、or tests specified in this specification and any or all requirements of the applicable drawings. 4.2.3 Rejection.- If any assembly or component fails to comply with any of the applicable requirements , the first article quantity shall be rejected. The Government reserves the right to terminate its i
20、nspection upon any failure of an assembly or component in the sample to comply with any of the stated requirements. In the event .of rejection, the Government reserves the right to require the contractor to take corrective action and submit a new first article quantity or portion thereof. . Until a
21、?irst article quantity is accepted, the cantractor is in no way authorized by the Government to resume regular production unless otherwise directed by the Contracting Officer. 4.3 Inspection provisions 4.3.1 Lot formation.- The term “inspection lot“ as used in this specification is defined as an ess
22、entially homogeneous collection of units of product from which a representative sample is drawn and inspected to determine conformance with applicable requirements, The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent
23、 any prior or.subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided the inspection lot has been produced by one manufacturer.$ in one unchanged process, in accordance with the . same drawing, same drawing reyision, same specification and same specification
24、 revision and complies with the provisions for submission of product as specified in MIL-STD-105. safety, performance, interchangeability, or storage, as determined by the Govern- ment, shall not be deemed-to alter the homogeneity of an inspection lot. All material submitted for inspection in accord
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC502421971CARTRIDGE40MMHEM383BODYASSEMBLYFORMETALPARTSM383 40 MM 炮弹 金属 零件 主体 组件 PDF

链接地址:http://www.mydoc123.com/p-441695.html