API TR 10TR3-1999 Technical Report on Temperatures for API Cement Operating Thickening Time Tests 1993 Report from the API Task Group on Cementing Temperature Schedules (First Edit_1.pdf
《API TR 10TR3-1999 Technical Report on Temperatures for API Cement Operating Thickening Time Tests 1993 Report from the API Task Group on Cementing Temperature Schedules (First Edit_1.pdf》由会员分享,可在线阅读,更多相关《API TR 10TR3-1999 Technical Report on Temperatures for API Cement Operating Thickening Time Tests 1993 Report from the API Task Group on Cementing Temperature Schedules (First Edit_1.pdf(112页珍藏版)》请在麦多课文档分享上搜索。
1、Technical Report on Temperatures for API Cement Operating Thickening Time Tests 1993 Report from the API Task Group on Cementing Temperature SchedulesAPI TECHNICAL REPORT 10TR3FIRST EDITION, MAY 1999REAFFIRMED, MAY 2005Technical Report on Temperatures for API Cement Operating Thickening Time Tests 1
2、993 Report from the API Task Group on Cementing Temperature SchedulesUpstream DepartmentAPI TECHNICAL REPORT 10TR3FIRST EDITION, MAY 1999REAFFIRMED, MAY 2005SPECIAL NOTESAPI publications necessarily address problems of a general nature. With respect to partic-ular circumstances, local, state, and fe
3、deral laws and regulations should be reviewed.API is not undertaking to meet the duties of employers, manufacturers, or suppliers towarn and properly train and equip their employees, and others exposed, concerning healthand safety risks and precautions, nor undertaking their obligations under local,
4、 state, or fed-eral laws.Information concerning safety and health risks and proper precautions with respect to par-ticular materials and conditions should be obtained from the employer, the manufacturer orsupplier of that material, or the material safety data sheet.Nothing contained in any API publi
5、cation is to be construed as granting any right, byimplication or otherwise, for the manufacture, sale, or use of any method, apparatus, or prod-uct covered by letters patent. Neither should anything contained in the publication be con-strued as insuring anyone against liability for infringement of
6、letters patent.Generally, API standards are reviewed and revised, reafrmed, or withdrawn at least everyve years. Sometimes a one-time extension of up to two years will be added to this reviewcycle. This publication will no longer be in effect ve years after its publication date as anoperative API st
7、andard or, where an extension has been granted, upon republication. Statusof the publication can be ascertained from the APIUpstream Segment telephone (202) 682-8000. A catalog of API publications and materials is published annually and updated quar-terly by API, 1220 L Street, N.W., Washington, D.C
8、. 20005.This document was produced under API standardization procedures that ensure appropri-ate notication and participation in the developmental process and is designated as an APIstandard. Questions concerning the interpretation of the content of this standard or com-ments and questions concernin
9、g the procedures under which this standard was developedshould be directed in writing to the general manager of the Upstream Segment, AmericanPetroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permissionto reproduce or translate all or any part of the material published h
10、erein should also beaddressed to the general manager.API standards are published to facilitate the broad availability of proven, sound engineer-ing and operating practices. These standards are not intended to obviate the need for apply-ing sound engineering judgment regarding when and where these st
11、andards should beutilized. The formulation and publication of API standards is not intended in any way toinhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the markingrequirements of an API standard is solely responsible for complying wi
12、th all the applicablerequirements of that standard. API does not represent, warrant, or guarantee that such prod-ucts do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic,
13、mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C. 20005.Copyright 1999 American Petroleum InstituteFOREWORDThe American Petroleum Institute (API) Committee 10 (
14、now Subcommittee 10) formed aTask Group in the mid-1980s charged with updating the squeeze-cementing well-simulationtest schedules in API Spec 10 (now API Specications 10A and RP 10B) using a large col-lection of new temperature data. Temperatures in the squeeze schedules had not beenupdated since 1
15、953. The collection of new temperature data was the largest ever available forconsideration in developing temperature correlations for cementing test schedules. Eventu-ally, the scope of the Task Groups work expanded to update all the well-simulation testschedules using the new temperature data. The
16、 potential benet to the industry was great.One goal of the Task Group was to develop the most accurate temperature correlationsfrom the data. Several methods of developing correlations from data were investigated. Rig-orous and thorough analysis of the data was required and eventually completed. Fin
17、ally, acorrelation was developed using statistical regression techniques that provided the lowesterror based on the data.The correlation predicted temperatures that were higher than any previous temperatures inwell-simulation test schedules at depths shallower than about 10,000 feet. This was alarmi
18、ngto users of the test schedules since each set of schedules had been used for about 20 yearswithout evidence of widespread problems with the predicted temperatures.The new temperature data was scrutinized once more. The correlation methods and resultswere reviewed. Previous temperature data sets an
19、d the correlations developed from themwere investigated. All of this was done to:1. Understand the representative range of data contained in each set of data. 2. Determine and understand the methods used to develop the correlations. 3. Compare previous methods to the methods selected by this Task Gr
20、oup and criticallyevaluate each. 4. Select the best methods for development of correlations from the new temperaturedata.Results of this entire effort are summarized in this report. It is our desire to improveunderstanding about how temperature correlations used in API well-simulation test sched-ule
21、s were developed. Each data set used to develop correlations was not representative of allcementing operations. Even the most precise correlations developed from the data may notreect true cementing temperatures. Therefore, each correlation has limitations on the accu-racy of predicted temperatures
22、for a specic cementing operation. However, we rmlybelieve that the temperature correlations prepared by us and those before us are of value tothe industry.Finally, this document has been prepared to leave a clear understanding of the data, analy-sis, and methods upon which the recommendations made a
23、nd adopted by API Committee 10in June 1991 are based. We leave this document as a tool to assist those who may performsimilar work in the future.API publications may be used by anyone desiring to do so. Every effort has been made bythe Institute to assure the accuracy and reliability of the data con
24、tained in them; however, theInstitute makes no representation, warranty, or guarantee in connection with this publicationand hereby expressly disclaims any liability or responsibility for loss or damage resultingfrom its use or for the violation of any federal, state, or municipal regulation with wh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APITR10TR31999TECHNICALREPORTONTEMPERATURESFORAPICEMENTOPERATINGTHICKENINGTIMETESTS1993REPORTFROMTHEAPITASKGROUPONCEMENTINGTEMPERATURESCHEDULESFIRSTEDIT_1PDF

链接地址:http://www.mydoc123.com/p-430121.html