ANSI INCITS 462 AMD 1-2012 Information Technology C Fibre Channel C Backbone - 5 (FC-BB-5) C Amendment 1.pdf
《ANSI INCITS 462 AMD 1-2012 Information Technology C Fibre Channel C Backbone - 5 (FC-BB-5) C Amendment 1.pdf》由会员分享,可在线阅读,更多相关《ANSI INCITS 462 AMD 1-2012 Information Technology C Fibre Channel C Backbone - 5 (FC-BB-5) C Amendment 1.pdf(38页珍藏版)》请在麦多课文档分享上搜索。
1、American National StandardDeveloped byfor Information Technology Fibre Channel Backbone - 5 (FC-BB-5) Amendment 1INCITS 462-2010/AM1-2012INCITS 462-2010/AM1-2012INCITS 462-2010/AM1-2012Amendment toINCITS 462-2010American National Standardfor Information Technology Fibre Channel Backbone - 5 (FC-BB-5
2、) Amendment 1SecretariatInformation Technology Industry CouncilApproved July 25, 2012American National Standards Institute, Inc.Approval of an American National Standard requires review by ANSI that therequirements for due process, consensus, and other criteria for approval havebeen met by the stand
3、ards developer.Consensus is established when, in the judgement of the ANSI Board ofStandards Review, substantial agreement has been reached by directly andmaterially affected interests. Substantial agreement means much more thana simple majority, but not necessarily unanimity. Consensus requires tha
4、t allviews and objections be considered, and that a concerted effort be madetowards their resolution.The use of American National Standards is completely voluntary; theirexistence does not in any respect preclude anyone, whether he has approvedthe standards or not, from manufacturing, marketing, pur
5、chasing, or usingproducts, processes, or procedures not conforming to the standards.The American National Standards Institute does not develop standards andwill in no circumstances give an interpretation of any American NationalStandard. Moreover, no person shall have the right or authority to issue
6、 aninterpretation of an American National Standard in the name of the AmericanNational Standards Institute. Requests for interpretations should beaddressed to the secretariat or sponsor whose name appears on the titlepage of this standard.CAUTION NOTICE: This American National Standard may be revise
7、d orwithdrawn at any time. The procedures of the American National StandardsInstitute require that action be taken periodically to reaffirm, revise, orwithdraw this standard. Purchasers of American National Standards mayreceive current information on all standards by calling or writing the AmericanN
8、ational Standards Institute.American National StandardPublished byAmerican National Standards Institute, Inc.25 West 43rd Street, New York, NY 10036Copyright 2012 by Information Technology Industry Council (ITI)All rights reserved.No part of this publication may be reproduced in anyform, in an elect
9、ronic retrieval system or otherwise,without prior written permission of ITI, 1101 K Street NW, Suite 610, Washington, DC 20005. Printed in the United States of AmericaCAUTION: The developers of this standard have requested that holders of patents that may berequired for the implementation of the sta
10、ndard disclose such patents to the publisher. However,neither the developers nor the publisher have undertaken a patent search in order to identifywhich, if any, patents may apply to this standard. As of the date of publication of this standardand following calls for the identification of patents th
11、at may be required for the implementation ofthe standard, no such claims have been made. No further patent search is conducted by the de-veloper or publisher in respect to any standard it processes. No representation is made or impliedthat licenses are not required to avoid infringement in the use o
12、f this standard.iForeword (This foreword is not part of American National Standard INCITS 462-2010/AM1-2012.)This amendment is issued in response to questions that have been raised regardingcertain specifications contained in the content of: INCITS 462-2010, Information technology - Fibre Channel Ba
