API TR 10TR4-2008 Selection of Centralizers for Primary Cementing Operations (First Edition)《主要粘结操作用定中心装置的选择.第1版》.pdf
《API TR 10TR4-2008 Selection of Centralizers for Primary Cementing Operations (First Edition)《主要粘结操作用定中心装置的选择.第1版》.pdf》由会员分享,可在线阅读,更多相关《API TR 10TR4-2008 Selection of Centralizers for Primary Cementing Operations (First Edition)《主要粘结操作用定中心装置的选择.第1版》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、Selection of Centralizers for Primary Cementing OperationsAPI TECHNICAL REPORT 10TR4FIRST EDITION, MAY 2008Selection of Centralizers forPrimary Cementing OperationsUpstream DepartmentAPI TECHNICAL REPORT 10TR4FIRST EDITION, MAY 2008Special NotesAPI publications necessarily address problems of a gene
2、ral nature. With respect to particular circumstances, local,state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, either express or implied, with respect to the
3、 accuracy, completeness, or usefulness ofthe information contained herein, or assume any liability or responsibility for any use, or the results of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors,consultants, or other assign
4、ees represent that use of this publication would not infringe upon privately owned rights.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; however, the Institute makes no represe
5、ntation, warranty, orguarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API publications are publishe
6、d to facilitate the broad availability of proven, sound engineering and operatingpractices. These publications are not intended to obviate the need for applying sound engineering judgmentregarding when and where these publications should be utilized. The formulation and publication of API publicatio
7、nsis not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standardis solely responsible for complying with all the applicable requirements of that standard. API does not represe
8、nt,warrant, or guarantee that such products do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written p
9、ermission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C. 20005.Copyright 2008 American Petroleum InstituteForewordNothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for themanufact
10、ure, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anythingcontained in the publication be construed as insuring anyone against liability for infringement of letters patent.Suggested revisions are invited and should be submitted to the Standards Departme
11、nt, API, 1220 L Street, NW,Washington, D.C. 20005, standardsapi.org.iiiContentsPage1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Benefits of Centralization . . . . . . . . .
12、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.1 Definition of Standoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.2 Casing Centraliza
13、tion and Centralizing Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 General Discussion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33.1 Centrali
14、zer Types Available . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33.2 Advantages and Limitations of Centralizer Types. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73.3 Sel
15、ecting the Type of Centralizer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83.4 Drag Force vs Standoff Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
16、03.5 Location and Number of Centralizers to Obtain a Desired Standoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123.6 Estimated Drag and Torque When Using Rigid and Solid Centralizers . . . . . . . . . . . . . . . . . . . . . . . . . . . 123.7 Friction Coefficients . . . . . . . .
17、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123.8 Potential Benefit of Centralizer-induced Swirl . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123.9 Centralizer Installatio
18、n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153.10 Use of Dissimilar Materials: Casing-centralizer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183.11 Centraliz
19、er-formation Interactions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183.12 Stop Collar and Integral Collar Holding Forces. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 203.13 Centr
20、alizer Quality Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213.14 Effect of Expansion Coefficient of the Stop Collar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213.
21、15 Potential Impact of Centralizers on Casing String Stiffness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213.16 Compatibility of the Centralizers with Wellbore Fluids. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 223.17 Thermal Stabili
22、ty of the Centralizer Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233.18 Potential Carbon Steel and Chrome Interaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233.19 Potential Generation
23、 of Gases from Materials Under Downhole Conditions. . . . . . . . . . . . . . . . . . . . . . . 233.20 Centralizer Wear During Running in the Hole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Figures1 Definition of Sandoff . . . . . . . . . . . .
24、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Example of a Bow-spring Centralizer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Example of a Double Bow-spring
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APITR10TR42008SELECTIONOFCENTRALIZERSFORPRIMARYCEMENTINGOPERATIONSFIRSTEDITION 主要 粘结 作用 中心 装置 选择 PDF

链接地址:http://www.mydoc123.com/p-430124.html