13、ckbone - 5 (FC-BB-5)This amendment was prepared by Technical Committee INCITS/T11 that is responsi-ble for the maintenance of that standard, and was approved by INCITS in order toprovide corrections as quickly as possible in response to questions raised. This amendment is to be considered as part of
14、 the standard and must be used inconjunction with that standard. The amendment may alter the meaning of the stan-dard. Any subsequent revision, erratum, or amendment to the standard may or maynot reflect the contents of this amendment.Replace the existing clauses and subclauses with the following cl
15、auses and sub-clauses:Subclause 2.2Subclause 2.3Subclause 2.5Subclause 2.6Subclause 3.1.13Subclause 3.1.15Subclause 4.3.2Subclause 4.3.3Subclause 4.4.2.2Subclause 4.4.6Clause 6 Requests for interpretation, suggestions for improvement or addenda, or defect re-ports are welcome. They should be sent to
16、 InterNational Committee for InformationTechnology Standards (INCITS), ITI, 1101 K Street, NW, Suite 610, Washington, DC20005.This standard was processed and approved for submittal to ANSI by INCITS. Com-mittee approval of this standard does not necessarily imply that all committee mem-bers voted fo
17、r its approval. At the time it approved this standard, INCITS had thefollowing members:Don Wright, ChairJennifer Garner, SecretaryOrganization Represented Name of RepresentativeAdobe Systems Inc. Scott Foshee Steve Zilles (Alt.)AIM Global, Inc. Steve HallidayApple Helene WorkmanDavid Singer (Alt.)Di
18、stributed Management Task Force John Crandall Jeff Hilland (Alt.)iiOrganization Represented Name of RepresentativeEMC Corporation . Gary Robinson Stephen Diamond (Alt.)Farance, Inc Frank Farance Timothy Schoechle (Alt.)Futurewei Technologies, Inc. Yi ZhaoTimothy Jeffreies (Alt.)Wilbert Adams (Alt.)G
19、S1 US . Frank SharkeyCharles Biss (Alt.)Hewlett-Packard Company Karen Higginbottom Paul Jeran (Alt.)IBM Corporation Alexander TarpinianRobert Weir (Alt.)Arnaud Le Hors (Alt.)Debra Boland (Alt.)Steve Holbrook (Alt.)Gerald Lane (Alt.)IEEE . Jodie HaaszTerry deCourcelle (Alt.)Bob Labelle (Alt.)Intel Ph
20、ilip Wennblom Grace Wei (Alt.)Stephen Balogh (Alt.)Lexmark International. Don Wright Dwight Lewis (Alt.)Paul Menard (Alt.)Jerry Thrasher (Alt.)Microsoft Corporation . Jim Hughes Dick Brackney (Alt.)John Calhoon (Alt.)National Institute of Standards b) outside intervention requesting an initializatio
21、n event; orc) a vendor-specific initialization event.State S1: WAN Down. In this state, Transparent FC-BB devices shall:a) initiate establishment of WAN links, either Transport Trail with a fully operational GFP server inboth directions (see 6.4.8.1) or PW;b) send the Not Operational (NOS) Primitive
22、 Sequence to attached FC_Ports, if any;c) discard any Primitive Signals, Primitive Sequences, or frames received from attachedFC_Ports; andd) discard any prior history of Login Exchange Monitor (LEM) information (see 6.4.3).Transition S1:S1 Any other event. This transition occurs when an event other
23、 than what isspecified in state S1 occurs.Transition S1:S3 WAN link up. This transition occurs when a WAN link up event is detected.State S3: WAN Link Up. In this state, the Transparent FC-BB device shall transmit one or morePING signals to the remote Transparent FC-BB device.Transition S3:S2 PING_A
24、CK/Sufficient buffer resources. This transition occurs upon reception ofat least one PING_ACK signal from the remote Transparent FC-BB device and sufficient bufferresources are available to prevent data loss (see 6.4.7). This transition is not coordinated betweenthe Transparent FC-BB devices at each
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIINCITS462AMD12012INFORMATIONTECHNOLOGYCFIBRECHANNELCBACKBONE5FCBB5CAMENDMENT1PDF

链接地址:http://www.mydoc123.com/p-435766.html